It certainly hasn't been a good week for them.  I hope they do get a clean day where there are no delays so the new timetable can really be tested.

ozbob

Hey ho ...

==================
http://translink.com.au/travel-information/service-notices/5681/details

Graceville station closed due to flooding

Last updated: 3.12pm Thursday 23 January 2014

Graceville station has been closed down due to flooding in subway. Alternative transport is being organised.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^ I reckon a drain is blocked, been a while since a decent fall ..

Graceville normally withstands a lot more rain than this ... 
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Cleared ...

================

http://translink.com.au/travel-information/service-notices/5681/details

Graceville station reopened

Last updated: 4.16pm Thursday 23 January 2014

Graceville station has reopened following flooding in the subway earlier. Trains on the Springfield, Ipswich and Rosewood lines have now returned to normal. No further delays are expected.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/5701/details

Three trains delayed due to wet weather

Last updated: 4.30pm Thursday 23 January 2014

The following services are delayed due to wet weather conditions:

    The 3.28pm Bowen Hills to Beenleigh service is delayed 10 minutes. This train is now due to arrive at Beenleigh at 4.57pm.
    The 3.43pm Bowen Hills to Beenleigh service is delayed 10 minutes. This train is now due to arrive at Beenleigh at 5.09pm.
    The 5.38pm Bowen Hills to Varsity Lakes service is delayed 10 minutes. This train is now due to arrive at Varsity Lakes at 5.20pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/5696/details

4.00pm Roma Street to Nambour train delayed

Last updated: 4.21pm Thursday 23 January 2014

The 4.00pm Roma Street to Nambour train is delayed 12 minutes due to wet weather conditions. This train is now due to arrive at Nambour station at 6.09pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Derwan

Website   |   Facebook   |  Twitter

ozbob

http://translink.com.au/travel-information/service-notices/5786/details

Trains suspended: Nambour to Yandina

Last updated: 1.03pm Friday 24 January 2014

Gympie North line trains are suspended between Nambour and Yandina stations due to a bridge strike at Price Street, Nambour. Buses have been arranged to transport customers.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Derwan

Just saw a photo of the repairs in progress.  They've actually removed a section of the bridge.  Expected completion for repairs is 6am tomorrow.
Website   |   Facebook   |  Twitter

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ

Trains btwn Nambour and Gympie Nth have resumed following yesterday's bridge strike. First service departs Gympie Nth station at 5.50am #qr

===============

:-t :-c
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Stillwater

Time for RACQ to demonstrate greater support for bridge strike infrastructure remedies -- a case of expenditure on rail having direct benefits for road users and the road transport sector.  They have supported things such as overpasses in the past, but this is a case of a ROAD over RAIL, therefore the solution is an elevated road, the province of the RACQ.  In the event of RAIL over ROAD (underpass), the government expenditure bucket is the rail budget, much smaller than the road funds bucket.  The difference should be removed.  RACQ lobbying of government would help.

ozbob

http://translink.com.au/travel-information/service-notices/5946/details

3.58pm Doomben to Bowen Hills train cancelled

Last updated: 4.07pm Wednesday 29 January 2014

The 3.58pm Doomben to Bowen Hills train has been cancelled due to an operational issue. The next Doomben to Roma Street train departs Doomben station at 4.28pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/5986/details

Trains suspended: Beenleigh-Kuraby

Last updated: 8.12am Thursday 30 January 2014

At the request of police, Beenleigh/Gold Coast line trains are suspended between Beenleigh and Kuraby stations. Customers can expect delays of up to 30 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/5986/details

Trains suspended: Beenleigh-Kuraby

Last updated: 8.51am Thursday 30 January 2014

At the request of police, Beenleigh/Gold Coast line trains are suspended in both directions between Beenleigh and Kuraby stations. Customers can expect delays of up to 60 minutes.

Replacement buses are en route to transport customers between Ormeau and Kuraby stations.

Customers may wish to check the Journey Planner for alternative transport options.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/5986/details

Trains resumed: Beenleigh-Kuraby

Last updated: 9.26am Thursday 30 January 2014

Beenleigh/Gold Coast line trains have resumed following an earlier incident requiring police attendance. Customers can expect  residual delays of up to 60 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/5986/details

Trains suspended: Bethania-Kingston

Last updated: 11.48am Thursday 30 January 2014

At police request, Beenleigh/Gold Coast line trains are suspended between Bethania and Kingston stations. Customers can expect delays of up to 60 minutes.

