Cross River Rail Project

Started by ozbob, March 22, 2009, 17:02:27 PM

Previous topic - Next topic

nathandavid88

^^ Do you think enough time has passed since Rail Fail for him to come back?

#Metro

How much time would satisfy 'enough'? What additional benefits would waiting longer achieve?

Sterling's experience was not positive, but that said, experiences do not have to be positive to be useful.

The rail fail came about due to the actions of QR, not by actions or omissions by the minister at the time IIRC.

Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

Jonno


HappyTrainGuy

Quote from: #Metro on July 27, 2023, 11:55:04 AMHow much time would satisfy 'enough'? What additional benefits would waiting longer achieve?

Sterling's experience was not positive, but that said, experiences do not have to be positive to be useful.

The rail fail came about due to the actions of QR, not by actions or omissions by the minister at the time IIRC.


Actions of political interference, TMR cost cutting and positions outsourced to tmr/consultants. The writing was on the wall but everyone chose to ignore it and blame someone else rather than growing up and addressing the fundamental issues at play. No one has learnt anything. Christ the same bloody writing is still on the wall. Heading into a new core bit of infrastructure, expansions to the Beenleigh/Gold Coast line and the olympics with issues blearing loud and clear and yet crickets. But what else do you expect from the department of thumbs up and selfies.

Ari 🚋

Quote from: Jonno on July 27, 2023, 16:03:40 PMMost qualified person in the Chamber. - https://greens.org.au/qld/person/michael-berkman

The only problem with this is then the state gov would actually have to build things. Think of all the lost jobs in the glossy brochure industry  :woz:
The best time to break car dependence was 30 years ago. The second best time is now.

Jonno

Quote from: Ari 🚋 on July 27, 2023, 18:41:22 PM
Quote from: Jonno on July 27, 2023, 16:03:40 PMMost qualified person in the Chamber. - https://greens.org.au/qld/person/michael-berkman

The only problem with this is then the state gov would actually have to build things. Think of all the lost jobs in the glossy brochure industry  :woz:
Gold!!!!

ozbob

Couriermail --> Cross River Rail safety failings exposed in injury log showing 'worst record' in Australia $

QuoteDozens of government safety enforcement notices dating back more than three years have exposed a litany of official safety breaches on the $6.3 billion Cross River Rail including hazards posing "serious risk of injury or death".

Workers on the State Government's showpiece Cross River Rail project have been hit by falling objects and exposed to hazards posing "serious risk of injury or death", according to a litany of official safety breaches.

The Sunday Mail has obtained copies of dozens of government safety enforcement notices dating back more than three years on the $6.3 billion infrastructure project after a worker was critically injured this week.

Cross River Rail construction was shut down after Nation "Nash" Kouka was left fighting for life in hospital when he fell up to 12m from scaffolding at the Boggo Rd station site at Dutton Park on Tuesday. ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

InQld --> Persona non grata: Workers return to Cross River Rail, demand Minister be sacked

QuoteWorkers are back on site at Queensland's cross-river rail after a man was critically injured at the multibillion-dollar construction project, but want the Transport Minister sacked over the incident.

Construction, Forestry, Maritime, Mining and Energy Union members walked off the job last week after a 54-year-old man fell up to 10 metres at the Boggo Road station site on Tuesday.

He was taken to the nearby Princess Alexandra Hospital, where he remains in a critical condition.

A CFMEU spokesman confirmed workers were back on site as a workplace health and safety investigation and full site safety audit were under way. ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

RowBro


ozbob

Couriermail --> Two Cross River Rail workers injured in 'near-fatal' accident at problem-plagued Brisbane site $

QuoteTwo Cross River Rail workers have been injured and taken to hospital in another serious safety incident on the showpiece $6.3bn state government project.

In what sources say was a dangerous near-fatality, the workers were hit by a "whipping" concrete pump pipe on the Roma St site last week.

The incident involved the same contractor, Kenny Constructions, which was involved in last month's major accident on the Boggo Rd site which left a worker on life support in hospital.

