QuoteInbound Sunshine Coast and Caboolture Line trains are up to 16 minutes behind schedule this morning, due to a previous freight train experiencing a mechanical fault between Eudlo and Mooloolah and causing delays.

   The 5.16am Roma St - Nambour service is 13 minutes delayed. This service is expected to arrive at Central at 7.57am.
   The 5.50am Nambour - Central train is 16 minutes delayed. This service is expected to arrive at Central at 8.02am.

Although I still lol at the first one.  No such service in the timetable. (IIRC the nearest service is either the 5:25am inbound from Nambour or the 5:21am outbound from Roma Street!)
Rgds,
Arnz

Unless stated otherwise, Opinions stated in my posts are those of my own view only.

HappyTrainGuy


Fares_Fair

Single Line Track issue.

My report received from a commuter who normally catches the 5:25am train from Nambour to Roma St, was that it became the 5:50am train from Nambour to Roma St. after the buses failed to arrive.

Regards,
Fares_Fair.
Regards,
Fares_Fair


HappyTrainGuy

#2323
Trains southbound are being held at park road and central due to a police incident between Park Road-Southbank.

Edit: services have resumed.

STB

Looks like the Cleveland line is having a bad day...

http://translink.com.au/travel-information/service-updates/bulletin/1328233969

Trains suspended: Murarrie-Manly stations

QuoteCleveland line trains are suspended in both directions between Murarrie and Manly stations due to an overhead power issue near Lindum station.

Buses are being sought and expected to arrive about 12.30pm.

Customers should expect delays of 30 minutes at this stage.


ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1328233969

Trains suspended: Murarrie-Manly stations

Cleveland line trains are suspended in both directions between Murarrie and Manly stations due to an overhead power issue near Lindum station.

Buses are running between Murarrie and Manly, stopping all stations.

Customers should expect delays of 30 minutes.

==================

:hc
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The network is a disgrace ...

It is the sum result of failure maintenance and government neglect.

RAIL Back On Track will deliver a 'customer experience ' that is very positive ... LOL

VOTE RBoT!
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 4.50pm

3 Feb 2012

Disruptions on Cleveland Line between Manly and Murrarie due to power fault. Expect 1 hr delay. Service to resume by 6:30 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

SurfRail

This is utterly disgraceful.  Why with all these weekend possessions of entire stretches of line are the critical works not being done?
Ride the G:

Fares_Fair

I have been told by QR staff that train gangs no longer walk along the tracks identifying problems, due to safety issues. Nor are they based close to outlying major centres. It's failure that triggers a response.

As an aside, I can confirm that fare gates are being installed at Nambour station.

Regards,
Fares_Fair.
Regards,
Fares_Fair


#Metro

QuoteThe network is a disgrace ...

It is the sum result of failure maintenance and government neglect.

RAIL Back On Track will deliver a 'customer experience ' that is very positive ... LOL

VOTE RBoT!

Muffins for EVERYONE!!!
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

SurfRail

Quote from: ozbob on June 09, 2009, 16:31:05 PM
On the move , reduced speed.  VAS just announced next station as Trinder Park  ....  whoaa   stopped just outside of Chelmer!  :D :D :D

If its an EMU VAS then that is not very surprising!
Ride the G:

ozbob

erail 5.51pm

3 Feb 2012

Disruptions on Cleveland Line between Manly and Murrarie due to power fault. Expect 1 hr delay. Service to resume by 7:30 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on February 03, 2012, 17:55:23 PM
erail 5.51pm

3 Feb 2012

Disruptions on Cleveland Line between Manly and Murrarie due to power fault. Expect 1 hr delay. Service to resume by 7:30 PM.

Lucky, hey


Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 5.58pm

3 Feb 2012

Disruptions on Cleveland Line between Manly and Murrarie due to power fault. Expect 1 hr delay. Service to resume by 8:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter
TransLink SEQ
TransLinkSEQ TransLink SEQ
The 5.53pm Nambour-Central train is running about 12mins late due to an earlier incident.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Arnz

Quote from: Fares_Fair on February 03, 2012, 17:28:10 PM
I have been told by QR staff that train gangs no longer walk along the tracks identifying problems, due to safety issues. Nor are they based close to outlying major centres. It's failure that triggers a response.

