Previous topic - Next topic

ozbob

I can only guess that a crew member is not available for the shift for what ever reason.

Clearly to difficult for Queensland Rail to manage a one hour shuttle service between Ipswich and Rosewood with any real degree of reliability or certainty.  They have zero resilience.  Plenty of trains in the stabling yard at Ippy.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

achiruel

Quote from: ozbob on February 18, 2017, 17:51:48 PM


Do you expect TransLink will actually know the answer?

AFAICS, they just regurgitate whatever BS QR feeds them.

Trad needs to direct QR to give proper reasons for delays, cancellations, otherwise we will just end up with the same pathetic excuses over again.

ozbob

Of course not.
The point being that steps need to be taken to ensure they do and communicate that in a clear, concise and accurate way. Not the obstufucated dribble that they excel in.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink ‏@TransLinkSEQ 8 hours ago

7.22pm Central-Kippa-Ring train is cancelled due to a mechanical issue. http://bit.ly/2kToBWm  #TLAlert #TLRedcliffePeninsulaline
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

19th February 2017

Communication 101 for TransLink & Queensland Rail

Good Morning,

Can TransLink and Queensland Rail please cooperate to get service cancellation notices improved please.
They need to be timely, accurate, concise and detail specifically the issue.

Simply stating that the cause of a cancelled service is due to an ' operational issue ' is not adequate. 
It just continues to build resentment, anger and grief.

Yesterday another good example as services between Ipswich and Rosewood were cancelled for a while. 
What was the reason?  We assume a crew issue but who would know other than Queensland Rail.

A series of notifications from TransLink as the service cancellations unfolded, some incorrect, with the cause as ' operational issue ' does not help does it?

See --> https://railbotforum.org/mbs/index.php?topic=1862.msg188232#msg188232 for a great example of mediocrity in full flight!

The public is tired of being treated in such an off hand manner.

If the public are actually informed as to cause of the failure in a timely manner they will be more accepting.

Can do please?  Thank you.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track https://backontrack.org

Quote from: ozbob on February 16, 2017, 15:52:47 PM
Sent to all outlets:

16th February 2016

Please explain?

Good Afternoon,

This is a request for TransLink and Queensland Rail to detail the actual cause of delays.  ' Operational issue ,   ' mechanical issue ' is very vague and just causes angst.

It is understood that a person struck by a train needs some care, but surely most of the other situations can be clearly spelled out?

Some suggestions:

Locomotive failure.

Train failure.

Derailment.

Sick passenger.

Sick crew.

Person struck by train.

Bridge strike.

Level crossing strike.

Signal fault.

Track fault.

Points failure.

Telemetry fault.

Rostering problem.

Trespasser in corridor.

Police incident.

Power failure.

Vegetation on line.

Vehicle on line.

Broken rail.

And so forth ...

Thanks.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track https://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116816

10.18am Beenleigh-Central train delayed 25 mins

The 10.18am Beenleigh to Central train is delayed 25 minutes due to an operational issue.

This train is now due to arrive at Yeerongpilly station at 11.29am.

========================

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116836

5.00pm Roma Street to Gympie North train delayed

The  5.00pm Roma Street to Gympie North train is delayed 18 minutes due to an operational issue.

This train is now due to arrive at Gympie North station at 8.19pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116861

Rosewood line trains suspended in both directions between Ipswich and Rosewood

Rosewood line trains are suspended in both directions between Ipswich and Rosewood stations due to an overhead power line issue at Wulkuraka. Technicians are on site.

Alternative buses are being arranged to transport customers.

Last updated:  Mon 20 February 2017 at 2.32am (16 minutes ago)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116871

Sunshine Coast line trains are delayed up to 10 minutes

Sunshine Coast line trains are delayed up to 10 minutes in both directions due to a signal fault at Palmwoods.

Technicians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116866

4.43am Park Road to Northgate train cancelled from Park Road to Roma Street

The 4.43am Park Road to Northgate train has been cancelled from Park Road to Roma Street due to an operational issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116871

Sunshine Coast line trains are delayed up to 20 minutes

Sunshine Coast line trains are delayed up to 20 minutes in both directions due to a signal fault at Palmwoods.

Technicians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116881

7.40am Ferny Grove-Park Road train cancelled

The 7.40am Ferny Grove to Park Road train has been cancelled due to a mechanical issue.

