Terms of use Privacy About us Media Contact

Poll

Overall performance for 2010.  Consider timetable, congestion, routes, integration with other transport modes as applicable.

4 or less
1 (16.7%)
5
0 (0%)
6
2 (33.3%)
7
3 (50%)
8
0 (0%)
9
0 (0%)
10
0 (0%)

Total Members Voted: 5

Author Topic: Brisbane North  (Read 1485 times)

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 92677
    • RAIL Back On Track
Brisbane North
« on: November 28, 2010, 07:26:21 AM »
Have your say!
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 92677
    • RAIL Back On Track
Re: Brisbane North
« Reply #1 on: December 16, 2010, 05:49:02 PM »
Score 6.2
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 


“You can't understand a city without using its public transportation system.” -- Erol Ozan