• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

The issue above was sorted  now another ..

http://www.translink.com.au/alert.php?id=548

Caboolture, Shorncliffe and Sunshine Coast lines - effective 9 April 2010

QR has advised TransLink that train services through Northgate station are currently suspended due to a signal fault.

Technicians are currently on site to repair the problem.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

 :o :o

erail 3.45pm

10 Apr 2010

15 mins delay for services on CBD Line due to track fault. Service to resume by 5:00 PM.

For further enquiries or timetable information please contact TransLink on 13 12 30 or www.translink.com.au.

========

There was a short interruption due to a signal failure on the Gold Coast line this morning as well ..

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Due to the way train paths are set up on the network, particularly at weekends a CBD line fault is generally not good news ... (understatement)

:P
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Further it seems only involves Merivale bridge and those lines

http://www.translink.com.au/servicestatus.php

# Minor disruption - last updated Saturday 10th April 2010 3.59pm
# Passengers on city bound trains should expect delays due to a signalling fault on the Merrivale Street Bridge.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

dwb

I doubt it. Twitter is only staffed during the working week, see their bio
QuoteBio Tweeting major service disruptions, public transport news, upcoming service changes and events in SEQ. We're usually online 9-5 Mon-Fri.

ozbob

Guess that makes sense public transport is 9 to 5, Monday to Friday NOT!  Time they got involved with the real world.

:P
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Power problems affecting Beenleigh GC Airtrain

----------------

http://www.translink.com.au/linestatus.php?3

# Minor disruption - last updated Sunday 11th April 2010 6.52am
# Passengers should expect delays of up to 30 minutes due to an overhead line fault. Buses will replace trains between Kuraby and Kingston.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Power problems on Ferny Grove line now too.

SMS rapid fire on my phone ...

:-w
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Might be a misfire on the FG line, a FG service just left platform 9 Roma St

erail 7.26am

11 Apr 2010

Disruptions on Ferny Grove Line due to power fault. Expect 30 mins delay. Service to resume by 9:00 AM.


Alt. transport operating between Kingston and Kuraby.

???
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

IMU172/167 just pulled into platform 9  Roma St for Airport  ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicestatus.php

Now has delays for Beenleigh, GC, Airport and FG.  Trains now caught up with the power failures ...

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 8.55am

11 Apr 2010

Services for Ferny Grove Line have resumed as normal.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Delays due to signalling faults on the Gold Coast and Cleveland line services. Check http://www.translink.com.au for more details.
27 minutes ago via API

=========

TransLinkSEQ
 
Gold Coast and Cleveland line train services are returning to normal.
1 minute ago via API
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
30 min delays Shorncliffe, Caboolture, Sunshine Coast and Ferny Grove lines. Buses between Bowen Hills and Eagle Junction stations.

6 minutes ago  via API  

==============

http://www.translink.com.au/alert.php?id=570

Service disruption Shorncliffe, Caboolture, Sunshine Coast and Ferny Grove lines - effective 17 April 2010

QR has advised TransLink that due to a police incident passengers can expect delays of up to 30 minutes on the Shorncliffe, Caboolture, Sunshine Coast and Ferny Grove lines. Buses are being arranged to convey passengers between Bowen Hills and Eagle Junction stations.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ   TransLinkSEQ
 
Delays of up to 15 mins on Shorncliffe, Caboolture, Sunshine Coast and Ferny Grove lines. 9 minutes ago via API
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/alert.php?id=571

Service Disruption Beenleigh and Gold Coast lines - effective 19 April 2010

Services on the Beenleigh and Gold Coast line are delayed up to 30 minutes due to a truck accident at the rail bridge at Sherwood Road, Rocklea

Services are suspended at Rocklea both inbound and outbound while this area is being investigated, but are expected to resume shortly.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

From the Brisbanetimes click here!

Train chaos, lines closed

QuoteTrain chaos, lines closed
COURTNEY TRENWITH
April 19, 2010 - 6:53AM

An accident involving a truck carrying avocados is causing traffic and rail chaos for commuters between Brisbane and the Gold Coast and Beenleigh this morning.

The semi-trailer slammed into a rail bridge at Rocklea, becoming stuck, about 6am, police said.

All trains between Brisbane and the Gold Coast and Beenleigh were stopped until the area could be declared safe.

Trains resumed about 6.25am but two inbound and four outbound trains are running about half-hour late, Translink said.

Long delays have been cleared for cars around Sherwood Road and Muriel Avenue at Rocklea, police say.

However, the truck remains stuck and other trucks and large vehicles are unalble to pass.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane
 
QR: track fault @ Beaudesert Rd level crossing, Salisbury - Beenleigh line. If you're travelling outbound, expect delays of approx 30 mins.
1 minute ago via web
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane
 
QR: track fault at Salisbury has just been repaired and the boom gates are now up. All services have resumed as normal on Beenleigh line.
half a minute ago via web
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Problems with points at Mayne, delays some services.

Point problem at Redbank, some short delays Ippy

http://www.translink.com.au/linestatus.php?1

# Minor disruption - last updated Friday 23rd April 2010 6.01am

Due to a points problem at Bowen Hills, the following services are running late:

   * The 5.20am Roma Street to Airport service is 26 minutes late at Bowen Hills.
   * The 5.51am Roma Street to Airport service will depart Roma Street 15 to 20 minutes late.

