• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

Yes, that was the first outbound train after services resumed.  :-c
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 12.32pm

30 Sep 2010

15 mins delay for services on Caboolture Line, Nambour Line between Petrie and Caboolture due to track fault. Service to resume by 4:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 3.02pm

30 Sep 2010

Services for Caboolture Line, Nambour Line have resumed as normal.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 3.26pm

30 Sep 2010

Disruptions on Gold Coast Line due to police incident. Expect 15 mins delay. Service to resume by 4:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 3.37pm

30 Sep 2010

Services for Gold Coast Line have resumed as normal.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Robert_Dow
 
Oh dear 15 minutes delay CBD line signal fault .. this can affect all lines ...  Just received an erail sms alert
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 1.19pm

5 Oct 2010

30 mins delay for services on Caboolture Line due to crossing issue. Service to resume by 3:00 PM.

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Derwan

erail 1:34pm

Services for Caboolture Line have resumed as normal.
Website   |   Facebook   |  Twitter

ozbob

erail 6.30am

8 Oct 2010

15 mins delay for services on Cleveland Line due to signalling fault. Service to resume by 8:00 AM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 6.55am

8 Oct 2010

25 mins delay for services on Cleveland Line due to signalling fault. Service to resume by 8:00 AM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

Maybe a boom gate and bridge collision tally thread?

Quote

Trains on the Cleveland line are running behind time after a car struck a boom gate this morning.

The incident occurred at a level crossing at Cavendish Road, Coorparoo, in Brisbane's south, about 7.30am.

There are also reports of heavy traffic delays.
Advertisement: Story continues below

Trains were suspended before being allowed to pass through the area.

There were delays of up to 18 minutes but a Translink spokesman said that had been reduced to five minutes.

Police are at the scene.

A police spokeswoman said there were no reports of injuries.

http://www.brisbanetimes.com.au/queensland/crossing-collision-delays-morning-trains-20101008-16abr.html
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

erail 7.07pm

8 Oct 2010

30 mins delay for services on Ipswich/Rosewood Line due to signalling fault. Service to resume by 8:30 PM.

================

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Not a nice night to be marooned on the Ippy, now is it ...

===========

http://www.translink.com.au/servicechange.php?1286528937

Ipswich train delays

Passengers travelling on the Ipswich line can expect delays of about 30 minutes due to an electrical fault between Redbank and Dinmore Stations caused by extreme weather conditions.

Buses will convey passengers between Redbank and Dinmore Stations.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ   
 
Buses running between Bundamba & Goodna stations due to signalling fault.
2 minutes ago via Mobile Web
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Sunshine Coast line between Caboolture and Elimbah delayed up to 15 mins due to level crossing incident at McKean St in Caboolture.

25 minutes ago  via Mobile Web 

==============

:-[
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 3.01pm

10 Oct 2010

15 mins delay for services on Gold Coast Line due to signalling fault. Service to resume by 4:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Trains on the Beenleigh and Gold Coast lines are delayed up to 20 minutes due to a signal failure at Bethania.
20 minutes ago via Mobile Web
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail  4.11pm

10 Oct 2010

30 mins delay for services on Gold Coast Line due to signalling fault. Service to resume by 5:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob



QuotePhotograph 23/9/67, by Dr J W F Scrimgeour,

At Yeerongpilly, a triangular junction is formed between the 3' 6" South Coast line and the Corinda branch. The standard gauge Interstate line runs parallel, and crosses through the two sides of the triangle serving the Corinda line, resulting in a very interesting layout.

In this view, the double-track main line curves left of the signal cabin towards Southport after passing through the island platform station just out of view on the left. A steam locomotive is proceeding round the triangle towards Corinda, and is just about to cross the single Interstate line. Beneath the cameraman (who is on the station footbridge) is the Down Goods Loop, whilst the line adjacent to the Interstate line is the Weighbridge Road. The wagons on the left are in the Up Sidings, which serve the Intercolonia Boring Company (yes, really!) which is the large building in the background bearing their initials on the roof.

