• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/135986

10 min delays: Ipswich line trains outbound

Ipswich line trains travelling outbound will experience delays of 10 minutes due to a track fault at Gailes.

==============

This is a new one ..   :P 
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

achiruel

Quote from: ozbob on July 05, 2017, 16:56:40 PM
https://twitter.com/QueenslandRail/status/882491027373924352

What, there's no room in the timetable for customers to board/alight the train? Pull the other one! I think we all know there's plenty of fat.

ozbob

https://translink.com.au/service-updates/136076

Track Work: Delays 12 mins, CBD

All train lines are delayed up to 12 minutes both directions between Roma  Street and Bowen Hills stations due to scheduled track maintenance.

Affected services

Trains

    Airport Line
    Beenleigh Line
    Caboolture Line
    Cleveland Line
    Doomben Line
    Ferny Grove Line
    Gold Coast Line
    Ipswich/Rosewood Line
    Redcliffe Peninsula Line
    Shorncliffe Line
    Springfield Line
    Sunshine Coast Line

===================

:fp:  no regard for the inevitable flow on to broken connections .. 

And Queensland Rail wonders why people are getting really p%ssed  off with them ..   :frs:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

SurfRail

They tried to convince me this was essential work despite the fact it doesn't happen in Perth, Sydney or Melbourne where there is zero operational redundancy of the kind we have with 2 separate track pairs accessible by every train coming to or going from anywhere else.  How do the other systems manage to conduct inner city maintenance?  Sydney can't just shut down the City Circle during the day.
Ride the G:

achiruel

I'm sure it is essential work, but why can't it be done overnight when no trains are running?


ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136341

4.30pm Nambour-Central train delayed 15 mins

The 4.30pm Nambour to Central train is delayed by up to 15 minutes due to an earlier track fault.

This train is now due to arrive at Central station at 6.43pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136336

4.07pm Ipswich-Central train cancelled Indooroopilly-Milton

The 4.07pm Ipswich to Central train has been cancelled between Indooroopilly and Milton stations due to a track fault at Graceville.

The next Darra to Central train will depart Indooroopilly station at 5.06pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136406

8.13am Central-Shorncliffe train delayed 9 mins

The 8.13am Central to Shorncliffe train is delayed 9 minutes due to a points fault.

This train is now due to arrive at Shorncliffe station at 8.59am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136411

8.29am Central-Varsity Lakes train delayed 10 mins

The 8.29am Central to Varsity Lakes train is delayed up to 10 minutes due to a points fault.

This train is now due to arrive at Varsity Lakes station at 10.02am.

==================

Tough luck about the fault, but at least that is very good service disruption reporting - ' points fault ' < excellent, accurate descriptor.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136416

8.34am Central-Beenleigh train delayed 10 mins

The 8.34am Central to Beenleigh train is delayed 10 minutes due to a points fault.

This train is now due to arrive at Beenleigh station at 9.51am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136421

8.31am Central-Ipswich train is delayed 10 mins

The 8.31am Central to Ipswich train is delayed up to 10 minutes due to a points fault.

This train is now due to arrive at Ipswich station at 9.38am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136426

7.07am Central-Nambour train delayed 20 mins

The 7.07am Central to Nambour train is delayed 20 minutes due to a medical emergency.

This train is now due to arrive at Nambour station at 9.16am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136446

9.08am Nambour-Central train delayed 15 mins

The 9.08am Nambour to Central train is delayed 15 minutes due to an earlier medical emergency.

This train is now due to arrive at Central station at 11.16am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136456

Caboolture and Sunshine Coast line trains suspended

Caboolture and Sunshine Coast line trains are suspended in both directions between Caboolture and Petrie stations due to a bridge strike at Morayfield. Customers can expect delays of up to 30 minutes.

