• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

Twitter

TransLinkSEQ
 
Trains halted Ipswich line due to a truck striking rail bridge at Indooroopilly.‬‪ ‬Expect delays of up to 45 mins 22 minutes ago via API

=============

TransLinkSEQ
 
Ipswich line services are returning to normal. 6 minutes ago via API

=============

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 12.13pm

27 Feb 2010

Disruptions on Gold Coast Line between Coomera and Varsity Lakes due to track fault. Expect 15 mins delay. Service to resume by 4:00 PM.


Alt. transport operating between Coomera and Varsity Lakes.

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 4.46pm

28 Feb 2010

Disruptions on Cleveland Line between Thorneside and Manly due to signalling fault. Expect 30 mins delay. Service to resume by 6:30 PM.

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

Public transport on the move!  :)

... oops signal fault, track failure, bridge strike... service canceled...

Althoug does the Brisbane System have an abnormally high rate of faults when compared to say Sydney, Melbourne or Perth?

Does anyone have information on this?
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

Melbourne is worse than Brisbane, Sydney about the same as Brisbane as far as I can tell.

The service should be able to run > 95% ontime all hours.  This must be the first target.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/alert.php?id=479

Service disruption Cleveland line - effective 28 February 2010

Services on the Cleveland line between Manly and Thornside stations have been suspended due to a signal fault. Buses will run between Manly, Lota and Thornside stations. Delays of up to 30 mins may be experienced.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 6.07pm

28 Feb 2010

30 mins delay for services on Cleveland Line between Thorneside and Manly due to signalling fault. Service to resume by 7:30 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 7.01pm

28 Feb 2010

Disruptions on Cleveland Line between Thorneside and Manly due to signalling fault. Expect 30 mins delay. Service to resume by 8:00 PM.

Alt. transport operating between Manly and Thorneside.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

It would be interesting and worthwhile to have available publicly the break up of failures on all lines around the clock.

Victoria does this, click --> here!


I find it disturbing that a lot of non peak disruptions generally go unnoticed  apart from those pax directly impacted.

Things don't seem to be getting any better do they, and problems that have existed for some time are just left to fester. For Example the Sunday afternoon train from Gympie North, overloaded and unruly behaviour.  Reports of  problems on this afternoons train. 6 car IMUs should be used or run the ICE sets as 6 car units ... More services are needed and some enforcement of railway bylaws for the comfort of all passengers.

Meanwhile ...

erail 7.37pm

28 Feb 2010

Disruptions on Cleveland Line between Thorneside and Manly due to signalling fault. Expect 30 mins delay. Service to resume by 9:00 PM.


Alt. transport operating between Manly and Thorneside.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

 ::)

erail 8.14pm

28 Feb 2010

Disruptions on Cleveland Line between Thorneside and Manly due to signalling fault. Expect 30 mins delay. Service to resume by 10:00 PM.


Alt. transport operating between Manly and Thorneside.



Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Truck stuck under the bridge Annerley Road Dutton Park but  I don't think any rail service interruptions (not notified anyway).
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Otto



erail 8.18pm

1 Mar 2010

Disruptions on Cleveland Line between Thorneside and Manly due to signalling fault. Expect 30 mins delay. Service to resume by 10:00 PM.


Virtually a repeat of yesterday , even at the same time !!  :o


7 years at Bayside Buses
33 years at Transport for Brisbane
Retired and got bored.
1 year at Town and Country Coaches and having a ball !

p858snake

I'm surprised nothings cancelled for FG, rain was over the bridge ~2pm yesterday.... and it was still raining last night (and the bridge is slightly higher than the level crossing/tracks around there)

ozbob

erial 1.01pm

3 Mar 2010

Disruptions on Cleveland Line between Manly and Thorneside due to signalling fault. Expect 30 mins delay. Service to resume by 4:00 PM.


Alt. transport operating between Manly and Thorneside.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Nightwriter

Quote from: ozbob on March 03, 2010, 13:06:23 PM
erial 1.01pm

3 Mar 2010

Disruptions on Cleveland Line between Manly and Thorneside due to signalling fault. Expect 30 mins delay. Service to resume by 4:00 PM.