As an aside, I can confirm that fare gates are being installed at Nambour station.

Regards,
Fares_Fair.

Have to wonder if Landsborough are getting their fare gates?  They do carry 40%+ of the Sunshine Coast Line peak hour train commuter traffic.
Rgds,
Arnz

Unless stated otherwise, Opinions stated in my posts are those of my own view only.

Golliwog

Again, something they neglect to mention as part of these delays is the impact to inner south side pax wanting to head north. I went to South Bank station, just after the 4.26pm FG service left, and noted the 4.46pm Mitchelton service was absent from the PIDs. I caught a Airport service to Roma St and ended up catching the timetabled RS starting FG express, but did note that the Mitchelton service was up on the PIDs there.

As a plus, this does seem to indicate that they can now delete cancelled services from the new PIDS which is a plus, though I think it may be more useful to leave it in the list but mark it as cancelled instead of the expected time of arrival. Heck, with the new screens, they could probably even give a short reasoning as to why it was cancelled.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

STB

Just heard from QR, that Manly to Murrarie disruption that happened last week was caused by a tree falling onto the overheads.

p858snake

Didn't see the actual issue tweeted but CAB services had issues earlier, but it's on their websites (Maybe they don't tweet if the issue delay is estimated at <~5mins)

QuoteSvenNotnop: @QueenslandRail So yu give us a muffin & water to apologise for 2 hr delay on Friday night and now.Delayed again . Joke right #qrdailyfail
QueenslandRail: @SvenNotnop Apologies, what service are you on?
SvenNotnop: @QueenslandRail caboolture save the apologies like everyone else on this line tired of them provide service for the 15 % more #qrdailyfail
QueenslandRail: @SvenNotnop Delays due to an earlier police incident. @TransLinkSEQ are responsible for setting fares across all public transport.
SvenNotnop: @QueenslandRail @translinkseq plse get your story straight drivers says due to a point issue you say police incident = no svce #qrdailyfail

QuoteTrack fault at Petrie
Inbound trains are experiencing minor residual delays of up to five minutes through Petrie, following an earlier track fault.

somebody

Quote from: STB on February 06, 2012, 07:44:05 AM
Just heard from QR, that Manly to Murrarie disruption that happened last week was caused by a tree falling onto the overheads.
Don't they trim the trees back to prevent this?  Was there a storm?

ozbob

Twitter

612brisbane ABC Radio Brisbane
QR: points issue at Walloon, all services will be travelling through the area under special authority, delays of up to 15 minutes
5 minutes ago
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

p858snake

Quote from: Simon on February 06, 2012, 13:31:38 PM
Quote from: STB on February 06, 2012, 07:44:05 AM
Just heard from QR, that Manly to Murrarie disruption that happened last week was caused by a tree falling onto the overheads.
Don't they trim the trees back to prevent this?  Was there a storm?
I believe it was the whole tree and not just a few branches that caused this.

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1328576323

10.43am Nambour-Roma Street train delayed

The 10.43am Nambour-Roma Street train is delayed 32 minutes after a truck hit the rail bridge at Palmwoods.

This is the only train expected to be delayed.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1328670069

10-15 mins delays Thorneside due to points failure

Trains are delayed in both directions at Thorneside up to 15 minutes due to a points failure.

Technicians are en route to fix the problem.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1328670892

Trains suspended btwn Ferny Grove and Keperra stns

The 12.28pm is being held indefinitely at Ferny Grove station due to a medical emergency.

Trains on the Ferny Grove line will start and terminate at Keperra station until futher notice.

Buses are being arranged to run between Ferny Grove and Keperra stations until the train can be moved.

Wherever possible, customers should catch the train from Keperra station.

Customers requiring transport between Ferny Grove and Keperra on the bus expect delays of 10-15 minutes.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

petey3801

Caboolture and Sunshine Coast trains were suspended for a while this afternoon due to a boom arm strike at Geebung.