Replacement buses will transport customers between these stations.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ 4m

Beenleigh/Gold Coast trains have resumed in both directions. Delays up to 60 mins.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Overnight ..

===============

Twitter

TransLink SEQ ‏@TransLinkSEQ

11.37pm Central to Caboolture train delayed up to 30 mins due to Freight Train issues at Narangba station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/6356/details

Delays due to track fault Murarrie to Hemmant

Last updated: 5.51am Thursday 6 February 2014

Cleveland line trains are delayed up to 10 minutes outbound between Murarrie and Hemmant stations due to track fault.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

Twitter

Robyn Ironside ‏@ironsider

Theft of 200m of copper cable at Hemmant causing delays on the Cleveland train line this morning.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/6401/details
   
CBD trains delayed due to points fault

Last updated: 4.43pm Thursday 6 February 2014

Trains travelling in both directions through the CBD area are delayed up to 15 minutes due to a points fault at Fortitude Valley station. Technicians are en route.

Affected services

Trains

    Airport Line
    Beenleigh Line
    Caboolture Line
    Cleveland Line
    Ferny Grove Line
    Gold Coast Line
    Ipswich/Rosewood Line
    Shorncliffe Line
    Springfield Line
    Sunshine Coast Line

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

Twitter

TransLink SEQ ‏@TransLinkSEQ 2m

CBD trains have returned to schedule following a points fault at Fortitude Valley. No further delays expected.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

p858snake

Quote@TransLinkSEQ: Trains are suspended in both directions at Albion station. This is effecting multiple train lines. 60 min delays. http://t.co/9xAsu0h4rS #qr
@QPSmedia: ALBION: All trains through area are suspended due to earlier incident, expect delays. Pls find alt transport

Golliwog

Noted a Shorncliffe train shown on the PIDS at Central as scheduled to depart at 7:25pm this evening and run express from Bowen Hills to Northgate. There is no such service in the timetable, and the Doomben service that arrive before it was held to allow it to pass at Central (to give it greens rather than ride reds/yellows). I presume this was to allow it to get back on time from a previous delay, however I found it odd that instead of the usual occurrence which is to have the PID keep the original timetabled departure time and show it as delayed they changed it to the estimated departure time.

While it was announced as running express, while I was there I heard no announcement saying that this was a delayed service just that it was running express. Hopefully announcements were made early enough at the stations to be skipped that any Shorncliffe bound pax could catch the previous service and change at Northgate.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

ozbob

http://translink.com.au/travel-information/service-notices/6416/details

Inbound Airport, Caboolture, Sunshine Coast, Ferny Grove, Doomben and Shorncliffe line trains, 10min delays, track fault, CBD

Last updated: 8.26am Friday 7 February 2014

Trains travelling inbound on the Airport, Caboolture, Sunshine Coast, Ferny Grove, Doomben and Shorncliffe lines can experience up to 10 minute delays due to a track fault between Bowen Hills station and Fortitude Valley station. Technicians are on site.
Affected services
Trains

    Airport Line
    Caboolture Line
    Doomben Line
    Ferny Grove Line
    Shorncliffe Line
    Sunshine Coast Line

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

The 7:55am FG to Roma St service was also cancelled yesterday morning after a mechanical fault of some description at the platform at FG. No notification of delays for any other services and they appeared to be doing some very quick turn arounds on P2.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

petey3801

The 6:39am express from Cleveland got routed behind the all stopper from Manly this morning. Ended up arriving a bit over 10 late into Central.
All opinions stated are my own and do not reflect those held by my employer.

ozbob

http://translink.com.au/travel-information/service-notices/6521/details

60 min delays due to points issue, Eagle Junction

Last updated: 8.58am Monday 10 February 2014

Airport line trains are delayed up to 60 minutes in both directions due to a points issue at Eagle Junction station. Technicians are on site.

==================

Not good ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ

Airport line trains now returning to normal following earlier point issue at Eagle Junction. #qr
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/6541/details

9.29am Roma Street to Gympie North train delayed 20 mins

Last updated: 10.10am Monday 10 February 2014

The 9.29am Roma Street to Gympie North train is delayed 20 minutes due to an earlier mechanical issue. This train is now due to arrive at Caboolture station at 10.38am, and Gympie North station at 1pm.

