• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

darthcaligula666

according to someone i know who is on the ipswich train at the moment, it has just left darra, she said it seems to be getting through ok, no major problems. not sure if that helps you or not stb.

ozbob

https://www.facebook.com/QueenslandRail/posts/852829881402040

Queensland Rail

At approximately 2.22pm an overhead power line was reported down in the Buranda area. This issue has resulted in the overhead power being isolated and trains unable to proceed.

Linesmen are currently onsite at both locations rectifying the issues, and repair work is expected to be completed by 2am Thursday morning.

As a result, trains are now suspended between Park Road and Murrarie. To assist our customers, buses are operating between Park Road and Murrarie; and a train shuttle service is operating between Cleveland and Murrarie.

Cleveland line customers have been advised to board the Beenleigh 'all stations' train and travel from the city through to Park Road, to connect with a replacement bus service.

Customers travelling inbound for stations beyond Park Road will need to change to an 'all stations' Ferny Grove bound train at Park Road.
For our outbound commuters, trains on the Beenleigh line will run through Park Road platforms 3 and 4 and stop at all stations. Gold Coast bound passengers who board a Beenleigh service from South Brisbane, South Bank and Park Road can detrain at Moorooka and board a Gold Coast service from there.

Gold Coast - Airport trains are running express between Roma Street and Moorooka via the Tennyson loop.

As a result, customers travelling on the Cleveland line and Beenleigh lines will experience delays of an hour or more. Customers travelling on the Gold Coast – Airport line will be delayed by 15 minutes or more.

The rest of the network will experience delays of over 15 minutes as a result of the issues.

We apologise for this inconvenience and appreciate the patience of our customers as we work to rectify the issue as quickly and safely as possible.

We ask customers to check translink.com.au or call 13 12 30 anytime for the latest updates.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/22806/details

Cleveland line trains suspended - Park Road to Murarrie

Last updated: 11.59pm Wednesday 10 September 2014

Cleveland line trains are currently suspended in both directions between Park Road and Murarrie stations due to an overhead power issue at Buranda station.

Technicians will be working onsite overnight to restore services.

Passengers needing to travel to stations between Park Road and Cleveland stations should catch the Beenleigh or Park Road train from Roma Street and connect with a replacement bus service conveying passangers between Park Road and Cleveland.

Delays of up to 30 minutes are expected.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/22991/details

Trains suspended: Loganlea-Edens Landing

Last updated: 9.37am Friday 12 September 2014

At the request of police, Beenleigh and Gold Coast line trains are suspended both directions between Loganlea and Edens Landing stations due to an incident in Bethania station. Customers can expect delays of up to 30 minutes.

Police and emergency services are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

HappyTrainGuy

From what I heard an old person fell onto the tracks and needed assistance getting back up on to the platform.

ozbob

http://translink.com.au/travel-information/service-notices/23016/details

20 minute delays on Beenleigh-Gold Coast line train due to track fault

Last updated: 12.46pm Friday 12 September 2014

Beenleigh-gold Coast line trains are delayed up to 20 minutes both directions due to track fault at Sunnybank
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

BrizCommuter

#4886
Delays on Ferny Grove Line in both directions due to police incident at Mitchy. Nothing on TransLink website, TransLink's Facebook, or Queensland Rail's Facebook. Useless!

Update: Info on one train being delayed from Ferny Grove is now up...
...36mins after it departed Ferny Grove.  ::)

ozbob

uh oh ...

========================

Twitter

Chris Hull ‏@chris_hull_86

@NewsTalk4BC (Reports of) Truck stuck under Rail O/P .. Muriel Ave WB lanes at Ipswich Rd - Rocklea . .
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Hey ho ...

==================

http://translink.com.au/travel-information/service-notices/23236/details

Trains suspended: Graceville-Indooroopilly due to bridge strike

Last updated: 8.27am Tuesday 16 September 2014

Ipswich and Springfield line trains are suspended both directions between Graceville and Indooroopilly due to bridge strike at Chelmer. Customers can expect delays of up to 20 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/23316/details

Beenleigh and Gold Coast line delays due to a police incident

Last updated: 9.34am Wednesday 17 September 2014

Gold Coast and Beenleigh line trains are delayed up to 15 minutes in both directions between Beenleigh and Banoon stations due to police incident at Sunnybank station.

Police are en route.

