http://www.translink.com.au/servicechange.php?id=192

Caboolture Line track work from Lawnton to Bald Hills Effective 22 November 2009

From 7.50am to 3.20pm Sunday 22 November, scheduled track work will occur on the Caboolture Line.

All services between Lawnton and Bald Hills stations will be replaced by bus services.  Normal train services will run from Bald Hills to Brisbane City.

Delays of up to 30 minutes may be experienced. Guardian train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=189

Shorncliffe Line track work between Shorncliffe and Northgate Effective 20 November 2009

From 8pm Friday 20 November to 2pm Sunday 22 November, scheduled track work will occur on the Shorncliffe line.

All services between Shorncliffe and Northgate stations will be replaced by bus services.  Normal train services will run from Northgate to Brisbane City.

Delays of up to 30 minutes may be experienced. Guardian train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=189

Shorncliffe Line track work between Shorncliffe and Northgate Effective 20 November 2009

From 8pm Friday 20 November to 2pm Sunday 22 November, scheduled track work will occur on the Shorncliffe line.

All services between Shorncliffe and Northgate stations will be replaced by bus services.  Normal train services will run from Northgate to Brisbane City.

Delays of up to 30 minutes may be experienced. Guardian train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=193

Gold Coast/Robina Line track work from Robina to Nerang Effective 27 November 2009

From 8pm Friday 27 November to last train Sunday 29 November, scheduled track work will occur on the Robina line.

All services between Robina and Nerang stations will be replaced by bus services.  Normal train services will run from Nerang to Brisbane City.

Delays of up to 30 minutes may be experienced. Guardian train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=243

Beenleigh line track closure between South Brisbane and Moorooka Effective 23 November 2009

From 10pm to 5am on Monday 23 November, Tuesday 24 November, Thursday 26 November (excluding Wednesday 25 November) the Beenleigh line between South Brisbane and Moorooka stations will be closed.

All services between South Brisbane and Moorooka stations will be replaced by bus services. There will be connecting trains to Brisbane City from South Brisbane station.

Delays of up to 30 minutes may be experienced. Guardian Train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=194

Cleveland Line track work from Lindum to Dutton Park Effective 28 November 2009

From first train Saturday 28 November to last train Sunday 29 November, scheduled track work will occur on the Cleveland line.

All services between Lindum and Dutton Park stations will be replaced by bus services.  Normal train services will run from Cleveland to Lindum.

Delays of up to 30 minutes may be experienced. Guardian train services may be affected during this track closure.

TransLink thanks passengers for their patience during this time.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

This is a lot of track work.
Maybe they found the problem and are going to fix it?
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

http://www.translink.com.au/servicechange.php?id=262

Caboolture Line track work between Northgate and Bald Hills Effective 5 December 2009

From 9pm Saturday 5 December to 9am Sunday 6 December, scheduled track work will occur on the Caboolture line.

All services between Northgate and Bald Hills stations will be replaced by bus services (stopping at all stations). Connecting train services will operate between Northgate and Brisbane City.

Delays of up to 30 minutes may be experienced. Guardian train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=263

Roma Street to South Brisbane and Corinda track work Effective 6 December 2009

From 7.20pm to last service Sunday 6 December, all lines between Roma Street and South Brisbane and Roma Street and Corinda will be closed for scheduled track work.

All services between these stations will be replaced by bus services.

Ipswich line: Buses will stop all stations between Corinda and Roma Street with connecting Ipswich train services departing Corinda.

Beenleigh/Robina line: Buses will stop at all stations between South Brisbane and Roma Street Stations, with connecting Beenleigh and Gold Coast train services departing South Brisbane.

Cleveland line: Cleveland services will run via Dutton Park, with buses stopping at all stations between Dutton Park and Roma Street. Connecting Cleveland train services  to will operate from Dutton Park.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=264

Ipswich/Rosewood Line track work between Milton to Corinda - effective 13 December 2009

From first service to last service Sunday 13 December, all lines between Milton and Corinda will be closed for scheduled track work.

All services between Roma Street and Corinda stations will be replaced by bus services, with connecting Ipswich train services departing Corinda.

