• Welcome to RAIL - Back On Track Forum.
 

BNE: Brisbane Airport

Started by ozbob, August 29, 2012, 02:29:15 AM

Previous topic - Next topic

ozbob

From the Brisbanetimes click here!

Skywalk, car park unveiled in $350m Brisbane Airport improvements

QuoteSkywalk, car park unveiled in $350m Brisbane Airport improvements
August 28, 2012 - 6:32PM Tony Moore

Brisbane was perfectly positioned to take advantage of the rapid expansion in Asia's travelling middle classes, federal Transport Minister Anthony Albanese said at Brisbane Airport today.

In this city this afternoon to formally open $350 million in improvements to Brisbane's Domestic Terminal, Mr Albanese said Queensland would benefit from China and Vietnam's growth.

"Air traffic fom China alone last year grew at some 42 per cent and the potential growth from the rising middle class in China, India, Indonesia and Vietnam is absolutely extraordinary," Mr Albanese said.

"And the people who visit Australia, will want to visit Queensland."

Earlier this month airline China Southern announced it would boost services between Brisbane and its base in China's third-largest city, Guangzhou, from four to seven a week, meaning there are now daily flights between Brisbane and China.

Chinese visitors into Cairns grew by 40 per cent in 2011, according to Tourism Queensland.

Brisbane Airport Corporation this afternoon hosted Mr Albanese at a function to mark the formal opening of a new nine-storey car park, a "skywalk" between the car park and domestic terminal, and changes to the road network in front of the domestic terminal.

Changes to the short-term parking situation would finally be ready in mid-September.

Mr Albanese said the next expansion stage of Brisbane Airport was the new parallel runway - to be completed by 2020 - and the upgrade of the existing domestic terminal buildings.

Brisbane Airport Corporation - which has a 99-year lease to run the Brisbane Airport - must have the final version of its Brisbane Airport Master Plan in place in about 18 months.

It would include the final details of the orientation of Brisbane's new parallel runway, which has just started preliminary ground work.

"But it also has to go through processes which include environmental impact statements and similar issues," Mr Albanese said.

Today he praised the work of Californian environmental artist, Ned Kahn, who has designed a huge artwork mounted on front of the new car park.

Mr Kahn, who was at Brisbane's domestic airport today, said he had fun working on what he described as a "gem of a parking garage".

He said he got the idea for the artwork after seeing a mast reflected in the water of the Brisbane River.

"I was taking photographs and I got intrigued with the reflection of a ship's mast in the river," he said.

"It was the way that the straight line of the mast got warped by the waves.

"So I took a bunch of photographs of it and basically we superimposed the line of the warped mast on this huge facade."

The artwork includes 117,643 aluminium panels, manufactured in China, and finally assembled by hand in Brisbane earlier this year.

Brisbane Airport's acting CEO Tim Rothwell said the new domestic terminal was being slowly changed to cope with congestion at the "terminal face".

In the existing plans Brisbane was going to copy the plan used in Sydney and Melbourne, and at Brisbane's International terminal, with check-ins upstairs and arrivals downstairs, he said.

"We have re-planned that," Mr Rothwell said.

"This involves elevating the passenger above the road to create significantly more road capacity in the long-term."

Travelling plans were changing, with an increase in short-travel journey, meaning more travellers with limited baggage, he said.

"We are seeing people without bags upstairs and people with bags downstairs."

"So in time - this skywalk we are on - will break into the (domestic terminal) building at the upper level, delivering a seamless trip through to the gate."

"So for the business traveller, or even the leisure traveller , without having to check in bags, they will have a very streamlined process through the airport."

In six to eight years, Brisbane Airport Corporation plans to widen the skywalk "mouth", where it entered the terminal building, to allow passengers, baggage, security and extra retail space, he said.

"I would imagine the domestic terminal will be improved prior to the new runway opening," he said.

Read more: http://www.brisbanetimes.com.au/travel/travel-news/skywalk-car-park-unveiled-in-350m-brisbane-airport-improvements-20120828-24ygq.html
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Jonno

I am intrigued by an environmental artist being excited by working on Brisbane's Biggest Car Park.  ??

Golliwog

Quote from: Jonno on August 29, 2012, 13:08:49 PM
I am intrigued by an environmental artist being excited by working on Brisbane's Biggest Car Park.  ??
Publicly available one, maybe. But surely this one at the Port of Brisbane is bigger?

Back on topic though, I'm looking forward to the re-do of the domestic terminal. As I understand it, they want to get rid of having the Qantas area and the Jet Star area, and just focus on using the gates efficiently. I also think having the Skywalk connect directly to the train station is a great move as well, and should help drive patronage in the future.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

somebody

Quote from: rtt_rules on August 29, 2012, 17:07:08 PM
What I did notice was the new roads into the airport, makes a big difference.
Indeed.  Paid for with the public purse at a price well above the price of the airtrain.  Sounds like a successful policy to me.  :pr

Jonno

Quote from: rtt_rules on August 29, 2012, 17:07:08 PM
What I did notice was the new roads into the airport, makes a big difference.

For a $1Billion you would b$%&^$y hope so.  Give it 12 mths and the congestions will return

WTN

Is there still congestion at the terminal face after all those road upgrades are completed?
Unless otherwise stated, all views and comments are the author's own and not of any organisation or government body.

Free trips in 2011 due to go card failures: 10
Free trips in 2012 due to go card failures: 13

HappyTrainGuy

My experience from driving there is that its seemless using the flyover over the gateway compared to previous times with that stupid bloody roundabout they had there. In saying that there is still bottlenecks/congestion for the domestic terminal which is only the result of people lane changing like its the final lap of the Indy 500 as drivers slow down, speed up, swap two to three lanes at a time while trying to figure out which lane they are supposed to be in when it suddenly goes from two lanes to five lanes with new people to the road and regular users with knowledge of the road. International terminal is alot easier to access now as you don't have to contend with the same traffic heading to the domestic terminal. Drop off at the Domestic Terminal is alot better than it was a few years ago. Traffic managment is also better returning from the airport. It was expensive but something similar should have been built in the first place with domestic and international terminals beside each other like that.

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