Also, Cleveland line trains are/were suspended between Lindum and Manly with buses running between due to a power issue..
All opinions stated are my own and do not reflect those held by my employer.

Arnz

We had our guard on the 4pm service apologise on QueenslandRail's behalf due to a "idiot driver" (his words) hitting the boomgates at Geebung earlier this afternoon.  At least we got home safely however, and we were kept up to date.  The guard at least had some sense of humor which got chuckles from throughout the train.
Rgds,
Arnz

Unless stated otherwise, Opinions stated in my posts are those of my own view only.

Fares_Fair

#2349
Quote from: Arnz on February 08, 2012, 20:01:37 PM
We had our guard on the 4pm service apologise on QueenslandRail's behalf due to a "idiot driver" (his words) hitting the boomgates at Geebung earlier this afternoon.  At least we got home safely however, and we were kept up to date.  The guard at least had some sense of humor which got chuckles from throughout the train.

Our guard or driver kept the 5:00pm service very well informed on the delays also.  :-t
Full marks to QR for doing a sterling job getting us home.

I reckon that the small truck's driver (from eye witness account), if shown to be negligent, should be sent the complete bill for the repairs.
Perhaps Government should consider excluding boom gate collisions, where the driver is at fault, from insurance policies.
It would mean drivers would take more care knowing it will cost them big (uninsured) money.

Regards,
Fares_Fair.
Regards,
Fares_Fair


ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1328741978

Bowen Hills network issue: Some trains delayed

Due to an earlier network issue at Bowen Hills the following services are delayed:

8.22am Central to Shorncliffe train is 12 minutes behind schedule and is due to arrive at Shorncliffe at 9.11am.

8.24am Central to Airport train is 11 minutes behind schedule and is due to arrive at the Domestic stop at 9.03am.

8.31am Central to Doomben train is 10 minutes behind schedule and is due to arrive at Doomben at 9.05am.

8.32am Central to Nambour train is 9 minutes behind schedule and is due at Nambour at 10.32am.

8.35am Central to Caboolture train is about 10 minutes behind schedule and is due to arrive at Caboolture at 9.50am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

Regards,
Fares_Fair


ozbob

erail 5.31am

10 Feb 2012

30 mins delay for services on CBD Line due to track fault. Service to resume by 8:00 AM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on February 10, 2012, 05:35:05 AM
erail 5.31am

10 Feb 2012

30 mins delay for services on CBD Line due to track fault. Service to resume by 8:00 AM.

A track vehicle has derailed at Roma St apparently (report 612 ABC radio), this means will be significant delays in the later morning peak.  I think platform 8 Roma St and 5 Central out of action for time being.

Never ends ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

ABC Radio Brisbane @612brisbane

Platform 8 at Roma St, Platform 5 at Central and Platform 3 at Fortitude Valley will be closed for this morning. Delays from 7.15am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1328815920

Trains delays through CBD this morning

There will be delays of up to 15-20 minutes on all train services on all lines through the CBD this morning, due to track damage caused by a track maintenance machine at Roma Street station.

Some platforms at Roma Street, Central and Fortitude Valley will not be used this morning.

Further delays are expected into the morning peak. Inbound services in particular are expected to be impacted.

The following services have been cancelled:

5.38am Central to Thorneside train

6.47am Thorneside to Central train

7.34am Darra to Central train

7.22am Petrie to Roma Street train 

It is anticipated that the repairs will be completed later this morning.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

ABC Radio Brisbane  @612brisbane

QR now says - from 7.15am delays of up to 15 minutes for services on the Caboolture/Sunshine Coast and Ipswich/Richlands lines.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

p858snake

Roma street issues now resolved (apparently)... Now points at Toombul.

Derwan

Quote from: p858snake on February 10, 2012, 08:59:04 AM
Roma street issues now resolved (apparently)... Now points at Toombul.

Yeah - colleague just had to switch trains from Sub to Main at Toombul.  Might be the points for the airport line.
Website   |   Facebook   |  Twitter

Golliwog

More issues this arvo. All north bound trains were using the mains @ 5pm due to an issue between Central and Roma St on the subs.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

🡱 🡳