• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

https://translink.com.au/service-updates/141516

6.43am Manly-Central train cancelled between Manly-Lindum

The 6.43am Manly to Central train has been cancelled between Manly and Lindum stations due to an operational issue.

The next Manly to Central train will depart Manly at 6.58am.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141521

5.56am Gympie North-Central train delayed 13 mins

The 5.56am Gympie North to Central train is delayed 13 minutes due to a mechanical issue.

This train is now due to arrive at Central station at 8.59am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141596

9.37am Central-Caboolture train delayed 15 mins

The 9.37am Central to Caboolture train is delayed 15 minutes due to a mechanical fault.

This train is now due to arrive at Caboolture station at 10.11am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141621

Sunshine Coast line trains delayed 10 mins

Caboolture and Sunshine Coast line trains are delayed up to 10 minuntes in both directions between Narangba and Burperngary stations due to a mechanical issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141701

5.23pm Roma Street-Nambour train delayed 20 mins

The 5.23pm Roma Street to Nambour train is delayed 20 minutes due to a mechanical issue.

This train is now due to arrive at Nambour station at 7.36pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141741

4.58am Central to Varsity Lakes train is delayed 11 minutes

The 4.58am Central to Varsity Lakes train is delayed 11 minutes due to a signal fault.

This train is now due to arrive at Varsity Lakes station at 6.33am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141746

6.32am Varsity Lakes-Central train cancelled between Varsity Lakes-Beenleigh

The 6.32am Varsity Lakes to Central train has been cancelled between Varsity Lakes and Beenleigh due to a signal fault.

The next Varsity Lakes to Central train will depart Varsity Lakes at 6.40am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141776

7.30am Rosewood-Central train cancelled between Rosewood-Ipswich

The 7.30am Rosewood to Central train has been cancelled between Rosewood and Ipswich station due to a mechanical issue.

This train will now depart from Ipswich station at 7.52am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

This constant procession of ' mechanical issues ' is a very major concern now.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

HappyTrainGuy

Remember some units were to be canabilised for parts by now.

ozbob

It might be time to consider if some extra rolling stock (passenger carriages) can be obtained from some other 3'6" railway (Perth?  NZ?) to make up some train consists to supplement the services.  I think there are probably enough DELs in QLD.  These could be used as express Gold Coast supplemental services etc.

I volunteer the Ippy line for the only SX set we have left ..   :P

I recall Perth borrowed SX sets from Queensland for the America's Cup. The carriages remained in Perth for 4 years in service before being returned to Queensland.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

For interest.  This was fantastic.  This train moved a lot of the animals from the old RSPCA facility at Fairfield to new facilities at Wacol.



R Dow 11th December 2011

Heritage Diesel Electric Locomotive 1620 Queensland Rail delivers the RSPCA special train that was used to move animals from Fairfield to Wacol, their new home.


From > http://railbotforum.org/mbs/index.php?topic=7215.msg78854#msg78854

Another better quality vid:

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

https://translink.com.au/service-updates/141881

5.09am Springfield Central - Central train cancelled from Springfield Central - Darra

The 5.09am Springfield Central to Central train has been cancelled from Springfield Central to Darra due to an operational issue.

The next Springfield Central to Central train will depart Springfield Central at 5.39am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141891

Airport line trains delayed up to 15 mins

Airport line trains are delayed up to 15mins in both direction between Eagle Junction and Domestic Airport stations due to a track fault at between Eagle Junction and International Airport stations.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141896

7.10am Varsity Lakes-Central train cancelled between Varsity Lakes-Coomera

The 7.10am Varsity Lakes to Central train has been cancelled between Varsity Lakes and Coomera stations due to an operational issue.

The next Varsity Lakes to Central train will depart Varsity Lakes at 7.25am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141916

6.29am Central-Varsity Lakes train delayed 14 mins

The 6.29am Central to Varsity Lakes train is delayed 14 minutes due to an earlier signal fault.

