• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

Arnz

Quote from: Fares_Fair on September 25, 2012, 17:11:15 PM

The 3.23pm Caboolture - Nambour train has experienced a fault and has now ceased its service.

Passengers will continue their trip on the following train and will arrive at Nambour at 5.25pm.

We thank you for your patience.

The Gympielander last week, and now the ICE shuttle.  Once again, the ICE strikes again. :hc

As much as they boast the most comfortable seating of the fleet, it's a good thing they aren't doing much work those days outside of the twice daily Gympielanders and the morning counterpeak and afternoon counterpeak shuttles.
Rgds,
Arnz

Unless stated otherwise, Opinions stated in my posts are those of my own view only.

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ

Some Cleveland line trains delayed <10mins due to track fault between Park Road - Sth Bank. Some services will travel via Dutton Park.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

O_128

Gold Coast train delayed by 10 minutes. Means an extra half hour wait for connecting bus at nerang :/
"Where else but Queensland?"

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ

Ipswich/Rosewood and Richlands trains returning to normal after earlier bridge strike at Park Road, Milton. Minor residual delays remain.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

Quote from: ozbob on September 25, 2012, 19:32:52 PM
I am not an apologist.  However, I understand there are some platform changes happening. This undoubtedly  complicates a lot of things.

It is good that TL have acknowledged that there is an issue, and it will be sorted. Not more can be expected, so thank you.

All good  :)
Regards,
Fares_Fair


petey3801

Quote from: ozbob on September 26, 2012, 11:38:56 AM
Twitter

TransLink SEQ ‏@TransLinkSEQ

Ipswich/Rosewood and Richlands trains returning to normal after earlier bridge strike at Park Road, Milton. Minor residual delays remain.

Again...  ::)
All opinions stated are my own and do not reflect those held by my employer.

Derwan

http://jp.translink.com.au/travel-information/service-updates/details/1348737943

Quote
Buses are replacing t in both directions between Northgate and Shorncliffe stations until the last service Thursday night. This is due to an earlier police incident.
Customers should expect 30 minute delays.

There's that "police incident" again.  Anyone know what happened?
Website   |   Facebook   |  Twitter

Derwan

Buses still running on the Shorncliffe line this morning!

I just heard a train go past so perhaps things are getting back to normal.

Must've been some serious "police incident".

Correction:  Buses are running  between Sandgate and Shorncliffe.  That's why I heard the train go past.  This will cause delays as they have to turn back at Sandgate.
Website   |   Facebook   |  Twitter

kw

Quote from: Derwan on September 27, 2012, 21:44:38 PM
http://jp.translink.com.au/travel-information/service-updates/details/1348737943

Quote
Buses are replacing t in both directions between Northgate and Shorncliffe stations until the last service Thursday night. This is due to an earlier police incident.
Customers should expect 30 minute delays.

There's that "police incident" again.  Anyone know what happened?

Large fire at the timber yard Shorncliffe end of Sandgate station. Overhead was switched off last night due to the proximity of the fire. Trains weren't running past Sandgate this morning till structure in timber yard was deemed safe. No delays from turn backs at Sandgate.

Derwan

Quote from: kw on September 28, 2012, 09:13:55 AM
Large fire at the timber yard Shorncliffe end of Sandgate station. Overhead was switched off last night due to the proximity of the fire. Trains weren't running past Sandgate this morning till structure in timber yard was deemed safe. No delays from turn backs at Sandgate.

Thanks kw.  :)
Website   |   Facebook   |  Twitter

ozbob

A number of  " police incidents " that disrupted services at Southbank last evening unfortunately.

Don't know the details, maybe trespassers etc.

=============

Twitter

TransLink SEQ ‏@TransLinkSEQ 5h

Trains are suspended between South Bank and South Brisbane stations due to a police incident.

=============

Twitter

TransLink SEQ ‏@TransLinkSEQ 8h

Cleveland, Gold Coast, Beenleigh, Ferny Grove and Shorncliffe trains delayed 15 min due to an earlier police incident at Southbank station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://jp.translink.com.au/travel-information/service-updates/details/1349069707

Trains cancelled between Ipswich and Rosewood

Last updated: 3.35pm Monday 1 October 2012

The following trains have been cancelled due to an earlier police incident at Walloon:

    3.35pm Ipswich to Rosewood train
    4.05pm Rosewood to Ipswich train
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Couriermail --> Slow trip home for rail commuters after boom gates smashed at Bethania

===============

http://jp.translink.com.au/travel-information/service-updates/details/1349158035

30 minute train delays: Beenleigh and Gold Coast

Delays caused by boomgate damage at Bethania earlier this afternoon is now repaired and both the Beenleigh and Gold Coast trains have resumed.

