• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ClintonL94

http://translink.com.au/travel-information/service-updates/bulletin/1318660689

Gold Coast train delays

Gold Coast trains have been suspended between Nerang and Varsity Lakes due to a signalling fault at Robina. Buses are being arranged.

Affected Services:

  • Gold Coast line




I doubt buses will be arranged though. They'll most likely be cancelled too.

http://www.bom.gov.au/cgi-bin/wrap_fwo.pl?IDQ20038.html

ozbob

erail 5.24pm

15 Oct 2011

Disruptions on Gold Coast Line between Varsity Lakes and Nerang due to extreme weather. Expect 1 hr delay. Service to resume by 7:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 6.09

15 Oct 2011

Disruptions on Gold Coast Line between Varsity Lakes and Nerang due to extreme weather. Expect 1 hr delay. Service to resume by 8:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 6.17pm

15 Oct 2011

1 hr delay for services on North Coast Line due to track fault. Service to resume by 8:00 PM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

Sunshine Coast major delay reported on Translink website as due to a track fault at [the single line track], Beerburrum.

Regards,
Fares_Fair.
Regards,
Fares_Fair


ozbob

erail 8.57pm 15th Oct

15 Oct 2011

30 mins delay for services on Ipswich/Rosewood Line between Sherwood and Taringa due to signalling fault. Service to resume by 10:00 PM.

===================

erail 9.27pm 15th Oct

15 Oct 2011

Services for Ipswich/Rosewood Line have resumed as normal.

===================
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

Quote from: Fares_Fair on October 15, 2011, 18:26:02 PM
Sunshine Coast major delay reported on Translink website as due to a track fault at [the single line track], Beerburrum.

Regards,
Fares_Fair.

Incidently, BWOE I do not include weekend disruptions in my monthly Sunshine Coast on time statistics.

Regards,
Fares_Fair.
Regards,
Fares_Fair


ozbob

Twitter

612brisbane ABC Radio Brisbane
5.25 Nambour to Central train commencing from palmwoods. nambour and Woombye customers being treated to taxis by QR
30 minutes ago
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

#1888
Quote from: ozbob on October 18, 2011, 06:24:45 AM
Twitter

612brisbane ABC Radio Brisbane
5.25 Nambour to Central train commencing from palmwoods. nambour and Woombye customers being treated to taxis by QR
30 minutes ago

Thanks ozbob,

Rather strange, I didn't receive any notifications via Translink or QR on this ...  :conf

I tweeted both Translink and QR asking if tweets were issued regarding the 5:50am Nambour train situation this morning.

The response from QR
twitter
Doesn't appear to be (we have an autoRT) I'll get some more information for you if you want?
Possibly a bit early for Translink to respond as yet.


FURTHER TWEETS FROM QR (and big thank you to QR for responding)...

twitter
I'm guessing the original disruption tweet didn't show up due to the timeframe for the delay. There was train fault at...

twitter
L'borough & as a result the nxt service started at Palmwoods w pax from Nbr and W-bye conveyed there.

Regards,
Fares_Fair
Regards,
Fares_Fair


somebody

7:06 FG train stopping all stations as the 7:17 Mitchelton train is cancelled.  Source: 612.

ClintonL94

http://translink.com.au/travel-information/service-updates/bulletin/1318897556

Ipswich line delays

Due to a boom arm fault at Rosewood, train services on the Ipswich/Rosewood line are terminating at Walloon. Buses are being arranged to transport passengers between Rosewood and Walloon stations. Passengers can expect delays of up to 30 minutes.

Affected Services

  • Ipswich Rosewood line

Golliwog

Quote from: Simon on October 18, 2011, 07:50:49 AM
7:06 FG train stopping all stations as the 7:17 Mitchelton train is cancelled.  Source: 612.
That was a fun ride. They did good and announced it, even the station announcement at Ferny Grove before it left had it as an all stopper. Jam packed though. I don't know if many managed to get on past Alderley. From where I was I saw at least half a dozen at Windsor who weren't bothering to even trying going up and down to other carriages, it was full. It was one of the new SMU's though so it was at least not an uncomfortable ride.

