• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

https://translink.com.au/service-updates/125416

Services resumed: Karrabin

Ipswich and Rosewood line trains in both directions have resumed regular schedule between Rosewood and Ipswich stations following an earlier boom gate strike at Karrabin station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125511

6.46am Kippa-Ring-Central train cancelled Carseldine-Bowen Hills

The 6.46am Kippa-Ring to Central train has been cancelled from Carseldine to Bowen Hills due to a mechanical issue.

The next Kippa-Ring to Central train will depart Carseldine at 7.46am.

=====================

>:(

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125521

5.51am Gympie North-Roma Street train delayed 15 mins

The 5.51am Gympie North to Roma Street train is delayed 15 minutes due to a mechanical issue.

This train is now due to arrive at Roma Street station at 8.54am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125526

8.40am Varsity Lakes-Roma Street train delayed 10 mins

The 8.40am Varsity Lakes to Roma Street train is delayed 10 minutes due to a mechanical issue.

This train is now due to arrive at Roma Street station at 10.07am.

===================

BINGO ! 3 in a row ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

achiruel

What happened to the service departing Carseldine at 7:16?

Also why no useful alternative travel information e.g. "customers" for the CBD could take the 340 which leaves from just outside the station?

ozbob

https://translink.com.au/service-updates/125531

8.32am Roma Street-Varsity Lakes train delayed 8 mins

The 8.32am Roma Street to Varsity Lakes train is delayed 8 minutes due to an earlier mechanical issue.

This train is now due to arrive at Varsity Lakes station at 10.00am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125561

10.03am Roma Street-Nambour train delayed 14 mins

The 10.03am Roma Street to Nambour train is delayed 14 minutes due to an earlier mechanical issue.

This train is now due to arrive at Nambour station at 12.10pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125556

10.34am Domestic Airport-Roma Street cancelled Domestic Airport-Bowen Hills

The 10.34am Domestic Airport to Roma Street train has been cancelled from Domestic Airport to Bowen Hills due to an earlier mechanical issue.

The next Domestic Airport to Roma Street train will depart Domestic Airport at 11.04am.

=================

Twitter

TransLink‏@TransLinkSEQ 39 minutes ago

9.57am Roma Street-Domestic Airport train cancelled http://bit.ly/2pN4pbE  #TLAlert #TLAirportline
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125536

Gold Coast line trains travelling outbound delayed 8 mins

Gold Coast line trains travelling outbound are delayed up to 8 minutes between Ormeau and Helensvale stations due to a mechanical issue at Coomera.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125566

11.02am Roma Street-Varsity Lakes train cancelled

The 11.02am Roma Street to Varsity Lakes train has been cancelled due to an earlier mechanical issue.

The next Roma Street to Varsity Lakes train will depart Roma Street at 11.32am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125571

12.40pm Varsity Lakes-Roma Street train cancelled

The 12.40pm Varsity Lakes to Roma Street train has been cancelled due to an operational issue.

The next Varsity Lakes to Roma Street train will depart Varsity Lakes at 1.10pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Reliability is going out the back door these days ...   :thsdo
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

achiruel

Aren't most Airport-Gold Coast trains IMUs? I didn't realise IMUs had such a reliability problem, I thought it was ICEs, EMUs and SMU200s that were plagued with reliability issues.

ozbob

A lot of hybrids of late running around on the Ippy eg. 160 3 car / 260 3 car. (these are for the through Nambour services)

I think these have been on the GC too as well as the older IMUs.

QR reduced services on the pretext of reliability, sadly, the system is not reliable and the effects compound because of the poor frequency.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Uh ... oh ...

=================

https://translink.com.au/service-updates/125596

8.48am Roma Street-Kippa-Ring train delayed 20 mins

The 8.48am Roma Street to Kippa-Ring train is delayed 20 minutes due to a mechanical issue.

This train is now due to arrive at Kippa-Ring station at 10.05am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

https://translink.com.au/service-updates/125596

8.48am Roma Street-Kippa-Ring train cancelled Roma Street-Petrie

The 8.48am Roma Street to Kippa-Ring train has been cancelled Roma Street to Petrie due to a mechanical issue.

The 9.03am Roma Street to Caboolture train will stop all stations to assist passengers wanting to travel to Kippa-Ring.

This train is now due to arrive at Kippa-Ring station at 10.05am.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Cazza

At least they took some initiative and made the Caboolture train stop at all stations

ozbob

https://translink.com.au/service-updates/125676

Delays 20 mins both directions due to track fault: Walloon

Rosewood line trains travelling both directions delayed up to 20 minutes due to a track fault at Walloon station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125671

Delays 20 mins both directions due to track fault: Beenleigh

Beenleigh line trains travelling in both directions have been delayed up to 20 minutes due to a track fault at Beenleigh station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125766#TLAlert

1.24pm Gympie North-Roma Street train delayed 10 mins

The 1.24pm Gympie North to Roma Street train is delayed 10 minutes due to an operational issue.

