Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on March 17, 2014, 15:41:36 PM
http://translink.com.au/travel-information/service-notices/8751/details

Trains resumed Taringa - Chelmer

Last updated: 3.18pm Monday 17 March 2014

Ipswich, Rosewood and Springfield line trains have resumed in both directions between Taringa and Chelmer stations following a bridge strike at Allwood Street, Indooroopilly. No further delays are expected.

Allwood St Indooroopilly is one of the BIDS (Bridge Impact Detection System) sites ..  --> http://railbotforum.org/mbs/index.php?topic=5999.0
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

HappyTrainGuy

Quote from: ozbob on March 17, 2014, 15:45:18 PM
^



Not really a delay but following on with the idiots everywhere during todays arvo peak someone pushed their way through the ped gates between an out of service train returning to the city and the outbound Petrie service as to board said Petrie service that was arriving at Sunshine. A toast to the idiots!

Derwan

Power failure in the city area. No trains going anywhere!

Edit: power's back! That little droid did it!
Website   |   Facebook   |  Twitter

ozbob

http://www.tmr.qld.gov.au/Projects/Name/U/Underground-Bus-and-Train.aspx

Delays due to track fault: Kuraby to Fruitgrove

Last updated: 5.20am Wednesday 19 March 2014

Gold Coast and Beenleigh line trains are delayed up to 10 minutes inbound between Kuraby and Fruitgrove stations due to a track fault.

Gold Coast and Beenleigh line trains are suspended outbound at Fruitgrove station as a consequence of the track fault.

The 4.10am Varsity Lakes to Brisbane City train is currently running 20 minutes late.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/9046/details

Trains resumed following track fault

Last updated: 6.02pm Friday 21 March 2014

Beenleigh and Gold Coast line trains have resumed in both directions after a track fault at Bethania station. Customers can expect residual delays of up to 5 minutes. As a result the following trains have been cancelled:

Gold Coast line

    The 5.59pm Central to Varsity Lakes train. The next Central to Varsity Lakes train departs Central at 6.14pm.

Beenleigh line

    The 4.40pm Coopers Plains to Central train. The next Coopers Plains to Central train departed Coopers Plains at 4.55pm.
    The 5.25pm Coopers Plains to Central train. The next Coopers Plains to Central train departed Coopers Plains 5.40pm.
    The 6.49pm Central to Coopers Plains train. The next Central to Beenleigh train departs Central at 7.04pm.

Airport line

    The 5.27pm Roma Street to Airport train. The next Central to Airport train departs Central station at 5.57pm.
    The 5.34pm Airport to Central train. The next Airport to Central train departs the Domestic Airport station at 5.49pm.

Ferny Grove Line

    The 4.59pm Roma Street to Ferny Grove train. The next Roma Street to Ferny Grove train departed Roma Street at 5.07pm.
    The 5.11pm Central to Ferny Grove train. The next Central to Ferny Grove train departed at 5.26pm
    The 5.56pm Central to Ferny Grove train. The next Central to Ferny Grove train departs at 6.11pm.
    The 6.17pm Ferny Grove to Central train. The next Ferny Grove to Central train departs at 6.32pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

Quote from: bcasey on March 17, 2014, 08:49:14 AM
Quote from: ozbob on March 17, 2014, 08:19:23 AM
http://translink.com.au/travel-information/service-notices/8716/details

Delays at Newmarket due to boomgate strike

Last updated: 8.16am Monday 17 March 2014

Beenleigh and Ferny Grove line trains are delayed up to 10 minutes in both directions due to a boomgate strike at Wilston Road, Newmarket.

Technicians and police are en route.

