• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ

Trains have resumed on the Ipswich and Springfield lines - residual delays of up to 30 minutes expected.  #qr
8:11 PM - 11 Aug 2014
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

http://translink.com.au/travel-information/service-notices/20276/details

5.02am Ferny Grove to Beenleigh delayed 10 minutes

Last updated: 5.29am Wednesday 13 August 2014

The 5.02am Ferny Grove to Beenleigh train is delayed 10 minutes due to points issue fault at Bowen Hills. This train is now due to arrive at Beenleigh station at 6.51am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/20356/details

Rosewood line trains suspended in both directions between Thomas Street and Wulkuraka.

Last updated: 4.27pm Thursday 14 August 2014

Rosewood line trains are suspended in both directions between Thomas Street and Wulkuraka stations due to a police incident. Customers can expect delays of up to 15 minutes.

Police are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/20471/details

Delays: Eagle Junction station, both directions

Last updated: 3.21pm Friday 15 August 2014

Doomben and Airport line trains are delayed up to 15 minutes in both directions due to a track fault at Eagle Junction station. Technicians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/20546/details

Delays due to track fault at Bethania Station

Last updated: 7.57am Saturday 16 August 2014

Gold Coast, Airport, Beenleigh and Ferny Grove line trains are delayed up to 10 minutes inbound due to a track fault at Bethania Station.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/20691/details

Delays up to 10 minutes in both directions on Gold Coast line.

Last updated: 9.49am Monday 18 August 2014

Gold coast line trains are delayed up to 10 minutes in both directions  due to an overhead issue in between Robina and Nerang station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

 http://translink.com.au/travel-information/service-notices/20926/details

Trains suspended: Rocklea-Yeerongpilly

Last updated: 12.21pm Tuesday 19 August 2014

Beenleigh line trains are suspended in both directions between Rocklea and Yeerongpilly stations due to a bridge strike at Rocklea. Customers can expect delays of up to 30 minutes.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/21061/details

Trains supended: Redbank-Gailes

Last updated: 7.47am Wednesday 20 August 2014

Ipswich line trains are suspended in both directions between Redbank and Gailes stations due to a bridge strike at Bertha Street, Goodna. Customers can expect delays of up to 15 minutes.

Bridge inspectors are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Hey ho ...

==============

Twitter

TransLink SEQ ‏@TransLinkSEQ now

Ipswich line trains are suspended both directions between Oxley and Corinda stations due to bridge strike at Dunlop Tce, Corinda....
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/21451/details

Trains suspended: Thagoona-Rosewood, delays 60 mins

Last updated: 2.58pm Monday 25 August 2014

Rosewood line trains are suspended in both directions between Thagoona and Rosewood stations due to points failure at Thagoona station. Customers can expect delays of up to 60 minutes.

As a result of this, the following trains have been affected:

    The 2:37pm Ipswich to Rosewood train has terminated at Walloon station.
    The 3:05pm Rosewood to Ipswich train will start at Walloon station.

Technicians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Late last evening ...   ::)

================

http://translink.com.au/travel-information/service-notices/21561/details

Trains suspended on the Ipswich line between Ipswich to Darra station

Last updated: 10.55pm Tuesday 26 August 2014

Ipswich line trains have resumed both directions between Ipswich and Darra stations due to an earlier over head power issue from Ipswich to Darra station. Customers can expect residual delays of up to 20 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/21616/details

Delays due to a track fault: Rocklea to Salisbury

Last updated: 1.19pm Wednesday 27 August 2014

Beenleigh and Gold Coast line trains are delayed up to 15 minutes outbound between Rocklea and Salisbury stations due to a track fault.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/21866/details

6.47am Rosewood-Bowen Hills train delayed 30 mins

Last updated: 7.25am Friday 29 August 2014

The 6.47am Rosewood to Bowen Hills train is delayed 30 minutes due to a mechanical issue, and will now terminate at Ipswich. This train is now due to arrive at Ipswich station at 7.38am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

https://secure.servage.net/admin/?menuHeader=3&menuSub=1&page=index

Delays due to track fault: Petrie-Lawnton

Last updated: 6.15am Monday 1 September 2014

Caboolture line trains are delayed up to 20 minutes in both directions between Petrie and Lawnton due to a track fault at Lawnton station.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

32 minutes according to a friend who catches the 6.07am to roma st - left at 6.39am.

ozbob

I have found the late ' estimates ' vary widely in actuality and sometimes you win and sometimes ...   :ttp:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/22526/details

3.50pm Gympie to Brisbane City train cancelled

Last updated: 6.26pm Sunday 7 September 2014

The 3.50 Gympie North to Roma Street train has been cancelled at Landsborough station due to an operational issue.

As a result, customers should catch the 5.43pm Nambour to Roma Street train due to arrive in Roma Street station at 7.37pm.