==============

Report on 4BC ped struck at Sunnybank.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/23446/details

At the police request trains suspended

Last updated: 3.35pm Thursday 18 September 2014

At the request of police, GoldCoast and Beenleigh lines trains are suspended in both directions at Coomera station.

Customers can expect delays of up to 15 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/23701/details

Sunshine Coast line trains suspended in both directions Woombye-Landsborough

Last updated: 2.21pm Monday 22 September 2014

At the request of police, Sunshine Coast line trains are suspended in both directions between Woombye and Landsborough stations. Customers can expect delays of up to 30 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

Quote from: ozbob on September 22, 2014, 14:25:16 PM
http://translink.com.au/travel-information/service-notices/23701/details

Sunshine Coast line trains suspended in both directions Woombye-Landsborough

Last updated: 2.21pm Monday 22 September 2014

At the request of police, Sunshine Coast line trains are suspended in both directions between Woombye and Landsborough stations. Customers can expect delays of up to 30 minutes.

Whaa, at Palmwoods .. ???
Hope all went well
Regards,
Fares_Fair


ozbob

http://translink.com.au/travel-information/service-notices/23801/details

4.18am Beenleigh to Ferny Grove train delayed 20 minutes

Last updated: 4.40am Wednesday 24 September 2014

The 4.18am Beenleigh to Ferny Grove train is delayed up to 20 minutes inbound due to points failure fault at Beenleigh station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/23816/details

Delays due to an earlier points failure fault at Holmview

Last updated: 5.47am Wednesday 24 September 2014

The 4.18am Beenleigh to Roma Street train is delayed up to 20 minutes inbound due to an earlier points failure fault at Holmview station. This train is due to arrive at Roma Street station at 5.41am.

The 4.48am Beenleigh to Ferny Grove train is delayed 10 minutes due to an earlier points failure fault at Holmview station. This train is due to arrive at Ferny Grove station at 6.37am.

The 5.03am Beenleigh to Ferny Grove train is delayed 10 minutes due to an earlier points failure fault at Holmview station. This train is due to arrive at Ferny Grove station at 6.52am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Has been another ' points failure ' at Yerongpilly ...  getting to be regular ..

==============

Twitter

Robert Dow ‏@Robert_Dow 3m

@QueenslandRail Why are points failing constantly? Faulty motors or telemetry? Back to rods & signal boxes! :-) ping @scottemerson
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/23866/details

5.56am Gympie North to Roma Street train delayed

Last updated: 7.34am Thursday 25 September 2014

The 5.56am Gympie North to Roma Street train is delayed 9 minutes due to mechanical issue. This train is now due to arrive at Caboolture station at 8.02am and Roma Street station at 8.53am.

==============

ICE ?
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/23911/details

Trains suspended: Altandi-Kuraby

Last updated: 2.26pm Thursday 25 September 2014

At the request of police Beenleigh and Gold Coast line trains are suspended in both directions between Altandi and Kuraby stations. Customers can expect delays of up to 60 minutes.

Alternative transport is being arranged to transport customers between Altandi-Kuraby.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Derwan

Be patient.  Services are likely to be suspended for a while.

https://www.facebook.com/QueenslandRail/posts/859827640702264

Quote
At approximately 1:40pm, we were advised a person had been struck by a train south of Runcorn station.

Police, emergency services and Queensland Rail response units are on site.

We are working with police to investigate the incident and we are unable to speculate on the circumstances.

As a result of the incident, buses are replacing trains between Altandi and Kuraby stations. Delays of up to 60 minutes are expected.

Service updates can be found at translink.com.au or by calling TransLink on 13 12 30 anytime.

Thanks for your patience.
Website   |   Facebook   |  Twitter

ozbob

Twitter

Alex Bernhardt ‏@ABernhardt9 26s

BREAKING: Man killed after being hit by train at Runcorn. Police say he was train surfing. @9NewsBrisbane

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Queensland Rail ‏@QueenslandRail

Bus replacement services have been extended to convey customers between Banoon and Kuraby, in addition to one train shuttle service.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/24016/details

Sunshine Coast line trains are delayed up to 10 minutes

Last updated: 11.15am Friday 26 September 2014

Sunshine Coast line trains are delayed up to 10 minutes in both directions between Landsborough and Beerwah stations due to a boom gate strike at the Caloundra Street level crossing in Landsborough.