Bridge inspectors are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on July 08, 2017, 11:17:30 AM
https://translink.com.au/service-updates/136456

Caboolture and Sunshine Coast line trains suspended

Caboolture and Sunshine Coast line trains are suspended in both directions between Caboolture and Petrie stations due to a bridge strike at Morayfield. Customers can expect delays of up to 30 minutes.

Bridge inspectors are en route.

^ resumed
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136471

Trains suspended: Ipswich line, both directions

At the request of police Ipswich line trains are suspended in both directions between Redbank and Ipswich stations. Customers can expect delays of 60 minutes.

Alternative transport is being arranged to transport customers.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

Trains resumed: Ipswich line, both directions

10:31 PM - 8 Jul 2017

Late running due to the incident ..

11.37pm Caboolture to Central train delayed 12 minutes

12.05am Caboolture to Central train delayed 15 minutes

10.37pm Ipswich to Central train delayed 20 minutes

11.07pm Central to Caboolture train delayed 25 minutes

10.07pm Ipswich to Central train delayed 25 minutes
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136521

Bus replacing train: Gympie North to Yandina

The 5.45am Gympie North to Central train has been cancelled from Gympie North to Yandina due to an operational issue.

A replacement bus will arrive at Gympie North at 6.45am.

The replacement bus will pick up and set down as required between Gympie North and Yandina, and will set down as required beyond Yandina.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136621

10.07am Central-Nambour train is delayed 10 mins

The 10.07am Central to Nambour train is delayed 10 minutes due to track maintnance.

This train is now due to arrive at Nambour station at 12.06am.

================

I suggested to TransLink that they probably mean 12.06 PM ....
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136636

11.28am Central-Ipswich train running express Roma Street-Darra

The 11.28am Central to Ipswich train will run express from Roma Street to Darra due to an earlier mechanical issue.

Customer wishing to disembark between Roma Street and Darra stations will need to catch the 11.43am Central to Springfield Central train.

The next Central to Ipswich train will depart Central at 11.58am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/136651

12.52pm Central-Kippa-Ring train delayed 12 min

The 12.52pm Central to Kippa-Ring train is delayed 12 minutes due to track work. This train is now due to arrive at Kippa-Ring station at 1.57pm.

====================

The 12.07pm Central to Caboolture train is delayed 11 minutes.

(probably the same reason)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz

still delays....the 1.52 ferny grove didn't leave roma st till 2pm....these are time gaps just enough to wreck a 362,398,397 or 367 rail-bus connection.
As for that Caboolture service.....it would have needed to make up 5 of those 11 mins or else the 640 bus driver would have had to leave 5 mins late.

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

Another odd sort of day with all sorts of issues leading to delays etc.

Idiots racing boom gates no doubt.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

https://translink.com.au/service-updates/136746

15 min delays: Sunshine Coast line trains

Sunshine Coast line trains travelling in both directions between Caboolture and Elimbah are delayed 15 minutes due to a track fault.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/137156

20 minute delays: Cleveland line

Cleveland line trains are delayed up to 20 minutes in both directions between Cleveland and Birkdale stations due to a track fault at Wellington Point.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/137161

6.13am Central-Springfield Central train cancelled

The 6.13am Central to Springfield Central train has been cancelled due to an operational issue.

The next Central to Springfield Central train will depart Central at 6.43am.

=====================

https://twitter.com/Robert_Dow/status/885232897564618752


https://twitter.com/QueenslandRail/status/885234838801928194


https://twitter.com/Robert_Dow/status/885235014857703424



Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/137166

7.03am Springfield Central-Central train cancelled

The 7.03am Springfield Central to Central train has been cancelled due to an operational issue.

The next Springfield Central to Central train will depart Springfield Central at 7.09am.

==============

https://twitter.com/Robert_Dow/status/885234070715744256

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/137196

9.07am Ipswich-Central train cancelled

The 9.07am Ipswich to Central train has been cancelled between Ipswich and Redbank stations due to an earlier signal fault.

The next Ipswich to Central train will depart Ipswich at 9.37am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