• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132461

5.05pm Rosewood-Ipswich train cancelled, operational issue

The 5.05pm Rosewood to Ipswich train has been cancelled due to an earlier operational issue. The next Rosewood to Ipswich train departs Rosewood station at 6.05pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

12th June 2017

Queensland Rail cancellations stabilising - a comment

Good Morning,

So the number of cancellations of services at Queensland Rail is stabilising.
[ Queensland Rail data shows cancellations of services stabilising --> http://www.brisbanetimes.com.au/queensland/queensland-rail-data-shows-cancellations-of-services-stabilising-20170611-gwoz67.html ].

This is a good thing of course but we need not to get too excited now. An example late yesterday afternoon the 5.05pm Rosewood-Ipswich train cancelled,  ' operational issue ' < what ever that means [ https://railbotforum.org/mbs/index.php?topic=1862.msg193758#msg193758 ]. Two hours between services, long wait for some passengers.  This is the impact of rail fail!

On Time Running (OTR) is  now consistently poor [ https://railbotforum.org/mbs/index.php?board=73.0 and Queensland Rail on-time running worse in 2017 than in 2016 --> http://www.brisbanetimes.com.au/queensland/queensland-rail-ontime-running-worse-in-2017-than-in-2016-20170524-gwcfbk.html ], and don't forget each line has reduced services compared to the October 2016 timetable, and on Fridays there are even less services! One would hope a rail operator could manage to turn out most services on reduced service timetables.

This rail fail has been a disaster for public transport in SEQ.  Surely Queensland Rail can now drop the Friday timetable and run a standard Monday to Friday timetable?  We have been putting up with reduced unreliable services for months now.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track https://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132596

8.29am Central-Varsity Lakes train delayed 10mins, mechanical issue

The 8.29am Central to Varsity Lakes train has been delayed up to 10 minutes due to an earlier mechanical issue. This train is now due to arrive at Varsity Lakes station at 10.02am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132626

10.22am Central-Kippa-Ring train delayed 10 mins

The 10.22am Central to Kippa-Ring train is delayed 10 minutes due to an operational issue.

This train is now due to arrive at Kippa-Ring station at 11.25am.

=================

https://translink.com.au/service-updates/132631

10.37am Central-Caboolture train delayed 10 mins

The 10.37am Central to Caboolture train is delayed 10 minutes due to an operational issue.

This train is now due to arrive at Caboolture station at 11.36am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132636

11.16am Roma Street-Doomben train cancelled

The 11.16am Roma Street to Doomben train has been cancelled due to a mechanical issue.

The next Roma Street to Doomben train will depart Roma Street at 11.46am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132641

11.58am Doomben-Bowen Hills train cancelled

The 11.58am Doomben to Bowen Hills train has been cancelled due to a mechanical issue.

The next Doomben to Bowen Hills train will depart Doomben at 12.28am.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132646

11.22am Central-Kippa-Ring train delayed 15 mins

The 11.22am Central to Kippa-Ring train is delayed 15 minutes due to a mechanical issue.

This train is now due to arrive at Kippa-Ring station at 12.30pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

BrizCommuter

FG trains currently up to 10 mins late. Not reported.

ozbob

https://translink.com.au/service-updates/132691

10 minute delays: Yeerongpilly station

Beenleigh and Gold Coast line trains are delayed by up to 10 minutes in both directions due to an operational issue at Yeerongpilly station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132706

4.01pm Central-Springfield Central train cancelled Auchenflower-Springfield Central

The 4.01pm Central to Springfield Central train has been cancelled between Auchenflower and Springfield Central stations due to a mechanical issue.

The next Central to Springfield Central train will departed Auchenflower station at 4.20pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132701

4.40pm Varsity Lakes-Central train cancelled Varsity Lakes-Robina

The 4.40pm Varsity Lakes to Central train has been cancelled between Varsity Lakes and Robina stations due to an earlier operational issue.

The next Varsity Lakes to Central train will depart Varsity Lakes station at 5.10pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky



ozbob

https://translink.com.au/service-updates/132836

Rosewood line trains delayed 15 mins both directions

Rosewood line trains are delayed up to 15 minutes both directions between Walloon and Wulkuraka stations due to a track fault at Karribin.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/132851

9.08am Nambour-Central train delayed 10mins, operational issue

The 9.08am Nambour to Central train has been delayed up to 10 minutes due to an operational issue. This train is now due at Central station at 11.08am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

https://translink.com.au/service-updates/133016

5.01am Nambour-Roma Street train delayed 10 mins

The 5.01am Nambour to Roma Street train is delayed 10 minutes due to a mechanical issue.

This train is now due to arrive at Roma Street station at 6.58am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/133336

1.24pm Gympie North-Roma Street train delayed 10 min

The 1.24pm Gympie North to Roma Street train is delayed 10 minutes due to an earlier mechanical issue. This train is now due to arrive at Roma Street at 4.31pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/133351

2.53pm Central-Doomben train cancelled: Clayfield-Doomben

The 2.53pm Central to Doomben train is cancelled from Clayfield to Doomben due to a track fault. The next Central to Doomben train will depart Clayfield at 3.40pm.

=======================

https://translink.com.au/service-updates/133356

2.58pm Doomben-Central train cancelled: Doomben-Clayfield

The 2.58pm Doomben to Central train is cancelled from Doomben to Clayfield due to a track fault. The next Doomben to Central train will depart Central at 3.28pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/133391

5.22am Central-Kippa-Ring train delayed 10mins, signal fault

5.22am Central to Kippa-Ring train has been delayed up to 10 minutes due to an earlier signal fault. This train is now due to arrive at Kippa-Ring station at 6.25am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

1.37pm Ipswich-Central train delayed 20min, mechanical issue

The 1.37pm Ipswich to Central train has been delayed up to 20 minutes due to a mechanical issue. This train is now due to arrive at Central station at 2.57pm.

https://twitter.com/TransLinkSEQ/status/875562302405308416
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/133496

4.39pm Park Road-Doomben train cancelled: Park Road-Roma Street

The 4.39pm Park Road to Doomben train is cancelled from Park Road to Roma Street due to an operational issue. The next Park Road to Doomben train will depart Park Road at 5.39pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/133546

Beenleigh and Gold Coast line trains suspended both directions

Beenleigh and Gold Coast line trains are suspended both directions between Sunnybank and Kingston stations due to a track fault at Altandi. Customers can expect delays of up to 60 minutes.

Alternative transport is being arranged to transport customers between these stations.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/133556

9.35am Caboolture-Central train cancelled Caboolture-Bowen Hills, operational issue

The 9.35am Caboolture to Central train has been cancelled between Caboolture and Bowen Hills stations due to an operational issue. The next Nambour to Central train departs Caboolture station at 10.05am.

^

https://twitter.com/Robert_Dow/status/875838363739103232
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