Passengers travelling on services running via the Tennyson Loop and South Brisbane will not be affected by this closure.

Delays of up to 30 minutes may be experienced. Guardian train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

#10
http://www.translink.com.au/servicechange.php?id=265

Ipswich/Rosewood Line track work between Corinda and Rosewood - effective 20 December 2009

From first service Saturday 19 December to last service Sunday 20 December, all lines between Corinda and Rosewood stations will be closed for scheduled track work as part of the Corinda to Darra upgrade project.

All services between Corinda and Rosewood stations will be replaced by bus services stopping all stations, with connecting Brisbane City train services departing Corinda.

Delays of up to 30 minutes may be experienced. Guardian train services may be affected during this track closure.

--------------

Comment:  This might be the weekend the temporary platform at Darra west of the footbridge is brought into operation.  See --> here for temporary platform.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=350

Beenleigh/Gold Coast line track work - Kingston to Ormeau - effective 16 January 2010

From 4.00pm Saturday 16 January to 4.00am Sunday 17 January 2010, all Queensland Rail services between Kingston and Ormeau stations will be replaced by bus services.

Buses will stop all stations between Kingston and Ormeau, with connecting train services to Brisbane City. Airport services will run direct from Ormeau to the Airport.

Delays of up to 30 minutes may be experienced.  Guardian Train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=351

Ipswich line track work - Roma Street to Corinda - effective 24 January 2010

From 8.00pm to the last train on Sunday 24 January, all Queensland Rail services between Roma Street and Corinda stations on the Ipswich line will be replaced by bus services.

Buses will stop all stations between Roma Street and Corinda, with connecting train service to Ipswich.

Services travelling via the Tennyson Loop will not be affected by this notice.

Delays of up to 30 minutes may be experienced.  Guardian Train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=352

Ipswich/Rosewood line track work - Corinda to Rosewood - effective 29 January 2010

From 8.00pm Friday 29 January to the last train Sunday 31 January 2010, all Queensland Rail services between Corinda and Rosewood stations will be replaced by bus services.

Buses will stop all stations between Corinda and Rosewood, with connecting train services to Brisbane City.

This track work is part of the Corinda to Darra Upgrade Project to provide more services on the Ipswich line in the future.  Along with the new track, Oxley and Darra Stations are being upgraded with new facilities, security, accessibility and extra parking.

Delays of up to 30 minutes may be experienced.  Guardian Train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=416

Caboolture line track work from Geebung to Petrie - effective 13 February 2010

From 9pm Saturday 13 February to 9am Sunday 14 February, all QR services between Geebung and Petrie stations will be replaced by bus services.

Buses will stop at all stations between Geebung and Petrie, with connecting train services to Caboolture and Brisbane City.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=417

Cleveland line track work from Dutton Park to Lindum - effective 20 February 2010

From first train Saturday 20 February to last train Sunday 21 February, all QR services between Dutton Park and Lindum stations will be replaced by bus services.

Buses will stop all stations between Dutton Park and Lindum, with connecting train services to Cleveland and Brisbane City.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=419

Ipswich line track work from Roma Street to Corinda - effective 28 February 2010

From 8pm to last train Sunday 28 February 2010, all QR services between Corinda and Roma Street stations will be replaced by bus services.

Buses will stop at all stations between Corinda and Roma Street, with connecting train services to Brisbane City.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=415

Ipswich line track work from Roma Street to Corinda - effective 7 February 2010

From 8pm to last train Sunday 7 February, all QR services between Roma Street and Corinda stations will be replaced by bus services.

Buses will stop all stations between Roma Street and Corinda, with connecting train services to Ipswich.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=418

Ipswich line track work from Corinda to Roma Street - effective 19 February 2010

From 11pm Friday 19 February until 5.30pm Sunday 21 February 2010, all QR services between Corinda and Roma Street stations will experience 10 minute delays.

This will also affect NightLink services.  All Nightlink services on this line from 2.00am to 5.30am on Sunday 21 February will be replaced by buses.

Guardian train services may be affected during this track closure.