=============

ICE ?
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

Quote from: Golliwog on February 08, 2014, 08:09:50 AM
The 7:55am FG to Roma St service was also cancelled yesterday morning after a mechanical fault of some description at the platform at FG. No notification of delays for any other services and they appeared to be doing some very quick turn arounds on P2.
Happened again this morning, with the 7:25am 3 car service suffering a mechanical fault as well in P2 at FG. Once again, didn't seem to impact on trains leaving FG on time with some quick turn arounds in P1, though may have delayed outbound services a little waiting for the platform to clear.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

HappyTrainGuy

Fatality at Lawnton. Delays as a result. No more services for the night on the Caboolture line between Petrie and Bray Park.

ozbob

http://translink.com.au/travel-information/service-notices/6631/details

Residual delays following overhead power issue

Last updated: 7.09am Wednesday 12 February 2014

Airport, Cabooture, Doomben, Shorncliffe and Sunshine Coast line trains may experience residual delays of up to 10 minutes outbound following an earlier overhead power issue at Bowen Hills station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/6646/details

Trains resumed: Darra station

Last updated: 1.04pm Wednesday 12 February 2014

Ipswich and Springfield line trains have resumed following an earlier police request to suspend services. The following trains are delayed as a result:

    The 12.07pm Ipswich to Central train is delayed 10 minutes and is now due to arrive at Central station at 1.15pm
    The 11.58am Central to Ipswich train is delayed 20 minutes and is now due to arrive at Ipswich station at 1.15pm.

===============

Arrived at Darra ex Springfield Central and noted around 12 QPS platform 4 Darra 2 on platform 3.  Down Caboolture service arrived held.  Eventually pax from that train transferred to next down Caboolture which arrived on platform 3.  Shortly thereafter up Ippy arrived platform 2, up Springer platform 1.  Managed to get a short vid of a parallel departure from Darra.  Up Springfield out of one, Up Ippy out of two .. not sure who or what QPS looking for ..



Up Springfield (out of platform one Darra) Up Ipswich (out of platform two Darra), rare event short parallel run ..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Fukwits ...

Twitter

TransLink SEQ ‏@TransLinkSEQ 20m

Ipswich/Springfield line trains resumed following earlier bridge strike near Indooroopilly station. #qr
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/6916/details

5.56am Gympie North to Roma Street train cancelled

Last updated: 5.53am Tuesday 18 February 2014

The 5.56am Gympie North to Roma Street train is cancelled due to overhead power issue.  Rail bus will convey passengers from Gympie North to Nambour.

Passengers on rail bus will be conveyed from  Nambour to Roma Street this train will depart Nambour at 6.57am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Yes!  Traveston has a day in the sun!   :P :-t

===============================

http://translink.com.au/travel-information/service-notices/6916/details

5.56am Gympie North to Roma Street train cancelled

Last updated: 6.19am Tuesday 18 February 2014

The 5.56am Gympie North to Roma Street train is cancelled due to overhead power issue. This service will commence from Traveston at 6.14am. Rail bus will convey passengers from Gympie North to Nambour to connect with this service.

Passengers on rail bus will be conveyed from  Nambour to Roma Street this train will depart Nambour at 6.57am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/6931/details

Trains suspended: Traveston-Gympie North

Last updated: 10.08am Tuesday 18 February 2014

Gympie North line trains are suspended in both directions between Traveston and Gympie North stations due to an overhead power fault. The following arrangements have been made for the trains listed below:

    The 9.29am Roma Street to Gympie North train will terminate at Nambour station. A replacement bus will operate from Nambour to Gympie North station to transport customers
    The 1.20pm Gympie North to Roma Street train will commence at Nambour station. A replacement bus will operate from Gympie North to Nambour station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/6941/details

Trains suspended: Redbank-Gailes

Last updated: 2.18pm Tuesday 18 February 2014

Ipswich line trains are suspended in both directions between Redbank and Gailes stations due to a bridge strike at Layards Street, Goodna. Customers can expect delays of up to 10 minutes.

Bridge inspectors are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/7006/details

10 min delays due to track fault

Last updated: 9.02am Wednesday 19 February 2014

Caboolture and Sunshine Coast line trains are delayed up to 10 minutes in both directions due to a track fault between Bray Park and Lawnton stations. Technicians are en route.