This train is now due to arrive at Varsity Lakes station at 7.06am
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141886

5.29am Central-Varsity Lakes train cancelled from Altandi to Varsity Lakes

The 5.29am Central to Varsity Lakes train has been cancelled from Altandi to Varsity Lakes due to an operational issue.

Customers can transfer on to the Altandi to Varsity Lakes train departing Altandi at 6.27am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/141906

6.04am Domestic airport-Central train delayed 14 mins

The 6.04am Domestic airport to Central train is delayed 14 minutes due to a signal fault.

This train is now due to arrive at Central station at 6.43am
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142091

5.37pm Ipswich-Central train is delayed 15 mins, running express Darra-Roma Street

The 5.37pm Ipswich to Central train is delayed by up to 15 minutes due to an operational issue. As a result, this train will run express between Darra and Roma Street stations.

The next Ipswich to Central train is due to depart Ipswich station at 6.07pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142196

7.55am Ferny Grove-Central train running express Newmarket -Bowen Hills

The 7.55am Ferny Grove Station to Central Station train will run express from Newmarket Station to Bowen Hills  Station due to an operational issue.

The next Ferny Grove Station to Central Station train departed Ferny Grove Station at 8.02am

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142216

9.09am Cleveland-Central train will terminate at Manly

The 9.09am Cleveland to Central train will terminate at Manly station due to a mechanical issue.

The next Manly to Central train will depart Manly at 9.58am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142226

10.07am Central-Nambour train delayed 15 mins

The 10.07am Central to Nambour train is delayed 15 minutes due to a passenger incident.

This train is now due to arrive at Nambour station at 12.11pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142226

10.07am Central-Nambour train delayed 40 mins

The 10.07am Central to Nambour train is delayed 40 minutes due to a passenger incident.

This train is now due to arrive at Nambour station at 12.41pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142246

12.08pm Nambour- Central train delayed 40 mins

The 12.08pm Nambour to Central train is delayed 40 minutes following an earlier passenger incident.

This train is now due to arrive at Central station at 2.38pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142326

4.54 Roma Street - Shorncliffe train cancelled

The 4.54pm Roma Street to Shorncliffe train has been cancelled due to a mechanical issue.

The next Roma Street to Shorncliffe train will depart Roma Street at 5.09pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142456

11.37am Central-Nambour train delayed 14 mins

The 11.37am Central to Nambour train is delayed up to 14 minutes due to an operational issue.

This train is now due to arrive at Nambour station at 1.40pm
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

HappyTrainGuy

#7396
Quote from: ozbob on August 12, 2017, 13:49:03 PM
^

https://twitter.com/Robert_Dow/status/896216789637398530

Theres been lots of delays today that haven't been reported by Translink. As I write this the current 4.35-Caboolture-Ipswich service is still running 12 minutes late after arriving late at Caboolture. A couple other Caboolture/Kippa Ring services have been running late today aswell. Apparently the Cairns bound tilt was hunting it down very quickly towards Caboolture.

Anyway that train departed Ipswich late due to the previous Ipswich bound service being very late. Also heard that there was a possible issue with securing the drivers cab door on the IMU for the trip back.

edit: The 6.30 Ipswich-Caboolture service left Ipswich 6 minutes late due to the late running of the 4.35 Caboolture-Ipswich service (also an IMU).

ozbob

Thanks HTG.

A simple statement is all that is needed hey?

As this thread well demonstrates.  When pushed the answers are there, albeit a little surprising some times.

Operational issue = crewing issue, late train, freight train fu%ked,  EMU fu%ked again, etc. etc.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/142491

7.07pm Central-Nambour train delayed 20 mins

The 7.07pm Central to Nambour train is delayed 20 minutes due to an earlier track fault.

This train is now due to arrive at Nambour station at 9.16pm.

An additional service will depart from Caboolture to Nambour on time at 7.57pm.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