People travelling to the Soundwave Festival at the RNA Showgrounds on Saturday should take this closure into account when planning their journey.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

#19
http://www.translink.com.au/servicechange.php?id=455

Ipswich line track work from Corinda to Rosewood - effective 5 March 2010

From 8.00pm Friday 5 March to 4.00pm Sunday 7 March 2010, all QR services between Corinda and Rosewood stations will be replaced by bus services. Buses will stop all stations between Corinda and Rosewood, with connecting train services to Brisbane City.

This track work is part of the Corinda to Darra Upgrade Project.  Along with the new track, Oxley and Darra Stations are being upgraded with new facilities, security, accessibility and extra parking.


NOTE:  This notice has been removed from TransLink web site, still on?

The notice had been shifted in position and I missed.  The closure is still on, despite the rain.  Checked out the first train to connect with buses last evening at Corinda.  It ran direct into platform 5 from town, highlighting the value of the new crossover arrangements between Sherwood and Corinda.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=456

Ipswich line track work from Roma Street to Corinda - effective 7 March 2010

From 8.00pm to last train Sunday 7 March, all QR services between Roma Street and Corinda stations will be replaced by bus services. Buses will stop all stations between Roma Street and Corinda, with connecting train services to Ipswich.

QR will be carrying out track maintenance work during this time.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=457

Ipswich line track work from Corinda to Rosewood - effective 20 March 2010

From first train Saturday 20 to last train Sunday 21 March, all QR services between Corinda and Rosewood stations will be replaced by bus services. Buses will stop all stations between Corinda and Rosewood, with connecting train services to Brisbane City.

This track work is part of the Corinda to Darra Upgrade Project.  Along with the new track, Oxley and Darra Stations are being upgraded with new facilities, security, accessibility and extra parking.

Delays of up to 30 minutes may be experienced.  Guardian Train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=458

Ipswich line track work from Roma Street to Corinda - effective 28 March 2010

From 8.00pm to last train Sunday 28 March, all QR services between Roma Street and Corinda stations will be replaced by bus services. Buses will stop all stations between Roma Street and Corinda with connecting train services to Ipswich and Rosewood.

QR will be carrying out track maintenance work during this time.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=494

Darra station - inbound platform temporary closures - effective 13 March 2010

Darra station inbound platform (platform 4) will be closed for upgrades on the following weekends:

   * Saturday 13 March to Sunday 14 March 2010
   * Saturday 27 March to Sunday 28 March 2010
   * Saturday 3 April to Sunday 4 April 2010
   * Saturday 17 April to Sunday 18 April 2010
   * Saturday 24 April 2010.


Shuttle buses will take all inbound passengers from Darra to Oxley station for rail connections to Brisbane City and other lines. go card holders please touch on at Oxley. Passengers should allow an extra 10 minutes for connections.

Passengers travelling to Darra station from stations between Rosewood and Gailes can catch shuttle services at Wacol station. go card holders please touch off at Wacol.

Outbound passengers will not be affected by this closure.

The platform will be closed to ensure passenger safety while while structural steel installation, concreting, roofing and electrical work is taking place. When completed, this work will provide improved facilities for Darra station customers.

QR and TransLink appreciate your patience as we build a better system.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Arrangements at Darra.

Platform 4 closed this weekend.  (The change in numbering of platforms has occurred apparently - the new platform 1 is taking shape of course).
Shuttle buses Darra to Oxley  (platform 3 temporary open).

Details --> http://www.translink.com.au/servicechange.php?id=494


Checked out the arrangements, all good.  Plenty of convenient mini-buses, signage and personnel in attendance.















Photographs R Dow 13th March 2010
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=502

Ipswich line track work from Rosewood to Corinda - effective 10 April 2010

From first train Saturday 10 April to 4pm Sunday 11 April, all QR services between Rosewood and Corinda stations will be replaced by bus services. Buses will stop all stations between Rosewood and Corinda, with connecting train services to Brisbane City.

Delays of up to 30 minutes may be experienced. Guardian train services will be affected by this closure.

This will also affect NightLink services. All Nightlink services on this line from 2.00am to 5.30am on Sunday 11 April will be replaced by buses.