My bus, 344, just got diverted around that boomgate, and is currently stuck in traffic trying to find an alternative way to Newmarket Road. I saw the trains going through at the prescribed 5km/h. Unfortunately for buses that go that way,there is no easy way to divert past it.
Agree. The new slow speed thing is a delay saver though. I was on one of those services. We stopped at a red signal between Mitchelton and Gaythorne, were notified that there was a boom gate incident, and then shortly got underway again. Presume it was a bit slower but it was only really noticeable when we actually stopped and then when we went through the boom gate.  :-t
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

James

Ho humm, it happens again...

http://translink.com.au/travel-information/service-notices/9346/details
====================================
Trains suspended Indooroopilly - Taringa

Last updated: 2.44pm Wednesday 26 March 2014

Ipswich, Rosewood and Springfield line trains are suspended in both directions between Indooroopilly and Taringa stations due to a bridge strike at Allwood Street, Indooroopilly. Customers can expect delays of up to 30 minutes.

Bridge inspectors are en route.
Is it really that hard to run frequent, reliable public transport?

ozbob

http://translink.com.au/travel-information/service-notices/9501/details

Trains suspended between Murarrie - Wynnum North

Last updated: 6.05am Friday 28 March 2014

Cleveland line trains travelling in both directions are suspended between Murarrie and Wynnum North due to a track fault between Lindum and Hemmant stations. Customers can expect delays of up to 30 minutes. Technicians are onsite.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/9571/details

Trains running at 30 minute frequency due to track fault

Last updated: 9.19am Friday 28 March 2014

Ferny Grove line trains will operate every 30 minutes between Mitchelton and Ferny Grove stations due to a track fault at Oxford Park.

Trains operating between Central and Mitchelton stations will continue to operate every 15 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/9666/details

Trains suspended: Lindum - Cannon Hill

Last updated: 6.56am Saturday 29 March 2014

Cleveland line trains are suspended in both directions between Lindum and Cannon Hill stations due to overhead power issue at Lindum station. Customers can expect delays of up to 45 minutes.

Electricians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/9731/details

12.06pm Central to Gympie North train delayed 20 mins due to severe weather

Last updated: 3.12pm Sunday 30 March 2014

The 12.06pm Central to Gympie North train is delayed 20 minutes due to severe weather at Traveston.  This train will now arrive at Gympie North station at 3.25pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Stillwater


ozbob

http://translink.com.au/travel-information/service-notices/9806/details

Trains delayed due to breakdown, two trains cancelled

Last updated: 6.16pm Monday 31 March 2014

Beenleigh, Cleveland and Gold Coast line trains are delayed up to 10 minutes due to a breakdown at South Brisbane station. As a result the following trains have also been cancelled at South Brisbane station:

    The 5.47pm Central to Cleveland train. The next Central to Cleveland train departs Central station at 6.02pm.
    The 5.49pm Central to Cleveland train. The next Central to Cleveland train departed Central station at 6.04pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/10371/details

Delays due to signal fault: Carseldine to Bray Park

Last updated: 4.37pm Sunday 6 April 2014

Caboolture and Sunshine Coast line trains are delayed up to 15 minutes in both directions between Carseldine and Bray Park stations due to a signal fault.  Technicians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/10371/details

Trains suspended: Carseldine to Bray Park

Last updated: 5.15pm Sunday 6 April 2014

Caboolture and Sunshine Coast line trains are suspended in both directions between Carseldine and Bray Park stations due to a signal fault.  Customers can expect delays of 30 minutes. Technicians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/10381/details

4.58pm Central to Ipswich train cancelled

Last updated: 5.21pm Sunday 6 April 2014

The 4.58pm Central to Ipswich train has been cancelled due to a signal fault. The next Central to Ipswich train will depart Central station at 5.28pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/10386/details

6.07pm Ipswich to Central train cancelled

Last updated: 5.26pm Sunday 6 April 2014

The 6.07pm Ipswich to Central train has been cancelled due to a signal fault. The next Ipswich to Central train will depart Ipswich station at 6.37pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

aldonius

Friend of mine is reporting that he's been stuck on a train for an hour and a half now.

ozbob

^

http://railbotforum.org/mbs/index.php?action=post;topic=1862.4560;last_msg=140781

Trains resumed: Carseldine to Bray Park

Last updated: 5.59pm Sunday 6 April 2014

Caboolture and Sunshine Coast line trains have resumed in both directions between Carseldine and Bray Park stations after an earlier signal fault. Customers can expect resuidual delays of 15 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: aldonius on April 06, 2014, 17:51:17 PM
Friend of mine is reporting that he's been stuck on a train for an hour and a half now.