This train is now due to arrive at Roma Street station at 4.31pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125886

10 min delays: Beenleigh line outbound

Beenleigh line trains travelling outbound will experience delays of 10 minutes due to a track fault at Yeerongpilly. No delays are expected for trains travelling inbound.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/125966

10.38am Nambour - Central train delayed 50 mins, bridge strike

The 10.38am Nambour to Central train is delayed up to 50 minutes due to a bridge strike at Palmwoods station.

This train is now due to arrive at Central station at 1.18pm.

An additional service from Caboolture to Central station will depart Caboolture station at 11.35am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/126016

2.12pm Northgate - Central train cancelled Northgate - Albion, mechanical fault

The 2.12pm Northgate to Central train has been cancelled between Northgate and Albion stations due to a mechanical fault.

The next Shorncliffe to Central train will depart Northgate station at 2.27pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/126041

4.10pm Bowen Hills - Rosewood train delayed 10 mins, mechanical issue

The 4.10pm Bowen Hills to Rosewood train is delayed 10 minutes due to a mechanical issue.

This train will now run express between Roma street and Darra stations.

This train is now due to arrive at Rosewood station at 5.38pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/126151

All train lines delayed up to 5 minutes outbound, track work

All train lines are delayed up to 5 minutes outbound from Roma street - Bowen Hills due to track work in the CBD.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/126166

Trains suspended: Gold Coast line

At police request Gold Coast line trains are suspended both directions at Bethania station. Customers can expect delays of up to 20 minutes.

Police are on en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/126181

1.24pm Gympie North - Central train delayed 11 mins, mechanical issue

The 1.24pm Gympie North to Central  train is delayed up to 11 minutes due to a mechanical issue.

This train is now due to arrive at Central station at 4.30pm. :fp:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

Quote from: ozbob on April 27, 2017, 14:54:10 PM
1.24pm Gympie North - Central train delayed 11 mins, mechanical issue

The 1.24pm Gympie North to Central  train is delayed up to 11 minutes due to a mechanical issue.

This train is now due to arrive at Central station at 4.30pm. :fp:

"Due to a lack of forward planning and proper contract supervision, today's service will be late"

ozbob

https://translink.com.au/service-updates/126196

3.12pm Roma Street to Domestic Airport train cancelled

The 3.12pm Roma Street to Domestic Airport train has been cancelled due to a an operational issue.

The next Roma Street to Domestic Airport train will depart Roma Street at 3.42pm.

==================

' catch the train, miss the plane .. '   ??? :P
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/126291

Delays due to a points failure fault: Beerwah

Sunshine Coast line trains are delayed up to 15 minutes in both directions due to a points failure fault at Beerwah.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

achiruel

Quote from: ozbob on April 27, 2017, 12:11:33 PM
https://translink.com.au/service-updates/126151

All train lines delayed up to 5 minutes outbound, track work

All train lines are delayed up to 5 minutes outbound from Roma street - Bowen Hills due to track work in the CBD.

Trackwork through the CBD in the middle of the day again? Clusterf**k!

ozbob

https://translink.com.au/service-updates/126301

5.26am Nambour - Central train delayed

The 5.26am Nambour to Central train is delayed 20 minutes due to signal fault at Beerwah.

This train is now due to arrive at Roma Street Station station at 7.38am
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

Quote from: achiruel on April 28, 2017, 05:57:14 AM
Quote from: ozbob on April 27, 2017, 12:11:33 PM
https://translink.com.au/service-updates/126151

All train lines delayed up to 5 minutes outbound, track work

All train lines are delayed up to 5 minutes outbound from Roma street - Bowen Hills due to track work in the CBD.

Trackwork through the CBD in the middle of the day again? Clusterf**k!

It relates to the track and tunnels needing an inspection every 4 days or something like that, has been explained on here before.

ozbob

Twitter

TransLink‏ @TransLinkSEQ 2 hours ago

8.16am Kippa-Ring - Central train cancelled http://bit.ly/2pEgJhx  #TLAlert #TLRedcliffePeninsulaline
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

SurfRail

Quote from: red dragin on April 28, 2017, 07:15:00 AM
Quote from: achiruel on April 28, 2017, 05:57:14 AM
Quote from: ozbob on April 27, 2017, 12:11:33 PM
https://translink.com.au/service-updates/126151

All train lines delayed up to 5 minutes outbound, track work

All train lines are delayed up to 5 minutes outbound from Roma street - Bowen Hills due to track work in the CBD.

Trackwork through the CBD in the middle of the day again? Clusterf**k!

It relates to the track and tunnels needing an inspection every 4 days or something like that, has been explained on here before.

So how do other cities manage it?  The City Circle in Sydney certainly doesn't get shut down on a weekly basis, and it sees a lot more and heavier trains.

If they can't maintain their infrastructure without causing rampant delays, they are doing something wrong, but that is currently par for the course whenever QR puts their hands on anything...
Ride the G:

ozbob

^ can also stuff connections.  Still, Queensland Rail has previously indicated with the Easter rail fail timetable that the notion of an integrated network doesn't matter to them.

Righto then ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

No idea, just relying what I read.

Probably to save of overtime by not doing it at night.

🡱 🡳