This track work is part of the Corinda to Darra Upgrade Project. Along with the new track, Oxley and Darra Stations are being upgraded with new facilities, security, accessibility and extra parking.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=503

Ipswich line track work from Roma Street to Corinda - effective 11 April 2010

From 8.00pm to last train Sunday 11 April, all QR services between Roma Street and Corinda stations will be replaced by bus services. Buses will stop all stations between Roma Street and Corinda with connecting train services to Ipswich and Rosewood.

Delays of up to 30 minutes may be experienced.  Guardian Train services will be affected during this track closure.

This closure will allow work to continue on the Indooroopilly Turnout replacement, which will provide a smoother and quieter ride switching from one track to another.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=556

Caboolture/Sunshine Coast track closure - effective 8 May 2010

Due to track work on the Caboolture and Nambour/Sunshine Coast lines, buses will replace trains at the following times:

Petrie to Caboolture

    * First train to 9pm Saturday 8 May
    * 9am to 9pm Sunday 9 May.

Petrie to Gympie North

    * 9pm Saturday 8 May to 9am Sunday 9 May
    * 9pm to last train Sunday 9 May.

Buses will stop all stations with connecting train services to Brisbane City will depart from Petrie station. Delays of up to 30 minutes may be experienced.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=554

Sunshine Coast line track work from Nambour to Gympie North - effective 1 May 2010

From 6pm Saturday 1 May to 9am Sunday 2 May, all trains between Nambour and Gympie North stations will be replaced by bus services, stopping all stations. Connecting train or RailBus services to Brisbane City will depart from Nambour station.

Delays of up to 30 minutes may be experienced.

Footbridge temporarily closed

The pedestrian footbridge at Cooroy train station will be closed for repairs from 4pm Saturday to 2am Sunday as part of these works. A bus will be provided for customers wishing to cross to the other side of the station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=561

Ipswich/Rosewood line track work from Corinda to Rosewood - effective 22 May 2010

From the first train on Saturday 22 May until 4pm Sunday 23 May, all trains between Corinda and Rosewood train stations will be replaced by buses, stopping at all stations.

Connecting train services to Brisbane City will depart from Corinda station.

Delays of up to 30 minutes may be experienced. Guardian train services will be affected during this track closure.

This track work is part of the Corinda to Darra Upgrade Project to provide more services on the Ipswich line in the future. Along with the new track, Oxley and Darra stations are being upgraded with new facilities, security, accessibility and extra parking.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=565

Roma Street to South Brisbane and Corinda track closures - effective 16 May 2010

From 7.20pm until the last train on Sunday 16 May, buses will replace all trains between Corinda and Roma Street stations and between South Brisbane and Roma Street stations.

Delays of up to 30 minutes may be experienced.

Ipswich line

Buses will stop all stations between Roma Street and Corinda stations. Connecting train services to Ipswich will depart from Corinda station. Connecting train services to all other lines will depart Roma Street station.

Beenleigh and Gold Coast lines

Buses will stop all stations between Roma Street and South Brisbane stations. Connecting train services to Beenleigh and Gold Coast depart from South Brisbane station. Connecting train services to all other lines will depart from Roma Street station.

Cleveland line

Buses will stop all stations between Roma Street and Dutton Park stations (on the Beenleigh line). Connecting train services to Cleveland depart from Dutton Park station. Connecting train services to all other lines will depart from Roma Street station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=560

Ipswich line track work from Roma Street to Corinda - effective 23 May 2010

From 8pm until the last train on Sunday 23 May, all trains between Corinda and Roma Street train stations will be replaced by buses, stopping all stations.

Connecting train services to Ipswich will depart from Corinda station.

Delays of up to 30 minutes may be experienced. Guardian train services will be affected during this track closure.

==============

http://www.translink.com.au/servicechange.php?id=562

Ipswich line track work from Roma Street to Corinda - effective 30 May 2010

From 7.20pm until the last train on Sunday 30 May, all trains between Corinda and Roma Street train stations will be replaced by buses, stopping all stations.

