Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

aldonius

Currently just gotten moving again on train just inbound of Windsor.

We need to have/maintain a model of holding trains at stations, not between them. I appreciate that Windsor in to Bowen Hills is a bit of an edge case, but it's super frustrating knowing that there are frequent buses 300m away from me that I could've hopped on if the train was held at the station.

Edit to update: stopped again on the hill. Gold Coast train to our left started moving as we stopped, so that'll be another few minutes.

Upgrading request to a model of reversing the train back into the station.

#Metro

Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

aldonius

#8283
Bowen Hills P1 as normal. Feels slower going to FV. Stopped just past the tunnel. Suspect we're running on red lights.

Trains going northbound on the P2/P4 tracks, so that's OK.

Edit: just picked up a Springfield train alongside us on the P3 tracks.

At FV. All platforms seem to be in conventional use.

Edit2: Central and Roma St as normal. Looks like the fault is fixed and we're down to residual impacts.

SurfRail

Quote from: #Metro on February 22, 2018, 17:26:54 PM
Ho hum... Just sign the QR contract yet again... :hg

Mind telling me how privatising would actually fix any of these issues?
Ride the G:

#Metro

Great question. Let's have an EOI process and put that question to the candidate operators and QR itself. Fantastic idea!
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

achiruel

Quote from: SurfRail on February 22, 2018, 17:46:24 PM
Quote from: #Metro on February 22, 2018, 17:26:54 PM
Ho hum... Just sign the QR contract yet again... :hg

Mind telling me how privatising would actually fix any of these issues?

It wouldn't. Both the best (TransPerth) and worst (QR), IMO at least, rail systems in Australia, are publicly-owned and run. Ownership is irrelevant, competence is, and that is what QR seems to be seriously lacking.

#Metro

^ QR is incompetent... so let's sign them on again.
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

brissypete

And seems the track problems have moved to Central now (6:41pm)

30 min delays: All train lines due to a points fault at Central. http://bit.ly/2EKzaVO  #TLAlert #TLSpringfieldline #TLSunshinecoastline

3 strikes and your out seems appropriate....


ozbob

https://translink.com.au/service-updates/170141

5.53am Central - Doomben train delayed 10 mins

The 5.53am Central to Doomben train is delayed 10 minutes due to a mechanical issue.

This train is now due to arrive at Doomben station at 6.26am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/170731

12.34pm Domestic Airport-Central train delayed 15 mins

The 12.34pm Domestic Airport to Central train is delayed 15 minutes minutes due to a signal fault.

This train is now due to arrive at Central station at 1.14pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/170736

12.59pm Central-Varsity Lakes train delayed 15 mins

The 12.59pm Central to Varsity Lakes train is delayed 15 minutes due to a signal fault.

This train is now due to arrive at Varsity Lakes station at 2.37pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/170871

6.55am Ferny Grove-Central train cancelled Ferny Grove-Keperra

The 6.55am Ferny Grove to Central train has been cancelled between Ferny Grove and Keperra stations due to a mechanical issue.

The next Ferny Grove to Keperra train will depart Ferny Grove at 7.02am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/170876

6.55am Varsity lakes-Central train cancelled

The 6.55am Varsity lakes to Central train has been cancelled due to train crew displacement.

The next Varsity Lakes to Central train will depart Varsity lakes at 7.10am.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

SurfRail

Ride the G:

aldonius


techblitz

2 days in a row a cancellation between 6.30/7am.....lets see if they can go 3/3 tomorrow.
Id be interested to know which station all seats were taken....Beenleigh?....tis a 50min ride in from there....

SurfRail

Quote from: techblitz on February 28, 2018, 14:38:02 PM
2 days in a row a cancellation between 6.30/7am.....lets see if they can go 3/3 tomorrow.
Id be interested to know which station all seats were taken....Beenleigh?....tis a 50min ride in from there....

Helensvale, possibly Coomera.
Ride the G:

not_available

Not sure if there was any announcements about this online, but the 4:07 pm Ipswich - Kippa-Ring train arrived 4 minutes late at Central, stopped for 2 minutes before Northgate, and was stopped for a while at Geebung station (long enough for the next kippa-ring service to overtake) and in the end it was 19 minutes late by the time it branched off at Petrie.
Do I really need to clarify?
Sarcasm and rhetorical questions don't translate perfectly into written form, do they?

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/171561

Trains suspended: Airport line

Airport line trains are suspended in both directions between Eagle Junction and Domestic Airport stations due to a points fault. Customers can expect delays of up to 60 minutes.

Technicians are en route.

Alternative transport being arranged to transport customers.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

A number of cancellations already. Daughter #2 reports Springfield service cancelled at Roma Street 1 minute notice.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

verbatim9

On a NGR heading north train lost power at Coomera. They are still trying to reboot the train.

Train regained power after 5 mins on the way now.

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/172011

11.59am Roma Street-Gympie North train cancelled Roma Street-Caboolture

The 11.59am Roma Street to Gympie North train has been cancelled from Roma Street to Caboolture due to a mechanical issue.

The next Roma Street to Gympie North train will depart Roma Street Station at 5.00pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

BrizCommuter

Quote from: ozbob on March 04, 2018, 12:38:35 PM
https://translink.com.au/service-updates/172011

11.59am Roma Street-Gympie North train cancelled Roma Street-Caboolture

The 11.59am Roma Street to Gympie North train has been cancelled from Roma Street to Caboolture due to a mechanical issue.

The next Roma Street to Gympie North train will depart Roma Street Station at 5.00pm.

So only a 301 minute delay then?

ozbob

Mayne yard was full of trains ... once upon a time another unit would have been turned out and train ran, even if late ..

Meanwhile ..

https://twitter.com/TransLinkSEQ/status/970175806621343744
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/172111

7.11am Caboolture-Central train cancelled

The 7.11am Caboolture to Roma Street train has been cancelled due to a mechanical issue.

The next Caboolture to Roma Street train will depart Caboolture at 7.23am.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