• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

https://translink.com.au/service-updates/155856

6.34am Central-Beenleigh train delayed 13 mins

The 6.34am Central to Beenleigh train is delayed 13 minutes due to an operational issue.

This train is now due to arrive at Beenleigh station at 7.53am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/155861l

Airport Trains: Terminating at Eagle Junction

All airport trains will terminate at Eagle Junction due to a points fault at Airport Junction.

Buses have been arranged to transport customers between Eagle Junction and Domestic Airport stations.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

*** DING DING DING ***

Catch the train - Miss the Plane!

:bg:
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

https://translink.com.au/service-updates/155871

7.54am Cleveland-Central train cancelled Cleveland-Thorneside

The 7.54am Cleveland to Central train has been cancelled between Cleveland and Thorneside stations due to a points fault at Airport Junction.

The next Cleveland to Central train will depart Thorneside at 8.37am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156261

5.18pm Kippa-Ring - Central train cancelled Kippa-Ring - Mango Hill

The 5.18pm Kippa-Ring to Central train has been cancelled from Kippa-Ring to Mango Hill due to a previous police incident.

The next Kippa-Ring to Central train departs Kippa-RIng station at 5.47pm
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Cazza

https://translink.com.au/service-updates/156486

"5.39pm Springfield Central - Central train service altered

The 5.39pm Springfield Central to train has been cancelled from Springfield Central to Darra due to a medical emergency.
A replacement Springfield Central to Central train will depart Springfield Central at 5.49pm."

Can we please commend QR for a second here. They have finally started to (hopefully) provide a replacement train for a cancelled service. They have turned an empty dead-runner (I'm assuming heading back to the depot) into a service that will actually be able to pick up passengers rather than wave past the stranded commuters.

Now they have finally proved it isn't that hard after all (which is what we have been saying). Hopefully, we will start to see more of this in the future.

ozbob

https://translink.com.au/service-updates/156551

2.29pm Central - Varsity Lakes train delayed 15 mins

The 2.29pm Central to Varsity Lakes train is delayed 15 minutes due to a police incident at Bethania.

This train is now due to arrive at Varsity Lakes station at 4.17pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156561

3.18pm Beenleigh - Roma Street train delayed 11 mins

The 3.18pm Beenleigh to Roma Street train is delayed 11 minutes due to a previous police incident.

This train is now due to arrive at Roma Street station at 4.33pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156566

3.48pm Beenleigh - Central train running express Salisbury - Dutton Park

The 3.48pm Beenleigh to Central train will run express from Salisbury to Dutton Park stopping only at Yeerongpilly due to a previous police incident.

The next Salisbury to Dutton Park train will depart Salisbury at 4.13pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156596

10.10am Varisty Lakes-Yeerongpilly station train cancelled

The 10.10am Varisty Lakes to Yeerongpilly station train is cancelled due to a mechanical issue.

The next Varisty Lakes to Yeerongpilly station train will depart Varisty Lakes station at 10.40am.

=====================

https://translink.com.au/service-updates/156611

2.21pm Yeerongpilly-Varstiy Lakes train stopping all stations

The 2.21pm Yeerongpilly to Varstiy Lakes train is stopping all stations from Woodridge to Varstiy Lakes due to an earlier mechanical issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156626

5.08pm Bowen Hills-Gympie North train delayed 20 mins

The 5.08pm Bowen Hills to Gympie North train is delayed up to 20 minutes due to passenger loading.

This train is now due to arrive at Gympie North station at 8.21pm.

==================

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz

reports on social media of full train loads coming from and back to sunshine coast for supanova.....

ozbob

Quote from: techblitz on November 11, 2017, 19:22:41 PM
reports on social media of full train loads coming from and back to sunshine coast for supanova.....

Thanks TB.  A bridge too far to think QR/TransLink would do some loading projections hey?
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156666

1.38pm Nambour to Albion train delayed 25mins

The 1.38pm Nambour to Albion train is delayed 25 minutes due to a earlier medical emergency.

This train is now due to arrive at Albion station at 3.47pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156671

3.44pm Albion to Caboolture train now departs from Northgate station at 3.53pm

The 3.44pm Albion to Caboolture train will now depart from Northgate station at 3.53pm due to a earlier police incident.