Connecting train services to Ipswich and Rosewood will depart from Corinda station.

Delays of up to 30 minutes may be experienced. Guardian train services will be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?id=555

Ipswich/Rosewood line track work from Corinda to Rosewood - effective 1 May 2010

From the first train on Saturday 1 May until last train on Monday 3 May, all trains between Corinda and Rosewood train stations will be replaced by buses stopping all stations. Connecting train services to Brisbane City will depart from Corinda station.

Delays of up to 30 minutes may be experienced. Guardian train services will be affected during this track closure.

The NightLink service to Ipswich, departing Roma Street at 3.53am Saturday, will operate via Yeerongpilly Station.

Passengers travelling to Willowbank for the V8 Supercar races should catch a shuttle bus to the event from either Corinda or Ipswich stations.

This track work is part of the Corinda to Darra Upgrade Project to provide more services on the Ipswich line in the future. Along with the new track, Oxley and Darra stations are being upgraded with new facilities, security, accessibilty and extra parking.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/service.php?461

Upcoming changes

   Major disruption: Roma Street to Corinda track work

      From 8.00pm until last train on Monday 14 June, all trains between Roma Street and Corinda stations will be replaced by buses.

      Buses will stop all stations between Roma Street and Corinda. Connecting train services to Ipswich will depart from Corinda.

  Major disruption: Roma Street to Corinda track work

      Sunday 6 June 2010 from 8.00pm until last train Sunday 6 June, all trains will be replaced by buses between Corinda and Roma Street train stations.

      Buses will stop all stations between Roma Street and Corinda on the Ipswich line. Connecting train services to Ipswich will depart from Corinda.

Minor disruption: Roma Street to Corinda track work

      From 7.20pm until the last train on Sunday 30 May, all trains between Corinda and Roma Street train stations will be replaced by buses, stopping all stations.

      Connecting train services to Ipswich and Rosewood will depart from Corinda station.

      Delays of up to 30 minutes may be experienced. Guardian train services will be affected during this track closur
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/service.php?461

# Roma Street to Corinda track work

From 8.00pm until last train on Monday 14 June, all trains between Roma Street and Corinda stations will be replaced by buses.

Buses will stop all stations between Roma Street and Corinda. Connecting train services to Ipswich will depart from

==============

http://www.translink.com.au/service.php?463

# Major disruption: Caboolture to Gympie North track work

From 5.00pm Saturday 12 June until 9.00am Sunday 13 June, all trains between Caboolture and Gympie North train stations will be replaced by buses.

Buses will stop all stations between Caboolture and Gympie North. Connecting train services to Brisbane City will depart from Caboolture.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?1276830251

Merivale Bridge temporary closure

From 11pm Friday 2 July until last train Sunday 4 July all trains between Central and South Brisbane train stations will be replaced by buses while Merivale Bridge is closed for track work.

Buses will stop all stations between Central and South Brisbane stations, with connecting train services to Beenleigh, Cleveland and Gold Coast from South Brisbane station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

#36
http://www.translink.com.au/service.php?461

Corinda to Rosewood track work

From first train Saturday 10 July until last train Sunday 11 July, all trains between Corinda and Rosewood stations will be replaced by buses.

     Buses will stop all stations between Corinda and Rosewood stations, with connecting train services to Brisbane City.

     This closure will allow work to continue on the upgrade between Corinda and Darra stations on the Ipswich line, as well as track work at Wulkuraka station on the Rosewood line.


Roma Street to Darra track work

     From 2pm until last train Sunday 18 July, all trains between Roma Street and Darra stations will be replaced by buses.

     Buses will stop all stations between Roma Street and Darra stations, with connecting train services to Brisbane City.

     This closure will allow upgrade works at Corinda station, and ongoing track work near Indooroopilly station.


Roma Street to Corinda track work

     From 8pm until last train Tuesday 27 July, all trains between Roma Street and Corinda stations will be replaced by buses.

     Buses will stop all stations between Roma Street and Corinda stations, with connecting train services to Ipswich.

     This closure will allow for track work to continue near Indooroopilly station.