It is expected a residual delay of up to 30 minutes will occur for passengers as the trains regain full schedule.

We thank you for your patience.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://jp.translink.com.au/travel-information/service-updates/details/1349309504

Gold Coast and Beenleigh line delays

Last updated: 10.11am Thursday 4 October 2012

The Gold Coast and Beenleigh lines are delayed 10 minutes in both directions due to an issue with the boom gate at the Bounday Road level crossing at Cooper Plains.

Queensland Police and Queensland rail technicians are on site to recify the issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ

Delays to trains on the Sunshine Coast line. See http://translink.com.au  for details.

============

http://jp.translink.com.au/travel-information/network-information/trains/sunshine-coast

Delays to Gympie train 17 minutes
From Thursday 4 October 2012

6.53pm Caboolture to Nambour train delayed
From Thursday 4 October 2012

6.35pm Caboolture to Gympie train delayed
From Thursday 4 October 2012
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Oh dear, oh dear ..

=================

erail 7.28pm

4 Oct 2012

30 mins delay for services on CBD Line due to power fault. Service to resume by 8:30 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Arnz

Quote from: ozbob on October 04, 2012, 19:20:35 PM
Delays to Gympie train 17 minutes
From Thursday 4 October 2012

6.53pm Caboolture to Nambour train delayed
From Thursday 4 October 2012

6.35pm Caboolture to Gympie train delayed
From Thursday 4 October 2012

The ICE strikes again!  ::)  Causing a knockback affect to the following Nambour service. 

Think the ICE breaking down a few times a week should be expected as norm for the next couple of years, at least till the NG passenger rollingstock arrives by then..
Rgds,
Arnz

Unless stated otherwise, Opinions stated in my posts are those of my own view only.

ozbob

Quote from: ozbob on October 04, 2012, 19:39:03 PM
Oh dear, oh dear ..

=================

erail 7.28pm

4 Oct 2012

30 mins delay for services on CBD Line due to power fault. Service to resume by 8:30 PM.

Twitter

1m TransLink SEQ TransLink SEQ ‏@TransLinkSEQ

Trains on all lines are delayed up to 20 minutes through the CBD due to a power fault.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

Expect some form of disruption on southbound trains through Central. I caught the 6am from Ferny Grove. Currently stuck in the  tunnel between Central and RS for the last 10 minutes due to "a major fault with this train". Nothingon Translink yet.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

Golliwog

Just had the guard announce we're now waiting on a rescue train to push us to Roma St. No eta given.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

Quote from: ozbob on October 05, 2012, 06:47:51 AM
Thanks for the updates ...
No worries.

Just lost the lights, then back on. I didn't realise but with the lights off I can see the back half of the train is still in the platform. Just moved a bit so I think the pushing train might be here now...
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

ozbob

http://jp.translink.com.au/travel-information/service-updates/details/1349383862

6.24am Bowen Hills - Beenleigh train cancelled

Last updated: 6.51am Friday 5 October 2012

The 6.24am Bowen Hills - Beenleigh train has been cancelled due to a mechanical fault.

==========

This might be your pusher Golli ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

Just got into Roma St p3 under our own power it seems. Terminated here though.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

Golliwog

Quote from: ozbob on October 05, 2012, 06:56:35 AM
http://jp.translink.com.au/travel-information/service-updates/details/1349383862

6.24am Bowen Hills - Beenleigh train cancelled

Last updated: 6.51am Friday 5 October 2012

The 6.24am Bowen Hills - Beenleigh train has been cancelled due to a mechanical fault.

==========

This might be your pusher Golli ...
Interesting, I think that might be my service not the pusher. The 6am FG to Beenleigh train is due at Bowen Hills at 6.25am by the TL timetable.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

ozbob

Yes,  your service ...  no twitter from TL (and QR of course ...).   Was mentioned on 612 ABC Radio following a tweet from me ..  ;)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

Quote from: ozbob on October 05, 2012, 07:07:11 AM
Yes,  your service ...  no twitter from TL (and QR of course ...).   Was mentioned on 612 ABC Radio following a tweet from me ..  ;)
I think half the problem is that QR doesn't want to put anything out until they themselves know whats going on. Just got into Park Rd on a GC train that was 6 minutes late after it ran through p8 at Roma St.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

ozbob

Overnight, twitter report of police incident on southern line.  Trains terminated at Loganlea, then bus.

