• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

https://translink.com.au/service-updates/169171

8.35am Caboolture-Albion train cancelled

The 8.35am Caboolture to Albion train has been cancelled due to a mechanical issue.

The next Caboolture to Central train will depart Caboolture Station at 9.05am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/169206

5.00pm Roma Street-Gympie North train delayed 20mins

The 5.00pm Roma Street to Gympie North train is delayed 20 minutes due to a mechanical issue.

This train is now due to arrive at Bowen Hills Station station at 5.28pm. An additional stop has been added at Albion station, arriving at 5.30pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Cazza

How does the train reach Bowen Hills before Albion. Translink do seem to love the thought of time travel :bna:

red dragin

Quote from: Cazza on February 17, 2018, 18:46:16 PM
How does the train reach Bowen Hills before Albion. Translink do seem to love the thought of time travel :bna:

Roma Street - > Bowen Hills - > Albion - > Gympie North

I think you misread the direction of travel.

Cazza


achiruel

I must be confused. Isn't the CBD closed this weekend, so wouldn't the train be commencing at Albion anyway?  :conf

Cazza

It wasn't the one of the clearest notices distributed, sending mixed messages just to add to the already confusing weekend with the track closures.

HappyTrainGuy

The train ran straight out of Mayne to Bowen Hills before turning around and heading north. I can't remember if the IMU100/120 replaced it and ran late as a result of the change or the issue was resolved and thus ran late as there were a few other issues with some units not too long before.

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz

#8249
8 mins late on an outbound kippa ring station......was supposed to be at Carseldine by now....only just arrived northgate station.....wont hear about this delay because its less than 10mins...

edit: missed 680 connection 28 mins til next one. :thsdo

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

Trespasser in the corridor between Petrie and Kallangur according to one of their replies on that twitter.

ozbob

Quote from: red dragin on February 19, 2018, 17:39:14 PM
Trespasser in the corridor between Petrie and Kallangur according to one of their replies on that twitter.

Thanks. I wish they would just say so ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on February 19, 2018, 17:42:35 PM
Quote from: red dragin on February 19, 2018, 17:39:14 PM
Trespasser in the corridor between Petrie and Kallangur according to one of their replies on that twitter.

Thanks. I wish they would just say so ...

In the end they did ..   :P

https://twitter.com/QueenslandRail/status/965495896015122432
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 6.55am Varsity Lakes to Central train will run express between Beenleigh and Park Road stations due to a door issue. The next Varsity Lakes to Central train will depart Beeneligh station at 7.41am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Ha! I was heading out to Booval earlier this morning and I noted a freight train coming off the branch at Bundamba. Should have stuck around. Heading back to Booval I noted a lot of down and up trains. Asked staff what was going on said a failure on the crossing at Bundamba.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

At Redbank noted two LE DEL down, assume had something to do with recovery of failed train.. Noted QR recovery crew still in location at Bundamba.



Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

bretto82

Ballast train lost traction coming up the bank held the level crossing protection active on Brisbane road

ozbob

Quote from: bretto82 on February 21, 2018, 12:23:54 PM
Ballast train lost traction coming up the bank held the level crossing protection active on Brisbane road

Thanks explains the interesting morning!   :P
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/169766

4.30pm Nambour to Central train delayed 15 mins

The 4.30pm Nambour to Central train is delayed 15 minutes due to an earlier mechanical issue.

This train is now due to arrive at Central Station at 6.43pm
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

achiruel

What's to stop this happening during the Games and showing the rest of the Commonwealth how useless and inept QR is?

ozbob

Quote from: achiruel on February 22, 2018, 07:12:21 AM
What's to stop this happening during the Games and showing the rest of the Commonwealth how useless and inept QR is?

Nothing I expect.  At least today's problem would be a good lesson in recovery.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz

social media is absolutely rife with complaints....both pages.....too many failures to list....not even going to bother...

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: techblitz on February 22, 2018, 08:58:33 AM
social media is absolutely rife with complaints....both pages.....too many failures to list....not even going to bother...

I did a brief interview on ABC Gold Coast just before 9am.  I said the tweets were good, but there needed to be better direct communication with passengers on platforms.  I spoke with SurfRail who was inbound on a flyer around 8am.  He said that was the one area that needs improvement.   I see the QR Facebook has some feedback about that too. 
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz

they need to release the exact reason what caused it.....hopefully they will shortly...

achiruel

I just can't believe there's issues like this in a line that was completely closed for trackwork less than a fortnight ago.

ozbob

As I understand it one of the OHT cables just snapped.  Rare event.  What does seem to occur a little bit more often is a dewirement, when the pantographs pull down the OHT wires.  These sort of issues are just a fact of life of OHT.  Albeit rare ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

When it rains, it pours ..

==================

https://translink.com.au/service-updates/170051

20 min delays: All train lines

All train lines are delayed up to 20 minutes in both directions due to a track fault at Fortitude Valley.

Technicians en route.

==================

https://twitter.com/QueenslandRail/status/966564442971422720
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