=========

ICE?

5.43pm ex Nambour flyer might be overloaded after Landsborough ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

petey3801

QuoteLast updated: 12.53pm Wednesday 10 September 2014

Following an earlier police incident, Airport, Caboolture, Doomben, Shorncliffe and Sunshine Coast lines have resumed in both directions through Eagle Junction station. Customers can expect delays.

Airport, Caboolture, Doomben, Shorncliffe and Sunshine Coast lines have resumed in both directions through Eagle Junction station. Customers can expect delays.

Airport and Doomben line passengers can expect delays of up to 40 minutes. Alternative transport buses are currently being arranged for travel from Eagle Junction to Doomben within the next 10 minutes.

Caboolture, Shorncliffe and Sunshine Coast line passengers can expect delays of up to 15 minutes.

Refresh this page for further updates on train and bus replacement services.

Customers should use the journey planner or call 13 12 30 to seek alternative transport options.

====================================

Person stuck under train, going by the Courier Mail reports.
All opinions stated are my own and do not reflect those held by my employer.

ozbob

^ seems so ..  trains have resumed

===================

http://translink.com.au/travel-information/service-notices/22761/details

Trains resumed through Eagle Junction station - Delays expected

Last updated: 1.17pm Wednesday 10 September 2014

Following an earlier police incident, Airport, Caboolture, Doomben, Shorncliffe and Sunshine Coast lines have resumed in both directions through Eagle Junction station. Customers can expect delays.

Airport, Caboolture, Shorncliffe and Sunshine Coast lines have resumed in both directions through Eagle Junction station. Customers can expect delays.

Airport line passengers can expect delays of up to 40 minutes. Alternative transport buses have been arranged for passengers travelling between Eagle Junction to Doomben.

Caboolture, Shorncliffe and Sunshine Coast line passengers can expect delays of up to 15 minutes.

Refresh this page for further updates on train and bus replacement services.

Customers should use the journey planner or call 13 12 30 to seek alternative transport options.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ 4m

The 2.40pm Varsity Lakes to Roma Street train has been cancelled. The next Roma Street train departs at 3.10pm. Details at:...

===============

WTF?  :o
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

Twitter

Robert Dow ‏@Robert_Dow now

@TransLinkSEQ Please explain? No link ..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

 ;D

Twitter

TransLink SEQ ‏@TransLinkSEQ 7m

@Robert_Dow Hi Robert, my apologies, the link is as follows: http://bit.ly/1rVHtWo  , Thanks, Justin

======================

2.40pm Varsity Lakes to Roma Street train cancelled

Last updated: 2.05pm Wednesday 10 September 2014

The 2.40pm Varsity Lakes to Roma Street train has been cancelled due to an operational issue. The next Varsity Lakes to Roma Street train will depart Varsity Lakes at 3.10pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/22801/details

Cleveland line trains suspended due to overhead power issue

Last updated: 2.39pm Wednesday 10 September 2014

Cleveland line trains are currently suspended in both directions between Park Road and Lindum stations due to an overhead power issue at Buranda station.

Technicians are en route, and replacement bus services are being arranged.

Delays of up to 60 minutes are expected

Refresh this page for further updates on train and bus replacement services

Customer should use the journey planner or call 13 12 30 to seek alternative transport options.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

http://translink.com.au/travel-information/service-notices/22806/details

Beenleigh and Gold Coast line trains suspended due to overhead power issues

Last updated: 3.15pm Wednesday 10 September 2014

Beenleigh and Gold Coast line trains are currently suspended in both directions between South Brisbane and Yeerongpilly stations due to an overhead power issue at Dutton Park station.

Technicians are on site, and replacement bus services are en route.

Delays of up to 60 minutes are expected

Refresh this page for further updates on train and bus replacement services

Customer should use the journey planner or call 13 12 30 to seek alternative transport options.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Tommy G ‏@tommygreenard

Buses backing up over Victoria Bridge after @QueenslandRail power failure. Don't expect to be home soon @612brisbane



:o :P 8)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Tommy G ‏@tommygreenard 1m

@QueenslandRail staff say problems caused by freight train hitting power lines at Buranda @612brisbane

===================

:o
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

pandmaster

Quote from: ozbob on September 10, 2014, 15:38:38 PM
^
Not a good way to enter the PM peak ..



A little bit of coordination between BT and QR would go a long way. Buses from UQ keep offloading more and more people at Park Road with no train to get from there. I got off a 66 that I could have stayed on to Roma Street. No announcements were made by bus drivers or QR staff. The display boards said that an airport train was coming in two minutes. Eventually, a staff member walked up and told us to get the 66 to Roma Street. Simple coordination between the two would lessen the impact for commuters and make it easier for QR to get back to schedule by lightening their load.

techblitz

7 people boarding the o/b 125 @qG labratory stop (orange grove rd)..very rare...paints the picture of delayed 120's to a T..

ozbob

http://translink.com.au/travel-information/service-notices/22806/details

Delays and suspensions due to overhead power issues.