==============

Twitter

612brisbane
 
QR: track fault at Redbank that is delaying inbound services on the Ipswich line by up to 10 minutes.
8 minutes ago via TweetDeck

Twitter

ABC Radio Brisbane   612brisbane
 
QR: Points problem in Mayne Yard. Several delays Airtrain, Shorncliffe, Namnbour lines.
6 minutes ago via TweetDeck


Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Train services travelling north that originate from Roma Street may experience delays up to 20 mins due to a points problem at Bowen Hills.
1 minute ago via API
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 9.56am

24 Apr 2010

Disruptions on CBD Line due to track fault. Expect 30 mins delay. Service to resume by 2:00 PM.

Alt. transport operating between Eagle Junct and Airport Dom..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicestatus.php

Service disruption: Airport line - effective 24 April 2010

QR has advised TransLink that services are suspended on the airport line due to a track fault. Alternative transport is operating between Eagle Junction and the Brisbane Airport stations.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane
 
QR: Signal fault at Nambour. Trains still moving. Expect 15 min delays.

4 minutes ago via TweetDeck
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

At Toowong, the Ipswich service scheduled 2.44 is late and running express to Corinda.  The Redbank service is behind that.  The next Ipswich service from Toowong is now 3.14pm.  First announcement.  Second announcement, Ipswich service cancelled, next Ipswich service 3.14pm.  Redbank service 2.57pm.  Life as a punter on the Ippy ...  lol

Express will pass in one minute, this might be the 'express' to Ippy ....  yes it is
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

UP on main UP  SMU 280/266  good load of pax  express ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ClintonL94

Translink service status:

"Caboolture service status

    * Minor service disruptions Minor disruption - last updated Friday 30th April 2010 11.33pm
    * Services may be delayed due to a Police incident on a train at Burpengary. Following services may be delayed as one train is halted at the station."


#Metro

Rail madness this afternoon in the peak. :o
A lot of trains were up to 10 minutes late due to a points failure at Mayne. I think it highlights the importance of redundancy in the system.
Trains on platforms got changed around or had stations dropped and were turned into expresses.

Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

20 minutes delay on the Cleveland line train  fault   (SMS erail)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail  8.55pm

10 May 2010

1 hr delay for services on Caboolture Line due to police incident. Service to resume by 10:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 5.56pm

13 May 2010

20 mins delay for services on Ipswich/Rosewood Line between Redbank and Ipswich due to track fault. Service to resume by 7:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Major problem ... football tonight at Lang Park ...

CBD train disruptions

http://www.translink.com.au/servicechange.php?1190

All trains stations in the Brisbane CBD have no services running due to an overhead power fault.

On the Ipswich line there are no services between Corinda and the City.

Patrons from the Broncos v Titans NRL game at Suncorp Stadium are advised to use alternative bus services where possible.

There are no services running on the Ferny Grove line.

There are no services running between South Brisbane and the City, and between Eagle Junction and the City.

The fault is not expected to be rectified until at least 10pm.

Services affected

Services affected

    * Sunshine Coast line
    * Shorncliffe line
    * Ipswich/Rosewood line
    * Gold Coast line
    * Ferny Grove line
    * Doomben line
    * Cleveland line
    * Caboolture line
    * Beenleigh line
    * Airport line

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

From the Courier Mail click here!

Powerline puts Friday night train services into chaos

QuotePowerline puts Friday night train services into chaos

    * Jorja Orreal
    * From: The Courier-Mail
    * May 14, 2010 10:57PM

A FALLEN powerline threw train services in Brisbane into chaos last night.

The powerline came down about 8.30pm, crippling the inner city Queensland Rail network.

Power was restored by electricians after 90 minutes, but thousands of passengers were inconvenienced; including some of the massive crowd at Suncorp Stadium where the local teams Brisbane Broncos and Gold Coast Titans had played.

QR sent additional customer service staff and transit officers to inner city stations to assist passengers in finding alternate transport arrangements.

They brought buses into service to ferry stranded passengers.

Services slowly returned to normal after power was restored.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

earil 9.57am

15 May 2010

Disruptions on Gold Coast Line due to police incident. Expect 30 mins delay. Service to resume by 12:30 PM.


Alt. transport operating between Beenleigh and Kuraby.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Derwan

Just heard. Points problem at Roma st. Trains from the north delayed.

Edit: trains queuing at Bowen Hills. No erail alert!
Website   |   Facebook   |  Twitter

ozbob

Yes, I noticed this morning when I passed through Roma St (around 6.20am) platforms 4 and 5 closed ...    :o
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/servicechange.php?1298

Train Delays - Inner City

There may be delays of up to 15 minutes when travelling inbound and outbound through the city, due to a points problem at Roma Street.
Services affected

    * Airport line
    * Beenleigh line
    * Caboolture line
    * Cleveland line
    * Doomben line
    * Ferny Grove line
    * Gold Coast line
    * Ipswich/Rosewood line
    * Shorncliffe line
    * Sunshine Coast line
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