The next Ferny Grove to Park Road train will depart Ferny Grove at 7.47am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on February 20, 2017, 02:49:52 AM
https://translink.com.au/service-updates/116861

Rosewood line trains suspended in both directions between Ipswich and Rosewood

Rosewood line trains are suspended in both directions between Ipswich and Rosewood stations due to an overhead power line issue at Wulkuraka. Technicians are on site.

Alternative buses are being arranged to transport customers.

Last updated:  Mon 20 February 2017 at 2.32am (16 minutes ago)

According to QR FB was a dewirement ...  will take a while to sort ..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

BrizCommuter

Quote from: ozbob on February 20, 2017, 07:17:51 AM
Quote from: ozbob on February 20, 2017, 02:49:52 AM
https://translink.com.au/service-updates/116861

Rosewood line trains suspended in both directions between Ipswich and Rosewood

Rosewood line trains are suspended in both directions between Ipswich and Rosewood stations due to an overhead power line issue at Wulkuraka. Technicians are on site.

Alternative buses are being arranged to transport customers.

Last updated:  Mon 20 February 2017 at 2.32am (16 minutes ago)

According to QR FB was a dewirement ...  will take a while to sort ..
Was it an NGR trying to escape from its shed?

ozbob

I wonder if it was a night test NGR train?  Or possibly the last Rosewood train?

Someone might know ..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116916

Sunshine Coast line trains suspended: Caboolture-Nambour

Sunshine Coast line trains are suspended in both directions between Caboolture and Nambour stations due to a signal fault caused by an earlier lightning strike at Palmwoods. Customers can expect delays of up to 60 minutes.

Technicians are on site.

Alternative transport is being arranged to transport customers.

=======================

^ better.  Clear explanation of the problem.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

achiruel

If the fault is at Palmwoods, surely trains could still run to say Landsborough?

techblitz

https://www.facebook.com/QueenslandRail/posts/1459646464053709

resulted in a 23 min gap inbound at Oxley (7.55 - 8.19)  Cancelled service was the Nambour train.....
Very poor communication to the QR and translink social media teams as well as the stationhand!

https://www.facebook.com/QueenslandRail/posts/1459653407386348

23 minute inbound gap at Toombul (7.45 - 8.08)...following train was a 3car  :fp:

ozbob

Quote from: achiruel on February 20, 2017, 09:09:00 AM
If the fault is at Palmwoods, surely trains could still run to say Landsborough?

Good question.  I can only assume that there are issues on the entire section from Caboolture <> Nambour.

Once upon a time it would not have been an issue of course with local signal boxes/sections etc.  But with CTC I guess it is too complicated now for written authorities and the like.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: techblitz on February 20, 2017, 09:13:54 AM
https://www.facebook.com/QueenslandRail/posts/1459646464053709

resulted in a 23 min gap inbound at Oxley (7.55 - 8.19)  Cancelled service was the Nambour train.....
Very poor communication to the QR and translink social media teams as well as the stationhand!

https://www.facebook.com/QueenslandRail/posts/1459653407386348

23 minute inbound gap at Toombul (7.45 - 8.08)...following train was a 3car  :fp:

:fp: :fp:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

HappyTrainGuy

Depending on when it happened you could have a large amount of freighters stranded and where it happened the overhead wire tension combined with where the power has been isolated wouldn't make it ideal to send an electric train any further than Caboolture.

ozbob

Issue at Palmwoods resolved.  Services have resumed (residual delays).
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116916

Sunshine Coast line trains resumed: Caboolture-Nambour

Sunshine Coast line trains are resumed in both directions between Caboolture and Nambour stations. Customers can expect residual delays of up to 15 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116931

11.05am Caboolture-Central train cancelled

The 11.05am Caboolture to Central train has been cancelled due to an earlier signal fault. The next Nambour to Central train departs Caboolture station at 11.35am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/116946

1.39pm Shorncliffe-Central train cancelled Shorncliffe-Northgate

The 1.39pm Shorncliffe to Central train has been cancelled between Shorncliffe and Northgate stations due to an operational issue. The next Shorncliffe to Central train departs Shorncliffe station at 2.09pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz

^ turns a 13minute wait for people connecting off the 690 into a 43 minute wait  :thsdo

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://translink.com.au/service-updates/117221

5.04pm Central to Beenleigh train cancelled at South Brisbane

The 5.04pm Central to Beenleigh train has terminated at South Brisbane station due to a mechanical issue. The next outbound Central to Beenleigh train is due to depart Central station at 5.19pm.

=====================

https://translink.com.au/service-updates/117246

5.19pm Central to Beenleigh train delayed 10mins

The 5.19pm Central to Beenleigh train will experience delays of up to 10 minutes due to a signal fault at South Brisbane. The next Central to Beenleigh train will depart Roma Street at 5.34pm.