Alt. transport operating between Manly and Thorneside.



Again??!!  What the hell is going on at that signal???   :-w

O_128

Quote from: Nightwriter on March 03, 2010, 13:30:23 PM
Quote from: ozbob on March 03, 2010, 13:06:23 PM
erial 1.01pm

3 Mar 2010

Disruptions on Cleveland Line between Manly and Thorneside due to signalling fault. Expect 30 mins delay. Service to resume by 4:00 PM.


Alt. transport operating between Manly and Thorneside.






Again??!!  What the hell is going on at that signal???   :-w

Was an issue with a signal at lota. My train terminated at manly. Once again the staff at manly were very helpful with constant announcements telling passengers to go to the bus stop and staff out on the platform helping people.
"Where else but Queensland?"

ozbob

erail 2.46pm

3 Mar 2010

Services for Cleveland Line have resumed as normal.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

eRail Update 4:00pm

Disruptions on Nambour Line due to power fault, expect 2 hours delay.  :-w
Service to resume by 6:00pm

Regards,
Fares_Fair
Regards,
Fares_Fair


ozbob

erail 5.13pm

3 Mar 2010

Services for Nambour Line have resumed as normal.

:lo
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 7.39pm

3 Mar 2010

30 mins delay for services on Caboolture Line due to crossing issue. Service to resume by 8:30 PM.

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 5.45am

4 Mar 2010

15 mins delay for services on Caboolture Line due to track fault. Service to resume by 7:00 AM.

==============

Twitter

612brisbane
 
There is a track fault on the bridge between Lawnton and Petrie. Caboolture line delays of up to 15 mins due to there being only one track.
2 minutes ago via TweetDeck
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

612brisbane
 
QR: Services are operating normally in both directions through the Petrie - Lawnton area at the moment.

=============

612brisbane
 
There is also another track fault at Mooloolah. This will result in delays of approx10 minutes to services to and from the Sunshine Coast.
12 minutes ago via TweetDeck
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Train services suspended at Narangba on Caboolture line due to points failure. Buses being arranged Narangba to Petrie. 30 min delays.

::)

============

http://www.translink.com.au/alert.php?id=493

Service disruption - Caboolture and Nambour lines - effective 9 March 2010

QR has advised TransLink that train services are currently suspended at Narangba on the Caboolture line due to a points failure. Buses are being arranged to transport passengers between Narangba and Petrie stations. Passengers should expect delays of 30 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Train services on the Caboolture line are returning to normal after an earlier points failure at Narangba.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 3.52pm

10 Mar 2010

30 mins delay for services on CBD Line due to police incident. Service to resume by 5:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/alert.php?id=499

Train network - effective 10 March 2010

QR has advised TransLink that all train services through Bowen Hills station are currently suspended at Bowen Hills.

This incident may cause delays to services during this afternoon's peak.

More information shortly.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Trains have resumed through Bowen Hills station. Passengers should expect delays up to 30 minutes. 2 minutes ago via API
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://www.translink.com.au/alert.php?id=499

Train network - effective 10 March 2010

QR has advised TransLink that train services through Bowen Hills station have resumed on all lines - except the Ferny Grove line - following a police incident.

Passengers should expect delays up to 30 minutes which may extend into this afternoon's peak services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

From the Courier Mail click here!

Bomb scare at Bowen Hills delays Brisbane trains

Quote
Bomb scare at Bowen Hills delays Brisbane trains

    * James O'Loan and Anthony Templeton
    * From: The Courier-Mail
    * March 10, 2010 4:23PM

A BOMB scare on a Brisbane train is causing 30 minute-delays this afternoon for thousands of commuters.

At 3.30pm, a train at Bowen Hills station was stopped when police arrived to investigate the scene.

A police spokeswoman said: "We had a bomb threat."

"We're still investigating it at this stage.

"I believe it (the alleged bomb) was on a train."