No official notifications.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 8.20am

7 Oct 2012

Disruptions on Gold Coast Line due to signalling fault. Expect 1 hr delay. Service to resume by 10:00 AM.

Alt. transport operating between Dutton Park and Moorooka.

==========

Nothing on TransLink web site or twitter feed ... as of 8.51am

Tweet 8.53am

=================

Twitter

TransLink SEQ ‏@TransLinkSEQ

Gold Coast/Beenleigh trains delayed. Visit http://translink.com.au  for more.

=================

Erail trumps twitter by 31 minutes ...

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://jp.translink.com.au/travel-information/service-updates/details/1349563845

Beenleigh/Gold Coast train disruptions

Last updated: 8.50am Sunday 7 October 2012
Trains on the Beenleigh and Gold Coast lines are delayed due to a signalling fault.
Buses have replaced trains between Dutton Park and Moorooka.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 9.15am

7 Oct 2012

Disruptions on Gold Coast Line due to signalling fault. Expect 1 hr 30 mins delay. Service to resume by 11:00 AM.

Alt. transport operating between Dutton Park and Moorooka.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

HappyTrainGuy


ozbob

erail 10.26am

7 Oct 2012

Disruptions on Gold Coast Line due to signalling fault. Expect 1 hr 30 mins delay. Service to resume by 12:00 PM.

Alt. transport operating between Dutton Park and Coop Plains.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

p858snake

Quote@walkabout71: Thanks for wrecking my Sunday @QueenslandRail mo communication it is very hot standing in the Sun beanleagh line is f%cking shocking
@QueenslandRail: @walkabout71 Sincerely apologise for the delays at the moment. We're investigating the communication, could you please advise which station?


@BigUnit24: @QPSmedia @QueenslandRail Brisbane - Gold Coast train has been stopped mid track for an hour. Any details? Any idea of how much longer?
@QueenslandRail: @BigUnit24 hi, sincere apologies about this delay. Could you let us know where you are? Our info is that all trains are held at platforms.

@NotBenHallett: @QueenslandRail 4th <1.5 hr delay this year, sort it out.
@QueenslandRail: @NotBenHallett sincere apologies for delays this morning on the GC/Bnlgh line. We will be fully investigating the cause of the incident.


ozbob

Twitter

9m Queensland Rail Queensland Rail ‏@QueenslandRail

Apologies to customers for delays this morning RT @TransLinkSEQ: Gold Coast/Beenleigh trains delayed. Visit http://translink.com.au  for more.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter is the perfect push comm medium, and yet again they fail to use it properly ...

Took TransLink half an hour to put anything out.  The first erail was at 8.20am, this should have been tweeted immediately ...


Quote from: p858snake on October 07, 2012, 10:55:25 AM
Quote@walkabout71: Thanks for wrecking my Sunday @QueenslandRail mo communication it is very hot standing in the Sun beanleagh line is f%cking shocking
@QueenslandRail: @walkabout71 Sincerely apologise for the delays at the moment. We're investigating the communication, could you please advise which station?


@BigUnit24: @QPSmedia @QueenslandRail Brisbane - Gold Coast train has been stopped mid track for an hour. Any details? Any idea of how much longer?
@QueenslandRail: @BigUnit24 hi, sincere apologies about this delay. Could you let us know where you are? Our info is that all trains are held at platforms.

@NotBenHallett: @QueenslandRail 4th <1.5 hr delay this year, sort it out.
@QueenslandRail: @NotBenHallett sincere apologies for delays this morning on the GC/Bnlgh line. We will be fully investigating the cause of the incident.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

People heading to the airport will be freaking out ...

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

5m TransLink SEQ TransLink SEQ ‏@TransLinkSEQ

Beenleigh / Gold Coast trains resumed. Residual delays. Visit http://translink.com.au  for more.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Set in train

And with Airtrain, this GC line is really one of the most, if not the most crucial line of them all. If it had to happen any day, at least it is a Sunday.

I wonder if Minister Emerson or Assistant Minister Minnikin are taking time out of their Sunday routine to involve themselves in this, where appropriate?

🡱 🡳