Terms of use Privacy About us Media Contact

Poll

Overall performance for 2010.  Consider timetable, congestion, routes, integration with other transport modes as applicable.

4 or less
2 (33.3%)
5
1 (16.7%)
6
2 (33.3%)
7
1 (16.7%)
8
0 (0%)
9
0 (0%)
10
0 (0%)

Total Members Voted: 5

Author Topic: Sunshine Coast  (Read 1592 times)

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 92624
    • RAIL Back On Track
Sunshine Coast
« on: November 28, 2010, 07:23:47 AM »
Have your say!
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 92624
    • RAIL Back On Track
Re: Sunshine Coast
« Reply #1 on: December 16, 2010, 05:50:07 PM »
Score 5.3
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 


“You can't understand a city without using its public transportation system.” -- Erol Ozan