Translink said the knock-on effect would cause delays of up to 30 minutes for all trains.

Trains starting rolling through the station again at about 4pm.

"They've just started going, not long ago," a Translink spokesman said.

"Police have been on site."

It is not yet known whether police have a suspect or are questioning anyone in relation to the threat.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 4.54pm

10 Mar 2010

15 mins delay for services on CBD Line due to police incident. Service to resume by 5:30 PM.

For further enquiries or timetable information please contact TransLink on 13 12 30 or www.translink.com.au.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ
 
Buses running for inbound passengers on the Ferny Grove train line between Ferny Grove and Bowen Hills station, stopping all stations. 11 minutes ago via web
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Emmie

Eventful trip from Toowong, Shorncliffe train, leaving 3.09 this afternoon.  First we had an announcement between Milton and Roma St that the train would only be going as far as Bowen Hills 'because of a technical problem'.  

I got out at Roma St, and another train pulled in a minute or so later.  Then just past Fortitude Valley, there was another announcement that 'due to a police incident at Bowen Hills' we would have a short delay.  So we sat.  Identical messages about the 'police incident at Bowen Hills.  Queensland Rail deeply regrets... etc' every 5-7 minutes.

We finally moved at about 4pm, crawled into Bowen Hills, where there were lots of TL staff about, but I didn't see any police.  A long pause there, then finally on our way.

There wasn't really anything I could fault in QR's handling of this - the repetitive announcements about the 'police incident' were pretty irritating, but I'm sure the driver was equally in the dark, and there wasn't anything he could say about it anyway.  No problem with air conditioning, thank goodness, though I wish I'd been sitting next to someone thinner - she was probably wishing the same.

stephenk

I was delayed 18mins by the "scare" this evening. The passenger load counting people were on the 2nd Ferny Grove train after the incident, which was 18mins later than timetabled, and about 2/3rds as full as usual as the preceding train was only 7mins ahead instead of 22mins. I might contact QR, to let them know not to count that count.
Evening peak service to Enoggera* 2007 - 7tph
Evening peak service to Enoggera* 2010 - 4tph
* departures from Central between 16:30 and 17:30.

ozbob

http://www.translink.com.au/linestatus.php?1

Minor disruption - last updated Thursday 11th March 2010 11.54am  (all lines)


QR has advised TransLink that trains across the network may be delayed up to 15 minutes due to an earlier signalling fault
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

Don't know, the figures that appear in tracker doesn't really define anything.  I would like to see a detailed line break up all hours ...  bit like Melbourne
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Nightwriter

I think that off peak should count just as much as peak.

I was effected by this (was meant to catch the 12.38 train that came in at 12.52), and I needed to get home to an appointment that I was 20 minutes late for. 

Because its off peak, how often does it happen?  The only people who ever know about it are those who are inconvenienced and while we know the network can't be perfect all the time (even in an ideal world), EVERYONE should count and everyone's time is valuable.  By the time the train arrived, there were quite a lot of people waiting on the platform at Roma Street!

longboi

Quote from: Nightwriter on March 11, 2010, 15:41:58 PM
I think that off peak should count just as much as peak.

I was effected by this (was meant to catch the 12.38 train that came in at 12.52), and I needed to get home to an appointment that I was 20 minutes late for. 

Because its off peak, how often does it happen?  The only people who ever know about it are those who are inconvenienced and while we know the network can't be perfect all the time (even in an ideal world), EVERYONE should count and everyone's time is valuable.  By the time the train arrived, there were quite a lot of people waiting on the platform at Roma Street!

Late running in off peak counts just as much (if not more) than late running in peak. QR control are definately aware of all late running and prepare reports for TransLink. I have no idea what criteria TransLink use for late running in their reports, but the reason for why its running late does come into play.

ozbob

erail 10.19am

12 Mar 2010

Disruptions on Caboolture Line between Narangba and Strathpine due to signalling fault. Expect 3 hrs delay. Service to resume by 1:00 PM.


Alt. transport operating between Narangba and Strathpine.

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