Author Topic: Perth Airport train line  (Read 7810 times)

Offline verbatim9

  • Member
  • *****
  • Posts: 4452
Re: Perth Airport train line
« Reply #40 on: February 28, 2020, 06:02:38 PM »
« Last Edit: February 29, 2020, 12:53:57 AM by ozbob »

Offline verbatim9

  • Member
  • *****
  • Posts: 4452
Re: Perth Airport train line
« Reply #41 on: February 28, 2020, 06:04:11 PM »
https://youtu.be/Wj6VAJF7wII
^^No surcharge to and from Airport Central station Total travel time in each direction to and from Perth CBD is 18mins.
« Last Edit: February 28, 2020, 06:17:23 PM by verbatim9 »

Offline Gazza

  • Member
  • *****
  • Posts: 5347
Re: Perth Airport train line
« Reply #42 on: February 28, 2020, 06:46:15 PM »
https://youtu.be/Wj6VAJF7wII
^^No surcharge to and from Airport Central station Total travel time in each direction to and from Perth CBD is 18mins.
Edit your post instead of quoting yourself ??? ::)

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94427
    • RAIL Back On Track
Re: Perth Airport train line
« Reply #43 on: March 02, 2020, 03:18:22 PM »
Rail Express --> Metronet Airport Central Station now 70 per cent completed

Quote
The construction of Metronet’s Airport Central Station in Perth is 70 per cent complete with the first roof modules installed last week.

The first girders of Airport Central Station’s 137-tonne steel roof structure have been craned into place, with the steel fabricated locally by Naval Base company Pacific Industrial Co.

The $1.86 billion Forrestfield-Airport Link is jointly funded by the Australian and Western Australian governments and will deliver a new rail service to the eastern suburbs of Perth – with three new stations at Redcliffe, Airport Central and Forrestfield.

Rita Saffioti, WA Transport Minister said that, until now, the construction of Airport Central Station has been largely underground with significant excavation undertaken to build the three-level railway hub.

The roof modules will be craned into place over a three-month period, before specially designed sheeting is installed.

“While most works to date have been largely hidden, construction of this massive roof structure marks a new phase in above-ground construction for this project – an architectural milestone,” Saffioti said.

The roof installation comes as TBM Grace, the first tunnel-boring machine, finishes its work, having broken through into the Bayswater Station dive structure on February 18.

TBM Sandy is expected to break through towards the middle of the year to complete the project, and by end of their three-year journey, the machines will have travelled eight kilometres each.

At Skybridge level, the steel frame for the link between the station entry and the 280-metre-long elevated walkway has been constructed with travelators and information screens installed.

WA Premier, Mark McGowan, said about 2,000 jobs have been created on this project alone, with more than 700 people currently employed, and 70 jobs created as part of the Skybridge project.

“The Forrestfield-Airport Link is an important part of Metronet and when it opens next year it will provide an accessible public transport link for thousands of Western Australians and tourists,” McGowan said.
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94427
    • RAIL Back On Track
Re: Perth Airport train line
« Reply #44 on: April 21, 2020, 03:59:09 PM »
Rail Express --> TBM Sandy breaks through at Bayswater

Quote
Tunnelling is complete on the Forrestfield-Airport Link, part of the Metronet project in Western Australia.

On April 20, tunnel boring machine Sandy broke through at the Bayswater dive structure. WA Premier Mark McGowan said that the completion of tunnelling is a “major milestone” for WA.

“While Western Australia has been grappling with COVID-19, TBM Sandy and the project team have been continuing to work on this incredible project for Perth.”

The breakthrough ended 900 days of tunnelling under Perth Airport and the Swan River, creating 16 kilometres of tunnels, two twin 8km tunnels.

Now that tunnelling is finished, track will start to be laid from July 2020. The track slab is half installed while construction and fit out of the station buildings continues.

“In times like these it’s important we continue to progress projects that will provide work for local businesses and keep workers in their jobs, ultimately supporting the State’s wider economy,” said McGowan.

The tunnels, made with 9,000 tunnel rings comprising 54,000 locally made concrete segments, link three stations, Forrestfield, Airport Central, and Redcliffe to the wider rail network.

WA Transport Minister Rita Saffioti thanked those who have worked on the project so far.

“In July 2017, Premier Mark McGowan and I were at the Forrestfield Station site to mark the start of tunnelling on the Forrestfield-Airport Link,” she said.

“Thank you to the tunnelling team and other workers who delivered TBM Sandy to her destination and helped achieved this major milestone.”

The $1.86bn Forrestfield-Airport Link provides over 700 jobs in Western Australia, and is one of six Metronet projects underway in 2020.

The tunnelling for the Forrestfield-Airport Link was conducted by a joint venture of Salini Impregilo and NRW Civil and Mining which won the design and construct contract, along with a 10 year maintenance contract, in April 2016.
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 


“You can't understand a city without using its public transportation system.” -- Erol Ozan