=====================

https://translink.com.au/service-updates/117231

5.10pm Roma St-Varsity Lakes train delayed 13mins

The 5.10pm Roma Street to Varsity Lakes train will experience delays of up to 13 minutes due to a signal fault at South Brisbane. This train is now due to arrive at Varsity Lakes station at 6.43pm.

The next Roma Street to Varsity Lakes train will depart Roma Street station at 5.17pm.

=====================

https://translink.com.au/service-updates/117236

5.17pm Roma St-Varsity Lakes train delayed 10mins

The 5.17pm Roma Street to Varsity Lakes train will experience delays of up to 10 minutes due to an signal fault at South Brisbane station. The next Roma Street to Varsity Lakes train will depart Roma Street station at 5.32pm.

=====================
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

achiruel

However, it worries me that signal faults are occurring on a section which was just closed for maintenance the previous weekend.

SurfRail

All lines delayed due to closure of one of the track pairs for planned off-peak maintenance.

Why the hell is this allowed?
Ride the G:

ozbob

https://translink.com.au/service-updates/117446

7.55am Ferny Grove-Central train cancelled: Ferny Grove-Mitchelton

The 7.55am Ferny Grove to Central train has been cancelled from Ferny Grove to Mitchelton due to a earlier mechanical fault.

The next Ferny Grove to Central train will depart Ferny Grove at 8.02am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

BrizCommuter

Quote from: ozbob on February 24, 2017, 07:37:21 AM
https://translink.com.au/service-updates/117446

7.55am Ferny Grove-Central train cancelled: Ferny Grove-Mitchelton

The 7.55am Ferny Grove to Central train has been cancelled from Ferny Grove to Mitchelton due to a earlier mechanical fault.

The next Ferny Grove to Central train will depart Ferny Grove at 8.02am.
Ouch - that will result in a full 8:02am service!

BrizCommuter

Trains currently suspended through South Bank, causing a bit of an issue for late night travellers are people existing concert as BCEC. Nothing on TransLink's website - obviously fast asleep!

ozbob

https://translink.com.au/service-updates/117556

12.58pm Doomben - Park Road train cancelled at Roma Street

The 12.58pm Doomben to Park Road train has been cancelled from Roma Street to Park Road due to an operational issue.

The next Doomben to Park Road train will depart Doomben station at 1.58pm

=======================

" ... due to an operational issue ... "



^


Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Stillwater

so, if I can't pay the mortgage, that is a 'fiscal imbalance issue'?

ozbob



Quote from: ozbob on February 19, 2017, 08:25:26 AM
Sent to all outlets:

19th February 2017

Communication 101 for TransLink & Queensland Rail

Good Morning,

Can TransLink and Queensland Rail please cooperate to get service cancellation notices improved please.
They need to be timely, accurate, concise and detail specifically the issue.

Simply stating that the cause of a cancelled service is due to an ' operational issue ' is not adequate. 
It just continues to build resentment, anger and grief.

Yesterday another good example as services between Ipswich and Rosewood were cancelled for a while. 
What was the reason?  We assume a crew issue but who would know other than Queensland Rail.

A series of notifications from TransLink as the service cancellations unfolded, some incorrect, with the cause as ' operational issue ' does not help does it?

See --> https://railbotforum.org/mbs/index.php?topic=1862.msg188232#msg188232 for a great example of mediocrity in full flight!

The public is tired of being treated in such an off hand manner.

If the public are actually informed as to cause of the failure in a timely manner they will be more accepting.

Can do please?  Thank you.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track https://backontrack.org

Quote from: ozbob on February 16, 2017, 15:52:47 PM
Sent to all outlets:

16th February 2016

Please explain?

Good Afternoon,

This is a request for TransLink and Queensland Rail to detail the actual cause of delays.  ' Operational issue ,   ' mechanical issue ' is very vague and just causes angst.

It is understood that a person struck by a train needs some care, but surely most of the other situations can be clearly spelled out?

Some suggestions:

Locomotive failure.

Train failure.

Derailment.

Sick passenger.

Sick crew.

Person struck by train.

Bridge strike.

Level crossing strike.

Signal fault.

Track fault.

Points failure.

Telemetry fault.

Rostering problem.

Trespasser in corridor.

Police incident.

Power failure.

Vegetation on line.

Vehicle on line.

Broken rail.

And so forth ...

Thanks.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track https://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