It is very disappointing, I have had a little twitter rant ..   :o :P

======================

Twittter

Robert Dow ‏@Robert_Dow

. @scottemersonmp The public needs to know the full 24h OTP of rail, buses & ferries .. where is the data? http://railbotforum.org/mbs/index.php?topic=1862.msg140779#msg140779 ... #qldpol

================

Twitter

TransLink SEQ ‏@TransLinkSEQ

The 6.07pm Ipswich to Central train has been cancelled due to a signal fault http://bit.ly/1hhFzcF  #qr

^

Twitter

Robert Dow ‏@Robert_Dow

@TransLinkSEQ Mediocre train frequency is made even worse ... hopeless ... #qldpol

================

TransLink SEQ ‏@TransLinkSEQ

Sunshine Coast + Caboolture line trains suspended Bray Park - Carseldine due to signal fault. Delays 30 mins. http://bit.ly/1jjSpFP  #qr

^

Twitter

Robert Dow ‏@Robert_Dow

@TransLinkSEQ Authorities? How about turning back trains?? Farcical ..#qldpol
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/10396/details

5.07pm Central to Gympie North train delayed

Last updated: 6.21pm Sunday 6 April 2014

The 5.07pm Central to Gympie North train is delayed by one hour due to an earlier signal fault between Carseldine and Bray Park stations. This train will now arrive at Gympie North station at 9.03pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

James

Quote from: aldonius on April 06, 2014, 17:51:17 PM
Friend of mine is reporting that he's been stuck on a train for an hour and a half now.

I think people being stuck on trains without any way of getting off for an extended period of time is a total disgrace.

I was once stuck on a train for three hours without any food or water. Compensation from QR? Water bottles distributed at Nerang, then wait for it.... taken off the train at Robina. Was later found to be a body on the tracks, nevertheless, very unimpressed with how QR treated pax on the affected train.

There needs to be a procedure which allows for the evacuation of pax from trains which are stuck on the tracks. That experience very nearly turned me off rail travel permanently, and I lost a lot of faith in the rail network. I know some of the people I was on board with now avoid rail travel because of that incident.
Is it really that hard to run frequent, reliable public transport?

techblitz

2 ipswich trains came through toombul about 4 mins apart
However any ipswich bound passengers unlucky to be on the second train were told to get off at roma st and wait for the next ipswich train in 30 mins...

ozbob



Media release 7th April 2014

Queensland: Come clean with the real public transport data

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers has again called for the public disclosure of detailed public transport data.

Robert Dow, Spokesman for RAIL Back On Track said:

"Detailed public disclosure of detailed public transport data is not done in Queensland as for other states (1)."

"Yesterday afternoon (Sunday) there was yet another 'signal fault' which stopped trains on the Caboolture line and had flow on effects to the Ipswich and Sunshine Coast lines. We a have report of a commuter being stuck on a train for one and a half hours (2)."

"There are constant problems with the public transport network around the clock. The Minister for Transport claims that train reliability has improved. Unless we are given the data for the full operating period how can that be confirmed? Where is the data for the bus and ferry networks? Bus no shows are common. The network is a shambles."

"Fares are in meltdown in SEQ (3). Hiding the detailed public transport data indicates the authorities are unable to effectively manage the network in terms of performance levels. Time for some new leaders?"