Police are en route and will be directing traffic once they arrive.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob


Gold Coast line trains are delayed up to 40 minutes.
http://translink.com.au/travel-information/service-notices/24096/details

Last updated: 2.53pm Saturday 27 September 2014

Gold Coast line trains are delayed up to 40 minutes in both directions between Coomera and Helensvale stations due to a track fault between Coomera and Helensvale.

QR technicians are on site.

============

::)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/24226/details

15 minute delays: Ipswich line

Last updated: 12.46pm Monday 29 September 2014

Ipswich line trains are delayed in both directions due to a track fault at Dinmore station. Customers can expect delays of up to 15 minutes.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/24241/details

Delays of 15 mins due to points failure

Last updated: 2.13pm Monday 29 September 2014

Ipswich/Rosewood line trains are delayed up to 15 minutes in both directions between Ipswich and Rosewood stations due to points failure near Rosewood station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/24301/details

Beenleigh line train delays due to track fault at Rocklea-Salisbury

Last updated: 8.44am Tuesday 30 September 2014

Beenleigh line trains are delayed of up to 10 minutes outbound between Rocklea and Salisbury stations due to a track fault.

Technicians are en route and due to arrive at 8.45am.

===============

I am heading down to bus 552 territory today, no doubt more missed connections ...  :mu:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz


ozbob

You got it TB ... had to laugh  watched our 552 depart as train arrived at Woodridge .. lol  .. not to worry  had a coffee ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

James

Idiot alert, idiot alert...

==============================

http://translink.com.au/travel-information/service-notices/24391/details

Ipswich, Rosewood and Springfield line trains suspended

Last updated: 4.32pm Tuesday 30 September 2014

Ipswich, Rosewood and Springfield line trains are suspended in both directions between Roma Street and Auchenflower stations due to a bridge strike at Cribb Street, Milton. Customers can expect delays of up to 30 minutes.

Engineers are en route.
Affected services
Trains

    Major status updateIpswich/Rosewood Line
    Major status updateSpringfield Line
Is it really that hard to run frequent, reliable public transport?

ozbob

^ just missed it, I was on the 4pm ex Roma St UP Ippy flyer ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/24481/details

8.44am Caboolture to Roma Street train is delayed 15 minutes

Last updated: 9.17am Thursday 2 October 2014

The 8.44am Caboolture to Roma Street train is delayed 15 minutes due to signal fault at Caboolture station. This train is now due to arrive at Roma Street station at 9.52am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

Delay alert... an over-height vehicle struck the William Berry Drive bridge just north of Morayfield.
Northbound service delayed 35 minutes
Southbound service delayed 12 minutes
Services have resumed.
Reported delays of up to 45 minutes.
Regards,
Fares_Fair


ozbob

http://translink.com.au/travel-information/service-notices/24576/details

10 minute delays due to signal fault

Last updated: 5.57am Friday 3 October 2014

Cleveland line trains are currently experiencing delays of up to 10 minutes in both directions due to a signal fault at Lindum station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/24776/details

6:15am Gympie North to Roma Street train is delayed

Last updated: 7.28am Monday 6 October 2014

The 6.15am Gympie North to Roma Street train is delayed 20 minutes due to a mechanical issue. This train is now due to arrive at Roma Street station at 9.44am.

===========

ICE?
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/24886/details

1.20pm Gympie North to Roma Street train delayed 20 minutes

Last updated: 1.43pm Tuesday 7 October 2014

The 1.20pm Gympie North to Roma Street train is delayed 20 minutes due to a track fault. This train is now due to arrive at Caboolture station at 3.52pm and at Roma Street station at 4.41pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/24911/details

2 cancelled trains due to mechanical fault

Last updated: 3.48pm Tuesday 7 October 2014

As a result of a mechanical fault, the following train services are cancelled:

The 3.24pm Caboolture to Nambour train has been cancelled.

The 4.30pm Nambour to Caboolture train has been cancelled.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Arnz

Rgds,
Arnz

Unless stated otherwise, Opinions stated in my posts are those of my own view only.

Fares_Fair

Regards,
Fares_Fair


HappyTrainGuy


ozbob

http://translink.com.au/travel-information/service-notices/25166/details

Delays of up to 30 minutes: Doomben Line

Last updated: 4.36pm Friday 10 October 2014

Doomben line trains are delayed up to 30 minutes in both directions between Doomben and Eagle Junction stations due to a signal fault at Doomben station.

Technicians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