Last updated: 4.26pm Wednesday 10 September 2014

The following services are experiencing delays due to an overhead power issue at Dutton Park and Buranda stations. Customers should use the journey planner or call 13 12 30 to seek alternative transport options.

Buses

Brisbane Transport buses southbound are delayed up to 30 minutes.



Beenleigh and Gold Coast lines

Beenleigh and Gold Coast line trains are currently suspended in both directions between South Brisbane and Yeerongpilly stations due to an overhead power issue at Dutton Park station.

Passengers travelling to stations south of Yeerongpilly can travel from Roma Street to Yeerongpilly via the Tennyson line.

Passengers travelling from the Gold Coast and Beenleigh to the Airport can travel via the Tennyson line through to the Airport.

Technicians are on site, and replacement bus services are in operation

Delays of up to 60 minutes are expected to continue



Cleveland lines

Cleveland line trains are currently suspended in both directions between South Brisbane and Manly stations due to an overhead power issue at Buranda station.

Technicians are onsite, and replacement bus services are currently operating to convey passengers between South Brisbane and Manly stations.

A train shuttle service is operating for passengers travelling between Manly and Cleveland in both directions

Delays of up to 60 minutes are expected to continue.

Queensland Rail City Network

Train services on all other parts of the city network may experience a delay of up to 15 minutes. Refresh this page for further updates on train and bus replacement services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Mrs Ozbob has just travelled on the 4pm Ippy flyer from town.  Arrival at Goodna on time. 

Some UP GC trains are going outbound via Corinda and Tennyson.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/22806/details

Delays and suspensions due to overhead power issues.

Last updated: 4.55pm Wednesday 10 September 2014

The following services are experiencing delays due to an overhead power issue at Dutton Park and Buranda stations. Customers should use the journey planner or call 13 12 30 to seek alternative transport options.

Buses

Brisbane Transport buses southbound are delayed up to 30 minutes.


Beenleigh, Gold Coast and Airport lines

Beenleigh line trains have resumed between Roma Street and Moorooka stations and will be stopping at all stations. The Beenleigh line trains will be departing Roma Street station from platforms 3 & 4.

Varsity Lakes line trains will continue to travel between Roma Street station and Moorooka station via the Tennyson line.

Airport line trains will continue to travel between Roma Street station and Varsity Lakes station in both directions via the Tennyson line.

Passengers needing to travel to South Brisbane, Southbank, Park Road, Dutton Park, Fairfield, Yeronga or Yeerongpilly should catch the Beenleigh line train from Roma Street station.


Cleveland lines

Cleveland line trains are currently suspended in both directions between Park Road and Murarrie stations due to an overhead power issue at Buranda station.

Technicians are onsite.

Passengers needing to travel to South Brisbane, Southbank & Park Road stations should catch the all stations Beenleigh train from platforms 3 & 4 at Roma Street station

Passengers needing to travel to stations between Park Road and Cleveland stations should catch the all stations Beenleigh train from platforms 3 & 4 at Roma Street and connect with a replacement bus services conveying passangers between Park Road and Murarrie.

A train shuttle service is operating for passengers travelling between Murarrie and Cleveland in both directions

Delays of up to 60 minutes are expected to continue.


Queensland Rail City Network

Train services on all other parts of the city network may experience a delay of up to 15 minutes. Refresh this page for further updates on train and bus replacement services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ

Faulty boomgate at level crossing on Cavendish Rd, Coorparoo. Motorists advised to avoid area if possible, QR en route. #qr

================

:o
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Dave Andrews ‏@chopperdaveqld

Cleveland train lines suspended due to a problem at Buranda station, lotsa ppl waiting for the bus 🚌🚌🚌 #bnetraffic

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

STB

Geez, QR really can't catch a break today!  If those reports are true, how the heck did a freight train hit the overheads?  And does that mean QR will try and get repair costs back from the freight train company, I'm assuming it's either Pac Nat or Aurizon?

STB

Now there's a report on the Facebook page (Queensland Rail) of a crash on Wynnum Road, so now the rail replacement buses are stuck! :o

darthcaligula666

wow, one of the only days i am not on the train, and look what happens?! somehow i have always managed to avoid the major issues like this.

and to think i was very close this morning to heading in to roma street for my long awaited ride towards the end of the gympie north line! perhaps it was a wise decision to delay the journey yet again!

hope everyone gets home ok!

STB

Been told that there are reports of a telemetry failure on the Ipswich line (I can't see any reports of it on the TL page, but passengers are reporting that announcements of that are being made at Central), along with a boomgate failure at Coorparoo.

🡱 🡳