Just visible beyond the signal cabin is the standard gauge locomotive depot which served the Interstate line.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 5.01pm

10 Oct 2010

Services for Gold Coast Line have resumed as normal.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Sunshine Coast line services between Glasshouse & Beerburrum stations replaced by buses due to storm damage. Extra travel time est 30 mins.
8 minutes ago via Mobile Web
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?1286737916

Sunshine Coast train line disruption - Glasshouse

Trains between Glasshouse and Beerburrum stations are being replaced by buses due to storm damage to overhead power lines.

Connecting trains are operating from Beerburrum to Caboolture and on to Brisbane. Passengers should allow an extra 30 minutes to travel.

Buses are arranged for travel between between these stations.

The 7.08am Kuraby to Bowen Hills service has been cancelled due to the damaged power lines.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane
 
QR: We now have overhead power back between Glass house Mountains and Beerburrum and train services between these stations have resumed.
6 minutes ago via TweetDeck
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane
 
QR: The is a track fault at Dinmore and trains have been suspended from running through Dinmore.
less than 10 seconds ago via TweetDeck
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?1286742034

Ipswich Line services suspended

Services on the Ipswich line between Redbank and Bundamba are suspended, due to a track fault.
Bus services are being arranged to convey passengers between these two stations.

Trains services will continue to travel between Redbank and the City.
Inbound services are holding at Ipswich, where passengers can take arranged buses.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 6.31am

11 Oct 2010

Disruptions on Ipswich/Rosewood Line due to extreme weather. Expect 1 hr delay. Service to resume by 9:00 AM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?1286742911

Tennyson line services suspended

Tennyson Line services are suspended between Corinda and Yeerongpilly, due to track flooding.

Buses are being arranged for passengers travelling between these stations
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane
 
QR; There is also a track fault at Tennyson on the Tennyson Line. Taxis being arranged.
less than 20 seconds ago via TweetDeck
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?1286742034

Ipswich/Rosewood line returning to normal

Services on the Ipswich/Rosewood line are returning to normal after the track was flooded at Dinmore.

Delays up to 30 minutes are expected to continue during this morning's peak.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 7.17am

11 Oct 2010

30 mins delay for services on North Coast Line due to extreme weather. Service to resume by 7:30 AM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?1286742034

Ipswich/Rosewood line delays

Services on the Ipswich/Rosewood line are returning to normal after the track was flooded at Dinmore.

The 7.20am Ipswich-Bowen Hills and 7.27am Corinda-Bowen Hills trains are both cancelled.

Delays up to 30 minutes are expected to continue during this morning's peak on most other services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane
 
QR: On the Caboolture line, a tree has fallen over the tracks between Nambour and Yandina.
6 minutes ago via TweetDeck
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 7.42am

11 Oct 2010

1 hr delay for services on North Coast Line due to extreme weather. Service to resume by 8:00 AM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane
 
QR: The tree between Nambour and Yandina cleared away at 07:50 and train services have now been resumed between Nambour and Yandina.
half a minute ago via TweetDeck
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?1286748108

Caboolture line train delays

Customers on the Caboolture line may experience delays up to 15 minutes due to the wet weather.

Some trains at Petrie station may also be affected by flooding across tracks close to the station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky



ozbob

First time I can recall sparks running through the water in recent times ..

Meanwhile ..

Twitter

#  TransLinkSEQ
 
Ipswich/Rosewood line services are returning to normal after the track was flooded at Dinmore. Up to 15 min delays on other train services. half a minute ago via web


# TransLink SEQ
 
Tennyson Line train services are returning to normal after earlier flooding across the tracks.
3 minutes ago via web
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

A report from facebook apparently has water over part of the Ferny Grove line. Not sure where but I would assume near Ferny Grove station where it crosses the Kedron Brook. No reports of trains not running on TL website, although IIRC last time this happened they did suspend services.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

STB

Might be possible.  The Courier Mail is reporting Samford Rd at Keperra (near the tavern) is closed due to flooding.

🡱 🡳