Bowen Hills to Corinda track work

     From 11pm Saturday 31 July until 4.50am Sunday 1 August, all trains in Brisbane City will be replaced by buses.

     Buses will stop at all CBD stations, with northbound trains departing from Bowen Hills station.

     Buses will stop all stations between Bowen Hills and Corinda stations. Connecting train services to Ipswich will depart from Corinda.

     This closure will allow for signalling upgrades in the CBD.


Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

stephenk

Quote from: ozbob on June 22, 2010, 11:30:19 AM
http://www.translink.com.au/servicechange.php?1276830251

Merivale Bridge temporary closure

From 11pm Friday 2 July until last train Sunday 4 July all trains between Central and South Brisbane train stations will be replaced by buses while Merivale Bridge is closed for track work.

Buses will stop all stations between Central and South Brisbane stations, with connecting train services to Beenleigh, Cleveland and Gold Coast from South Brisbane station.

Why are trains not reversing at Roma Street? As far as I'm aware, trains cannot reverse at Central, so it's an odd place to terminate services.

Quote from: ozbob on June 22, 2010, 11:35:26 AM
http://www.translink.com.au/service.php?461

Bowen Hills to Corinda track work

      From 11pm Saturday 31 July until 4.50am Sunday 1 August, all trains in Brisbane City will be replaced by buses.

      Buses will stop at all CBD stations, with northbound trains departing from Bowen Hills station.

      Buses will stop all stations between Bowen Hills and Corinda stations. Connecting train services to Ipswich will depart from Corinda.

      This closure will allow for signalling upgrades in the CBD.


Despite this closure affecting every line, Translink have so far only put this notice up online for selected lines (Gold Coast, Ipswich/Caboolture).
Evening peak service to Enoggera* 2007 - 7tph
Evening peak service to Enoggera* 2010 - 4tph
* departures from Central between 16:30 and 17:30.

ozbob

http://www.translink.com.au/service.php?455

Bowen Hills to South Brisbane track work

      From 11pm Saturday 31 July until 4.50am Sunday 1 August, all trains in Brisbane City will be replaced by buses.

      Buses will stop at all CBD stations, with northbound trains departing from Bowen Hills station.

      Bbuses will stop all stations between Bowen Hills and South Brisbane. Connecting train services will depart from South Brisbane.

      This closure will allow for signalling upgrades in the CBD.


Yeerongpilly to Banoon track work

      On Sunday 25 July, all trains between Yeerongpilly and Banoon stations will be replaced by buses.

      Buses will stop all stations between Yeerongpilly and Banoon stations. Connecting train services to Brisbane City will depart from Yeerongpilly station. Connecting train services to Beenleigh and Varsity Lakes will depart Banoon station. Buses will run directly from Banoon station to Brisbane Airport.

      This closure will allow for bridge works between Salisbury and Coopers Plains, resurfacing and resealing the Boundary Road level crossing at Coopers Plains, and overhead line maintenance.


Merivale Bridge temporary closure

      From 11pm Friday 2 July until last train Sunday 4 July all trains between Central and South Brisbane train stations will be replaced by buses while Merivale Bridge is closed for track work.

      Buses will stop all stations between Central and South Brisbane stations, with connecting train services to Beenleigh, Cleveland and Gold Coast from South Brisbane station.


Kingston to Kuraby track work

      From first train until 6.00am Sunday 27 June, all trains between Kingston and Kuraby train stations will be replaced by buses.

      Buses will stop all stations between Kingston and Kuraby stations. Connecting train services to Brisbane will depart from Kuraby station. Connecting train services to Beenleigh will depart from Kingston station.

      Delays of up to 30 minutes may be experienced. Guardian Train services may be affected during this track closure.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/service.php?456

Petrie to Gympie North track work

From 8.30pm Saturday 17 July until 6.30am Sunday 18 July, all trains between Petrie and Gympie North stations will be replaced by buses.

Buses will stop all stations between Petrie and Gympie North stations, with connecting train services to Brisbane City.

This closure will allow track and overhead line maintenance between Petrie and Gympie North.
Half baked projects, have long term consequences ...