• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

http://translink.com.au/service-updates/84041

Trains suspended: Buranda-Coorparoo

Last updated: 8.44am Tuesday 17 May 2016

Cleveland line trains are suspended in both directions between Buranda and Coorparoo stations due to a bridge strike at Buranda. Customers can expect delays of up to 30 minutes.

Bridge inspectors are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Queensland Rail ‏@QueenslandRail 3 minutes ago

Due to a planned inner city track closure, delays of up to 15 mins through the CBD may be experienced.

We apologise for any inconvenience.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/84231

Trains suspended: Mitchelton-Gaythorne

Last updated: 6.14pm Wednesday 18 May 2016

Ferny grove line trains are suspended in both directions between Mitchelton and Gaythorne stations due to bridge strike at Pickering Street. Customers can expect delays of up to 30 minutes.

Bridge inspectors are en route
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/84266

All trains delayed: 30 minutes

Last updated: 10.23am Thursday 19 May 2016

All trains are delayed up to 30 minutes in both directions due to a points failure at Bowen Hills station.

Technicians are en route.



Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

tazzer9

I was curious to see why caboolture bound trains were heading through normanby.

ozbob

http://translink.com.au/service-updates/84541

Trains resumed: Corinda - Oxley

Last updated: 3.31pm Saturday 21 May 2016

Ipswich, Springfield and Rosewood line trains have resumed in both directions between Corinda and Oxley stations following an earlier Bridge strike at Corinda. Customers can expect residual delays of up to 30 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

aldonius

So two bridge strikes in the last week and I didn't even notice? Hoo boy.

ozbob

http://translink.com.au/service-updates/84716

Trains suspended in both directions due to a point failure at Roma Street

Last updated: 12.48pm Tuesday 24 May 2016

All trains travelling in both directions from Roma Street station are suspended due to points failure issue. Customers can expect delays of up to 45 minutes.

Technicans are en route

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/84781

Delays due to telemetry failure at Eagle Junction station

Last updated: 5.02am Wednesday 25 May 2016

Airport, Caboolture, Shorncliffe, and Sunshine Coast line trains are delayed up to 30 minutes both directions due to a telemetry failure at Eagle Junction.

Techincians are en route.

==============

^ Fascinating, for once a true description of the issue.  Most of the so called ' track and signal faults ' are in fact telemetry failures ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

tazzer9

Its just to hide some of the common faults in our system.  How does a telemetry issue occur overnight in dry whether.  At least in NSW they show the true reasons for delays but it does backfire because 95% of the time its a freight train failing.     

petey3801

Quote^ Fascinating, for once a true description of the issue.  Most of the so called ' track and signal faults ' are in fact telemetry failures

Yes and no. Technically the points/track/signal faults may have to do with telemetry, however calling it a track/signal/points fault is actually more accurate. Telemetry failures like the one reported is an all over failure of the telemetry, ie: Control can't see where trains are, can't see what state signals or points are in etc, they have absolutely no detection in the area of the telemetry failure. Whereas with track faults, it's generally something along the lines of a faulty relay, loose wire etc.etc. Control still has 'detection' as such, but isn't able to set a route due to the system thinking the section is already occupied. Signal faults can be anything from blackout signals or routes just not wanting to set up for whatever reason.

Telemetry doesn't need rain or anything like that to fail. It's basically just a big computer system and that area has 'crashed', so to speak. It is a fairly rare occurance actually, regular points/signal/track faults are much more common.
All opinions stated are my own and do not reflect those held by my employer.

ozbob

http://translink.com.au/service-updates/85136

Trains delayed: Helensvale-Varsity Lakes 30 min delays

Last updated: 12.24pm Friday 27 May 2016

Gold Coast line trains are delayed up to 30 minutes in both directions between Helensvale and Varsity Lakes stations due to an overhead power line issue between Helensvale and Robina stations.

Technicians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/85496

Sunshine Coast line suspended between Nambour & Palmwoods

Last updated: 12.18pm Tuesday 31 May 2016

Sunshine Coast line trains are suspended in both directions between Nambour and Palmwoods stations due to a bridge strike in Palmwoods.

Customers can expect delays of up to 60 minutes.

Technicians are on site.

Alternative buses are being arranged to transport customers between Nambour and Palmwoods.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

aldonius

Finally got the map updated. It wasn't loading for me for a while.

ozbob

Quote from: aldonius on May 31, 2016, 13:22:10 PM
Finally got the map updated. It wasn't loading for me for a while.

Thanks!  A telemetry error of sorts ...  :P :)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Queensland Rail ‏@QueenslandRail 1 minute ago

Rail bus services between Northgate & Gympie North for the planned track closure are temporarily suspended due to localised flooding.

