• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

SurfRail

Quote from: ozbob on April 30, 2012, 07:35:40 AM
Three 3 car set replacements this morning, must have been a bad weekend for graffiti?

Add to this the Gold Coast to Airport service ex-Nerang at 6:59.  This was actually worthy of the Bombay Express epithet for once.
Ride the G:

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1335763681

Gold Coast train delays

Trains on the Gold Coast line in both directions may be delayed due to a track fault between Coomera and Helensvale.

Customers can expect delays of up to 15 minutes.

===============

Single line ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

ABC Radio Brisbane ‏ @612brisbane

INBOUND platform DUTTON PARK CLOSED due police incident
5:39 AM - 1 May 12
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1335914122

Airport line track fault

Trains on the Airport line in both directions are being delayed up to 15 minutes, due to a track fault near Eagle Junction station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336026017

Airport and Gold Coast train delays

Trains traveling both directions on the Airport and Gold Coast lines will be delayed due to a track fault at Eagle Junction.

Customers can expect delays of up to 30 minutes.

The Airport train will now operate as a half hour service. Normal services should resume by 6.00pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336027399

Doomben train delays

Trains on the Doomben line will be delayed by up to 30 minutes due to a track fault at Eagle Junction.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336031730

Cleveland train delays

Trains traveling inbound and outbound on the Cleveland line will turn back from Wellingtion point, due to a track fault at Wellington Point.

Alternative travel is being arranged for passengers between Wellington Point and Cleveland.

Please follow the directions of Queensland Rail staff.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏ @TransLinkSEQ

Gold Coast and Beenleigh trains delayed up to 30 minutes by points fault at Holmview. Airport trains also delayed.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336125756

Points fault at Holmview

The Gold Coast and Beenleigh train lines have been reduced to a single track between Bethania and Holmview stations.

All inbound and outbound trains are still running but will face delays up to 30 minutes as the single line causes opposing trains to wait for services ahead of them to clear the line.

Airport trains using this line will also face delays. 

================

Spotted an Up cattle train 23/1720 up front passing Darra late this afternoon. Guess it has been down Holmview ... lol
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏ @TransLinkSEQ

Buses being arranged between Kuraby and Beenleigh train stations due to delays and cancellation of trains caused by points fault.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏ @TransLinkSEQ

The 11.24pm Central to Varsity Lakes train has been cancelled. This train originates from Bowen Hills at 11.17pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336353938

Line closed between Y'Pilly and Kingston stations

Gold Coast, Beenleigh and Airport trains are unable to run between Yeerongpilly and Kingston stations due to a police incident.

Buses are being arranged to transport customers between Kingston, Woodridge, Trinder Park, Kuraby, Fruitgrove, Runcorn, Altandi, Sunnybank, Banoon, Coopers Plains, Salisbury, Rocklea, Moorooka and Yeerongpilly stations.

Trains are still running from Central to Yeerongpilly and return, and also from Varisty Lakes/Beenleigh up to Kingston and return.

Buses expected to be on site about 12.25pm. Expect delays of at least one hour.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on May 07, 2012, 12:10:06 PM
http://translink.com.au/travel-information/service-updates/bulletin/1336353938

Line closed between Y'Pilly and Kingston stations

Gold Coast, Beenleigh and Airport trains are unable to run between Yeerongpilly and Kingston stations due to a police incident.

Buses are being arranged to transport customers between Kingston, Woodridge, Trinder Park, Kuraby, Fruitgrove, Runcorn, Altandi, Sunnybank, Banoon, Coopers Plains, Salisbury, Rocklea, Moorooka and Yeerongpilly stations.

Trains are still running from Central to Yeerongpilly and return, and also from Varisty Lakes/Beenleigh up to Kingston and return.

Buses expected to be on site about 12.25pm. Expect delays of at least one hour.

Twitter

TransLink SEQ ‏ @TransLinkSEQ

Trains remain suspended betw Kuraby and Banoon stations following scaling back of the closure which had been betw Y'pilly and Kingston.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

From the Couriermail click --> here!

Train services resume on Beenleigh-Gold Coast line, disrupts airport travellers after police incident

QuoteTrain services resume on Beenleigh-Gold Coast line, disrupts airport travellers after police incident

    by: Robyn Ironside
    From: The Courier-Mail
    May 07, 2012 2:51PM

TRAINS are running again on the Gold Coast-Beenleigh line after being halted by a police incident which has also had repercussions for people travelling to Brisbane Airport this Labour Day holiday.

Buses had replaced trains at six stations as a result of the incident about 10 am between Kuraby and Banoon.

Trains have since resumed but delays are excepted to continue.

Travellers on the Gold Coast-Beenleigh line, and the Airtrain, have been warned to expect delays of up to an hour.

Overhead power has been restored to some sections of the line but Kuraby, Runcorn, Fruitgrove, Altandi, Sunnybank and Banoon stations were out of action.

Trains are still running from Central south to Banoon station and return, and from Varsity Lakes and Beenleigh to Kuraby and back.

Traffic is also heavy on the highways to and from the Gold and Sunshine Coasts as families seek to take advantage of the glorious holiday weather.