Kenny Constructions has been hit with Workplace Health and Safety Queensland breach notices over the latest incident, including a stop-work order which found a "serious" risk to safety. ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

achiruel

How is this contractor still allowed on CRR worksites? Pretty clear they don't take safety seriously!

ozbob

Couriermail --> Spot the difference: Cross River Rail site 'sanitised' after accident $

QuoteAn investigation has been launched into allegations that an accident scene on the Cross River Rail project was "sanitised" before State Government workplace health and safety inspectors arrived.

Two workers were hospitalised after a concrete pump "whipping" incident on the Roma St site of the $6.3bn CRR project two weeks ago.

The men were employed by the same company, Kenny Constructions, which was involved in a major accident on the Boggo Rd site in July which left a worker fighting for life in hospital.

Workplace Health and Safety Queensland said it was investigating union claims the Roma St site was cleaned up before the arrival of inspectors after the August 23 accident. ...

https://twitter.com/ozbob13/status/1699472851265544209?
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://statements.qld.gov.au/statements/98653

Cross River Rail underground stations taking shape as first escalators installed

9th September 2023

JOINT STATEMENT

Acting Premier and Minister for the Olympic and Paralympic Games
The Honourable Dr Steven Miles

Minister for Transport and Main Roads and Minister for Digital Services
The Honourable Mark Bailey

. First Cross River Rail escalators installed at future Woolloongabba station

. Once complete, Cross River Rail will transform connectivity across South East Queensland

. Woolloongabba station, where the underground levels are taking shape, will sit in the centre of a major urban renewal precinct

The first of almost 100 escalators to be installed in Cross River Rail's new underground stations are now in place at the project's Woolloongabba site, marking a significant milestone for the transformational project.

The two escalators in the Woolloongabba station cavern are the first of 95 escalators that will progressively arrive to be installed in Cross River Rail's underground stations, including Woolloongabba (24 escalators in total), Albert Street (29), Roma Street (28) and Boggo Road (14).

The installation of the escalators, which are each 12 metres long and weigh 17.5 tonnes, heralds the next phase of construction as the project moves from excavation and bulk civil works to the mechanical and electrical fit out of the stations themselves.

The escalators being installed in the station cavern will take passengers to and from the train platform and station concourse, while even bigger escalators – each 21 metres long and weighing about 26 tonnes – that will take passengers from the surface down into the underground stations are still to come.

Each underground station will also include elevators, which will assist passengers with accessibility needs.

Meanwhile, the future Woolloongabba station itself is progressing well, with 113 of 181 concrete beams now installed for the mezzanine – the level that sits above the platform level.

The platforms themselves are also taking shape, with about 198 metres of the station's 220-metre-long platform completed so far.

Quotes attributed Acting Premier Steven Miles:

"The installation of the first escalators on this transformational project at Woolloongabba is a significant milestone.

"Combined with the progress of the station itself, including the mezzanine and platform levels, you can now really start to picture what these underground stations will look like and the benefits they will bring.

"The Woolloongabba Cross River Rail station, along with Brisbane Metro and the Gabba redevelopment, will sit at the centre of a major urban renewal precinct with more housing, dining and retail options.

"Queenslanders will be able to get off the train and walk or scooter from the Gabba to South Bank and back to the City – the whole area will be revitalised just like Expo 88 transformed South Bank."

Quotes attributed to Transport and Main Roads Minister Mark Bailey:

"Cross River Rail will mean stations in more convenient locations, the capacity to increase train services as our population grows, and public transport will become a more viable option for the whole region, helping to ease congestion on our roads.

"When it comes to these escalators themselves, they are the same ones that will be used by people from all around the world to events for the 2032 Brisbane Olympic and Paralympic Games.

"Just as exciting are the benefits that Cross River Rail is bringing to our economy now, with a new wave of tradies coming on board as the project moves into the mechanical and electrical fit out.

"Workers such as lift and escalator installers, riggers and electricians are now helping to build this transformational project, as it injects about $2.3 million a day into the state's economy.

"Cross River Rail will not only transform the way we travel in the future – it's delivering real benefits now."