References:

1. SEQ: Call for transparency and accuracy with public transport data http://railbotforum.org/mbs/index.php?topic=10357.0

2. http://railbotforum.org/mbs/index.php?topic=1862.msg140782#msg140782

3. The south-east Queensland fare fail ... http://railbotforum.org/bb/index.php

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

It is a circus ...

==================

Twitter

TransLink SEQ ‏@TransLinkSEQ 5h

9.37pm Ipswich to Roma St train cancelled due to operational issue. The next train will depart at 10.07pm
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

And ..

===========

Twitter

TransLink SEQ ‏@TransLinkSEQ

8.48pm Beenleigh to Central train cancelled. A train from Yeerongpilly to Central departs Yeerongpilly at 9.34pm
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/10436/details

5.56am Gympie North to Roma Street train delayed 30 mins

Last updated: 7.41am Monday 7 April 2014

The 5.56am Gympie North to Roma Street train is delayed up to 30 minutes due to a track fault between between Eumundi and Yandina Station. This train is now due to arrive at Caboolture station at 8.24am and is due to arrive at Roma Street Station at 9.15am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

Regards,
Fares_Fair


ozbob

http://translink.com.au/travel-information/service-notices/10681/details

Ferny Grove line trains inbound suspended, CBD trains delayed 20 mins

Last updated: 12.30pm Wednesday 9 April 2014

Ferny Grove line trains are suspended inbound between Windsor and Bowen Hills stations due to a points fault at Bowen Hills station. Customers on all CBD trains in both directions can expect delays of up to 20 minutes. Electricians are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/10681/details

Residual delays following earlier points fault

Last updated: 1.08pm Wednesday 9 April 2014

CBD trains are delayed up to 20 minutes in both directions due to an earlier points fault at Bowen Hills, with the following exception:

    The 1.01pm Cannon Hill to Central train has been cancelled from Cannon Hill to South Bank. The next Cleveland to Central train will depart Cannon Hill station at 1.16pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/10686/details

1.07pm Bowen Hills to Springfield Central train cancelled

Last updated: 1.25pm Wednesday 9 April 2014

The 1.07pm Bowen Hills to Springfield Central train has been cancelled due to a mechanical fault. The next Bowen Hills to Springfield Central train will depart Bowen Hills at 1.37pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

No wonder they don't want to come clean with the full performance profile of rail bus and ferry.

It would be a horror movie!

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Here is one with a twist ...

==============

http://translink.com.au/travel-information/service-notices/10896/details

6.57am Ipswich to Bowen Hills train will run as a six-carriage train

Last updated: 7.03am Monday 14 April 2014

The 6.57am Ipswich to Bowen Hills train will run as a six-carriage train due to operational issues.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

dancingmongoose

Quote from: ozbob on April 14, 2014, 07:07:25 AM
Here is one with a twist ...

==============

http://translink.com.au/travel-information/service-notices/10896/details

6.57am Ipswich to Bowen Hills train will run as a six-carriage train

Last updated: 7.03am Monday 14 April 2014

The 6.57am Ipswich to Bowen Hills train will run as a six-carriage train due to operational issues.

THE HORROR :yikes:

ozbob

Begs the question,  where did the extra 3 cars come from and if no other service notification of a 6 to 3 car, maybe it could be permanent?

:bg:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

petey3801

Not permanent. There were a few problems out Ipswich way this morning, including signal faults at Rosewood causing heavy delays, as well as a unit failure at Ipswich. A 6-car As Required train was sent out towards Ippy to form a service (which I assume is the one that was notified about). Morning peak still has one 6-car (and maybe a 3-car, if they're lucky) set that is used as required.
All opinions stated are my own and do not reflect those held by my employer.

ozbob

Last evening ..

Twitter

TransLink SEQ ‏@TransLinkSEQ 5h

Cleveland line trains are still experiencing delays of up to 30 mins in both directions due to a mechanical fault http://bit.ly/Qll43l  #qr