==================

:bo  :bu :bo :bu :bo  :bu :bo
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/86656

Trains suspended: Roma Street-Bowen Hills

Last updated: 9.04am Friday 10 June 2016

At the request of police, all trains are suspended in both directions between Roma Street and Bowen Hills stations. Customers can expect delays of up to 15 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/87011

Beenleigh and Gold Coast line trains delayed 30 mins

Last updated: 6.22am Monday 13 June 2016

Beenleigh and Gold Coast line trains are delayed up to 30 minutes inbound following an earlier track fault at Bethania.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/87571

Stops missed: Graceville station

Last updated: 5.42pm Sunday 19 June 2016

Ipswich and Springfield line trains will not be stopping at Graceville station in both directions due to localised flooding. Customers can catch a shuttle bus services in both directions between Graceville and Sherwood stations.

Customers travelling on shuttle bus services between Graceville and Sherwood stations can expect delays of up to 30 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/87576

Trains Resumed: Albion-Roma Street

Last updated: 7.14pm Sunday 19 June 2016

All train lines have resumed service between Bowen Hills, Fortitude Valley and Central train stations due to the severe weather and flooding. Customers can expect delays of up 30 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Queensland Rail ‏@QueenslandRail 4 minutes ago

Trains suspended in both directions between Hemmant and Manly on the Cleveland line due to a report of a single vehicle accident, Lindum.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

A road vehicle has crashed into the PED gates at Kianawah Road LX.  No trains involved.

>> https://goo.gl/maps/E8PwEifVgbw
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/88556

Trains suspended: Petrie to Caboolture

Last updated: 3.38am Saturday 25 June 2016

Caboolture line trains are suspended in both directions between Petrie and Caboolture stations due to an overhead powerline fault between Dakabin and Narangba stations. Customers can expect delays of up to 60 minutes.

Technicians are on site.

Alternative transport has been arranged to transport customers.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

Twitter

TransLink ‏@TransLinkSEQ now

Caboolture line trains have resumed in both directions between Petrie and Caboolture. http://bit.ly/28Sg3gA  #TLAlert #TLCabooltureline

============

Gee, must have been a major issue, glad finally fixed!
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

aldonius

Minor- ish delays for northbound subs services.
FG train is six min late and counting; Airport train however much more.

ozbob

^ there was a ' track fault ' earlier at Holmview.  Might have slowed it up ..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

Quote from: ozbob on June 25, 2016, 13:22:53 PM
^

Twitter

TransLink ‏@TransLinkSEQ now

Caboolture line trains have resumed in both directions between Petrie and Caboolture. http://bit.ly/28Sg3gA  #TLAlert #TLCabooltureline

============

Gee, must have been a major issue, glad finally fixed!

I think it was in the form of a tree.

ozbob

http://translink.com.au/service-updates/88696

Trains suspended: Mitchelton-Ferny Grove

Last updated: 6.47am Sunday 26 June 2016

Ferny Grove line trains are suspended in both directions between Mitchelton and Ferny Grove stations due to signal fault. Customers can expect delays of up to 30 minutes.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/89421

30 mins delay: all train lines

Last updated: 12.01pm Monday 4 July 2016

All train lines are delayed for up to 30 minutes in both directions due to a mechanical issue at Roma Street station.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/89496

Caboolture & Sunshine Coast line trains suspended in both directions

Last updated: 5.12pm Monday 4 July 2016

At the request of police Caboolture and Sunshine Coast line trains are suspended in both directions between Northgate and Carseldine stations. Customers can expect delays of up to 60 minutes.

Alternative buses is being arranged to transport customers.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


HappyTrainGuy


ozbob

http://translink.com.au/service-updates/89591

Beenleigh and Gold line trains are delayed up to 25 minutes

Last updated: 5.05am Wednesday 6 July 2016

Beenleigh and Gold Coast line trains are delayed up to 25 minutes in both directions due to a earlier signal fault at Rocklea station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/89666

Ferny Grove line: Delays up to 30 mins

Last updated: 3.32pm Wednesday 6 July 2016

Due to an overhead power issue between Mitchelton and Ferny Grove stations, all Ferny Grove line train services in both directions will experience delays of up to 30 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/89966

Gold Coast line suspended: Beenleigh to Ormeau

Last updated: 2.13pm Friday 8 July 2016

Gold Coast line trains are suspended in both directions between Beenleigh and Ormeau stations due to a bridge strike at Beenleigh.

Customers can expect delays of up to 30 minutes. Technicians are en route.

Due to the bridge strike in Beenleigh, the following services have been altered.

    The 1.02pm Roma Street to Varsity Lakes train has been cancelled at Beenleigh station.

    The 1.40pm Varsity Lakes to Roma Street train has been cancelled at Ormeau station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/service-updates/90001

Beenleigh, Cleveland, and Gold Coast trains running via the Tennyson loop

Last updated: 5.31am Saturday 9 July 2016

The Beenleigh, Cleveland, and Gold Coast trains will be running via the Tennyson loop due to unplanned track work. Customers may experience delays of up to 30 minutes.

Beenleigh and Gold Coast trains will be missing the following stops:

    South Brisbane
    South Bank
    Park Road
    Dutton Park
    Fairfield
    Yeronga
    Yeerongpilly

Clevelend trains will be missing the following stops:

    South Brisbane
    South Bank
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

aldonius

Fun things to hear at Roma St: "The Gympie North train has been reinstated"

🡱 🡳