ENDS
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

1. Escalator arrival and installation

     

2. Reality to render - Woolloongabba escalators

     

3. Future Woolloongabba station - street to seat

     


4. Future Woolloongabba station - street to seat (2)

     
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://www.couriermail.com.au/news/queensland/qld-politics/nation-nash-kouka-moved-out-of-icu-after-cross-river-rail-accident/news-story/9735a0f87b8eaeb329f77e2630bcf54d

Quote... The Cross River Rail worker who suffered horrific injuries at a workplace incident has been moved out of intensive care, the Transport Minister revealed.

Nation 'Nash' Kouka was left fighting for his life after falling up to 12m from scaffolding at the Boggo Road site in July.

The man was left with multiple injuries and was rushed to the Princess Alexandra Hospital in a critical condition with colleagues fearing for his wellbeing.

But Transport Minister Mark Bailey revealed on Saturday morning Mr Kouka had been taken out of the intensive care unit.

The man remains in a serious condition at the PA where he has been transferred to the orthopaedic unit. ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

🚨 Milestone alert 🚨 The first escalators have now been installed at Woolloongabba station, but this is just the...

Posted by Cross River Rail on Monday, 11 September 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Queensland Parliament Hansard

https://documents.parliament.qld.gov.au/events/han/2023/2023_09_13_DAILY.pdf

Questions Without Notice

Cross River Rail

Mr RUSSO: My question is to the Minister for Transport and Main Roads and Minister for Digital
Services. Can the minister provide an update on Cross River Rail, and is the minister aware of any
other policy position?

Mr BAILEY: I thank the member for Toohey for the question. I wish him a happy 49th birthday—
although I could be a few years out, just to be careful with the record. I thank the member for Toohey for his advocacy. He has a range of stations that we are upgrading as part of the Cross River Rail project. At Rocklea, there is a lot of work being done to make sure it is fully accessible, and then we will be moving over to Salisbury and Moorooka. I thank him for his ongoing support.

It was great to be at the Gabba station on the weekend with the Deputy Premier looking at the
first of 95 escalators now arriving and being installed in the Cross River Rail system. We are seeing
four underground stations being built with escalators, making it that tangible, real thing for commuters to see them arriving. We know that this project would only have happened under this Premier and this government because we took it to not just one but two elections. It is now too late for it to be cut by the Leader of the Opposition, if ever he gets the opportunity. It would only have happened because of the vision of this Premier and this government.

Given the member for Chatsworth's announcement at his own press conference in March that
there will be billions in cuts, the question is what is going to be cut. We know that they cut transport infrastructure last time, they cut Cross River Rail, they cut the train driver training and they sent the contracts overseas. Not a single bit of new rail was built under those opposite. All they did was cut.

What we want to see is commitments from the Leader of the Opposition. Will he cut the station
accessibility program? Will he cut the planning on the Sunshine Coast direct line? Will he cut the Logan and Gold Coast Faster Rail project? We know they have got billions in cuts. How do we know that? Because they tell us. Look at the wry look on the member for Chatsworth's face. He knows that he let the cat out of the bag in March. He let the cat out of the bag and told the truth, but the Leader of the Opposition will not tell the truth because he will not tell us what the cuts will be.

We can only look to the past, and that is that the Leader of the Opposition called Campbell
Newman 'special' in the Gavin King book. He said it himself. What do we have on the opposition side?
Newman government minister, Newman government minister, Newman government minister, Newman
government minister, Newman government minister, Newman government minister, Newman
government minister, assistant Newman government minister and assistant Newman government
minister. It is 8½ years later, and who is running the show? It is the old Newman crew. We know their
style. They cut, they sack and they sell. They will be trying to hide that from Queenslanders every day until the election. What we want is a bit of honesty. They have said they will cut billions. The member for Chatsworth said that. What will they be?
(Time expired)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Cross River Rail Southside Station Upgrades - Mid-2023 Construction Update (July 2023)

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

A year in the making 🚂 Check out this birds eye view of the progress at Roma Street. The station has now begun rising up out of the ground. What a difference 12 months can make!

Posted by Cross River Rail on Thursday, 14 September 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

❓ DID YOU KNOW ❓ Not only were Cross River Rail's twin tunnels completed all the way back in 2021 but they now have...

Posted by Cross River Rail on Thursday, 21 September 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

A beautiful morning to visit Dutton Park Station! Awnings & platforms are going in, making it a bit more...