Congestion is also being reported on the roads throughout the Gold Coast, including the Gold Coast Highway, Marine Parade and Sea World Drive.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

twitter

TransLink SEQ ‏ @TransLinkSEQ

Trains suspended on Gold Coast and Beenleigh lines due to police incident at Altandi station. Airport services also likely to be delayed.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336633684

4.30pm Nambour Caboolture train delay

The 4.30pm Nambour-Caboolture train is delayed by 25 minutes due to a mechanical issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 11.52am

11 May 2012

Disruptions on Gold Coast Line due to train fault. Expect 30 mins delay. Service to resume by 1:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336701500

Trains suspended through Yeerongpilly

Trains are currently suspended on the Gold Coast and Beenleigh lines due to a track fault at Yeerongpilly.

Outbound trains are facing delays up to 45 minutes.

Inbound trains are travelling into the city via the Tennyson loop line and connecting with the Ipswich line at Corinda.

For inbound passengers travelling to stations missed by the Tennyson Loop diversion buses will operate between Moorooka and and Dutton Park stations (Moorooka, Yeerongpilly, Yeronga, Fairfield and Dutton Park) 
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336701500

Trains resumed: Yeerongpilly

Trains through the Yeerongpilly area on the Gold Coast and Beenleigh lines have resumed after an earlier track fault.

Customers may experience residual delays up to 30 minutes while trains return to normal timetable running, particularly on the Gold Coast line.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1336725747

Ipswich train delays

Inbound trains on the Ipswich line may be delayed by up to 10 minutes due to a signals fault at between Redbank and Goodna.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏ @TransLinkSEQ

Airport and Doomben line trains delayed 30 mins both directions due to a power fault at Eagle Junction. Ob Shorncliffe line trains delayed.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 11.57am

12 May 2012

30 mins delay for the Varsity Lakes train departing Bowen Hills at 11:47 AM due to track fault. Service to resume by 1:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 6.25am

14 May 2012

Disruptions on Cleveland Line between Cleveland and Thorneside due to signalling fault. Expect 1 hr delay. Service to resume by 8:00 AM.

Alt. transport operating between Cleveland and Thorneside.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

kazzac

Quote from: ozbob on May 14, 2012, 06:34:42 AM
erail 6.25am

14 May 2012

Disruptions on Cleveland Line between Cleveland and Thorneside due to signalling fault. Expect 1 hr delay. Service to resume by 8:00 AM.

Alt. transport operating between Cleveland and Thorneside.
Lucky I was able to drive to work this morning then!
only an occasional PT user now!

ozbob

Twitter

5m TransLink SEQ TransLink SEQ ‏ @TransLinkSEQ

Inbound trains on Airport, Caboolture, Sunny Coast and Shorncliffe lines delayed around 5 mins due to track fault at Albion
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏ @TransLinkSEQ

Track fault has cleared at Albion and delays inbound through the area are easing.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1337042479

Trains suspended - Bundamba to Goodna

Trains are suspended between Bundamba and Goodna due to a track fault near Riverview. The fault is holding up a freight train, which is prohibitting urban services.

Buses are replacing trains in both directions between Bundamba and Goodna.

Customers should expect delays of up to 30 minutes.   
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

At Roma St waiting for the 11.30am Ippy, no drama here ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on May 15, 2012, 11:27:15 AM
At Roma St waiting for the 11.30am Ippy, no drama here ...

Ontime at Milton, fortunately Goodna is bi-di and can be used as a turnback station as needed ..

Nothing yet in terms of announcements or anything, might be cleared or they hope it will be the time we get to Goodna ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Corinda, no annoucements or anything.

Just passed down coalie (up sub)  wonder if that was the freight train referred to by TL above ..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLink SEQ ‏ @TransLinkSEQ

Ipswich line trains resumed Bundamba to Goodna following earlier track fault. Delays of 20 mins remain - http://bit.ly/Jrrr0B

:co3
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1337070567

Robina train disruption

All train services travelling through Robina are currently stopped due to a police incident at Robina Station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1337070567

Robina train disruption

All train services are travelling through Robina at restricted speed due to an earlier police incident at Robina Station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ClintonL94

#2713
Currently onboard the 19:48 Brisbane Airport ex Nerang running 15 minutes down due to police incident at Robina. So far no notice on the translink website about this delay.

One would think if a train is 15 minutes late customers should be made aware of it by Translink. I was notified by the station staff at Nerang.

ClintonL94

Quote from: ozbob on May 15, 2012, 18:55:19 PM
http://translink.com.au/travel-information/service-updates/bulletin/1337070567

Robina train disruption

All train services are travelling through Robina at restricted speed due to an earlier police incident at Robina Station.
Bob just saw your post - although trains are still delayed yet the notice is no longer on the website.

ClintonL94

Arrived at South Bank 21:24 - 24 minutes down since we had to drive slow for 10 minutes due to the all stations train just ahead of us. QR decided not to use the express track between Kuraby and South Bank to gain time. I have just requested a reason why the express track was not used.

Again, the train is running even later now and still nothing about this on the Translink website. Not good enough.

ozbob

Twitter

TransLink SEQ ‏@TransLinkSEQ

Trains suspended at Beerburrum due to a track fault, buses replacing trains Caboolture to Nambour - Visit http://translink.com.au for more.

8:43 PM - 17 May 12
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

Regards,
Fares_Fair


ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1337322512

Cleveland-Doomben train delay

The 4.24pm Cleveland to Doomben train is delayed by up to 15 minutes due to an earlier signal fault at Wynnum.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1337322683

4.37pm Central-Ferny Grove train delay

The 4.37pm Central to Ferny Grove train may be delayed by up to 10 minutes due to an earlier signal fault at Wynnum.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