Customers can catch a rail replacement bus to Northgate station to catch service.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156686

3.08pm Nambour-Albion train cancelled

The 3.08pm Nambour to Albion train has been cancelled at Caboolture station due to an operational issue.

The next Caboolture to Albion train will depart Caboolture station at 4.35pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156691

4.44pm Albion to Caboolture train delayed 20mins

The 4.44pm Albion to Caboolture train is delayed 20 minutes due to a police incident at Northgate station.

This train is now due to arrive at Petrie station at 5.29pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156696

5.10pm Bowen Hills to Gympie North train delayed 12mins

The 5.10pm Bowen Hills to Gympie North train is delayed 12 minutes due to a operational issue.

This train is now due to arrive at Northgate station at 5.28pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156721

3.58am Bowen Hills - Beenleigh train delayed 15mins

The 3.58am Bowen Hills to Beenleigh train is delayed 15 minutes due to an operational issue.

This train is now due to arrive at Beenleigh station at 5.26am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156786

1.04pm Airport-Eagle Junction train cancelled

The 1.04pm Airport to Eagle Junction train has been cancelled due to a track fault.

The next Domestic Airport to Varsity Lakes train will depart Domestic Airport Station at 1.19pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156816

4.15pm Roma Street - Kippa-Ring train cancelled

The 4.15pm Roma Street to Kippa-Ring train has been cancelled due to a mechanical issue.

The next Roma Street to Kippa-Ring train will depart Roma Street at 4.27pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156821

4.58pm Roma Street - Ipswich train cancelled

The 4.58pm Roma Street to Ipswich train has been cancelled due to an operational issue.

The next Roma Street to Ipswich train will depart Roma Street at 5.06pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156821

5.04pm Central - Ipswich train cancelled

The 5.04pm Roma Street to Ipswich train has been cancelled due to an operational issue.

The next Central to Ipswich train will depart Roma Street at 5.28pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156826

5.10pm Coopers Plains - Central train cancelled Coopers Plains - Yeerongpilly

The 5.10pm Coopers Plains to Central train has been cancelled from Coopers Plains to Yeerongpilly due to a mechanical issue.

The next Coopers Plains to Central train will depart Coopers plains at 5.25pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156876

Trains Suspended: Ipswich & Springfield lines

Ipswich & Springfield line trains are suspended in both directions between Milton and Roma Street stations due to a bridge strike at Milton.

Customers can expect delays of up to 30 minutes.

Bridge inspectors are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156881

7.39am Ipswich-Central train cancelled

The 7.39am Ipswich to Central train has been cancelled due to a mechanical issue.

The next Ipswich to Central train will depart Ipswich at 7.52am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156891

7.21am Springfield Central-Central cancelled

The 7.21am Springfield Central to Central train has been cancelled following an earlier bridge strike.

The next Springfield Central to Central train will departed Springfield Central at 7.27am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

BrizCommuter

"Train congestion" through the CBD at 3:30pm. Held outsidd South Brisbane (inbound for 5mins and counting). So much for getting out of work early!

ozbob

https://translink.com.au/service-updates/156951

2.22pm Central - Kippa-Ring train has been cancelled

The 2.22pm Central to Kippa-Ring train has been cancelled at Geebung due to a medical emergency.

The next Central to Kippa-Ring train will depart Central Station at 2.43pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: BrizCommuter on November 14, 2017, 15:37:20 PM
"Train congestion" through the CBD at 3:30pm. Held outsidd South Brisbane (inbound for 5mins and counting). So much for getting out of work early!

A second core rail route such as Cross River Rail would be handy hey?  Oh ... wait .....
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/156991

4.42pm Roma Street to Caboolture train has been cancelled

The 4.42pm Roma Street to Caboolture train has been cancelled due to an operational issue.

The next Roma Street to Caboolture train will depart Roma Street Station at 4.48pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/157036

3.58am Bowen Hills - Beenleigh train delayed 10mins

The 3.58am Bowen Hills to Beenleigh train is delayed 10 minutes due to an operational issue.

This train is now due to arrive at Beenleigh station at 5.21am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