Posted by Mark Bailey MP on Tuesday, 26 September 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

It's beginning to look a lot like a station 🎶 The first of the architectural panels have started to be installed at...

Posted by Cross River Rail on Thursday, 28 September 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

An amazing visit to the Roma St Cross River Rail site this morning. Panelling going in, the same panels you'll walk...

Posted by Mark Bailey MP on Thursday, 5 October 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

So exciting to see the render of Rocklea station and the progress it has made so far! That new bridge is looking 👍🤌 Cross River Rail

Posted by Mark Bailey MP on Friday, 6 October 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Jonno

#8548
Quote from: ozbob on October 08, 2023, 06:57:25 AM

So exciting to see the render of Rocklea station and the progress it has made so far! That new bridge is looking 👍🤌 Cross River Rail

Posted by Mark Bailey MP on Friday, 6 October 2023


Yet this is the zoning around the station...  Yes there is flooding but to the North-East there isn't.  Yet Low Density Residential. 

Low Density Zoning

SteelPan

With Mark, it's all exciting and amazing.....looking forward to getting the train to Coolangatta in a few days time...ohhh...that's right!
SEQ, where our only "fast-track" is in becoming the rail embarrassment of Australia!   :frs:

SteelPan

Quote from: ozbob on October 08, 2023, 05:39:12 AMhttps://x.com/ozbob13/status/1710741085063131526?s=20

QT/QR the nations [likely the developed worlds] most expensive outfits for transport/rail delivery!
SEQ, where our only "fast-track" is in becoming the rail embarrassment of Australia!   :frs:

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

HappyTrainGuy

#8552
Not as it seems. Basically it's getting CRR to come to the table. Hazard pay basically. If you don't improve safety conditions or take it seriously as is the case with CRR you pay the workers more. Also incentivises non union members to join and should it get to strike/go slow/tools down action it will have a bigger impact in regards to contract payments to CPB. It does add costs to the project aswell which then has the extra effect of politatians stepping in trying to minimise the damage when it comes to election time as not to look bad and get voted out. In Bailey's case he's starting to rack up the number of own goals so he'll try to be shifting blame/distancing himself publicly while getting the department/authority to sort it out in the back end.

It has got your attention though hasn't it which was the point.

ozbob

https://documents.parliament.qld.gov.au/tableOffice/questionsAnswers/2023/1018-2023.pdf

Question on Notice
No. 1018
Asked on 12 September 2023

MR J KRAUSE ASKED MINISTER FOR TRANSPORT AND MAIN ROADS AND MINISTER FOR DIGITIAL SERVICES (HON M BAILEY)

QUESTION:

Will the Minister provide an explanation of the project 'Cross River Rail Tunnel Maintenance Plant'
on page 46 of QTRIP?

ANSWER:

I thank the Member for Scenic Rim for the question.

The Cross River Rail Tunnel Maintenance Plant line item on page 46 of the Queensland Transport
and Roads Investment Program 2023–24 to 2026–27 refers to the hi-rail transport and
maintenance equipment that will be required for Queensland Rail to complete ongoing routine
maintenance in the new Cross River Rail tunnels.

The new tunnels have specifications that are unique to the rest of the South East Queensland rail
network managed by Queensland Rail and, as such, require equipment that will cater to those
specifications to ensure the tunnels are appropriately and safely maintained.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Deep beneath Albert Street in the heart of Brisbane CBD. It's becoming clear just how awesome a trip down to our new...

Posted by Cross River Rail on Thursday, 12 October 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Visited Fairfield Station this morning to see the Cross River Rail team putting on the finishing touches. The station...

Posted by Mark Bailey MP on Thursday, 12 October 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

What's Happening at the Cross River Rail Underground Stations - August to October 2023

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Boggo Road station as part of Cross River Rail 👌 The active transport bridge has been lifted in and it is absolutely...

Posted by Mark Bailey MP on Monday, 23 October 2023
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The four new underground stations being delivered as part of Cross River Rail will each have their own unique station...

Posted by Cross River Rail on Thursday, 26 October 2023
Half baked projects, have long term consequences ...