On another note, they have now started announcing the closure of South Brisbane station on the trains.
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

david

Quote from: ozbob on October 18, 2011, 06:24:45 AM
Twitter

612brisbane ABC Radio Brisbane
5.25 Nambour to Central train commencing from palmwoods. nambour and Woombye customers being treated to taxis by QR
30 minutes ago

Now that's what I call service! Well done QR!

ozbob

Twitter

QPSmedia QPS Media Unit
#bnetraffic Delays expected at Doomben Railway Station after a vehilce collided with boom gates.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ClintonL94

http://translink.com.au/travel-information/service-updates/bulletin/1319064756

Gold Coast/Beenleigh/Cleveland Line delays

Some inbound train services are delayed up to 10 minutes between South Brisbane and Roma St due to a previous service experiencing a mechanical fault and causing minor congestion.

Affected Services:

  • Beenleigh line
  • Cleveland line
  • Gold Coast line

Fares_Fair

Quote from: david on October 18, 2011, 18:44:29 PM
Quote from: ozbob on October 18, 2011, 06:24:45 AM
Twitter

612brisbane ABC Radio Brisbane
5.25 Nambour to Central train commencing from palmwoods. nambour and Woombye customers being treated to taxis by QR
30 minutes ago

Now that's what I call service! Well done QR!

+1


Regards,
Fares_Fair.
Regards,
Fares_Fair


ozbob

Twitter

612brisbane ABC Radio Brisbane
Central - Platforms 1 & 2 out of operation
57 seconds ago
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane ABC Radio Brisbane
Central plats 1 & 2 fixed
27 seconds ago
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Disruptions  for a short while on the Ipswich line earlier this afternoon due to this bridge strike ....

=================

From the Brisbanetimes click here!

Truck driver flees scene after underpass crash

QuoteTruck driver flees scene after underpass crash
Dan Nancarrow
October 21, 2011 - 5:27PM

Police are searching for a truck driver who scraped his B-double truck under two Goodna underpasses before fleeing from the scene of the accident on foot.

The truck driver had been travelling west along the Ipswich Motorway before exiting the road and travelling under the underpass.

The top of the truck then hit both the railway underpass and the motorway underpass, tearing the top off both the prime-mover and both trailers.

After the trucks scraped under both bridges the driver abandoned the car on Woogarro St and fled on foot in a direction unknown by police.

A street light was broken on the road bridge which otherwise only sustained paint scrapings.

Queensland Rail workers inspected the damage to the rail bridge, clearing it for usage.

Local Councillor Paul Tully this afternoon repeated his calls for warning  ''dangles'' before both bridges to warn drivers of the 3.8 metre height of the underpass.

Cr Tully said it is believed the driver had arrived from New Zealand only two weeks ago.

Police are still searching for the driver.

Read more: http://www.brisbanetimes.com.au/queensland/truck-driver-flees-scene-after-underpass-crash-20111021-1mc99.html

Said rail bridge



Road bridge



Photographs R Dow 28th June 2011
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1319577679

7.27am Doomben - City train delay

The 7.27am Doomben - City train may be delayed up to 15 minutes due to recently damaged boom gates at the Nudgee Road rail crossing (Doomben).

Queensland Rail technicians and Queensland Police en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

somebody

Quote from: ozbob on October 26, 2011, 07:45:21 AM
http://translink.com.au/travel-information/service-updates/bulletin/1319577679

7.27am Doomben - City train delay

The 7.27am Doomben - City train may be delayed up to 15 minutes due to recently damaged boom gates at the Nudgee Road rail crossing (Doomben).

Queensland Rail technicians and Queensland Police en route.

612 reported it had been cancelled.

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1319665127

Caboolture / Sunshine Coast Line inbound delays

Some inbound train services on the Caboolture/Sunshine Coast Lines may be delayed up to 10 minutes due to a points fault at Petrie.

    The 7am Caboolture - Central service will run express from Northgate - Bowen Hills for this morning to ease delays.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

#1902
Quote from: ozbob on October 27, 2011, 07:49:11 AM
http://translink.com.au/travel-information/service-updates/bulletin/1319665127

Caboolture / Sunshine Coast Line inbound delays

Some inbound train services on the Caboolture/Sunshine Coast Lines may be delayed up to 10 minutes due to a points fault at Petrie.

   The 7am Caboolture - Central service will run express from Northgate - Bowen Hills for this morning to ease delays.


Confirmed, 10 minutes late arrival at Central for 6:14am Nambour train.
We have had an excellent level of punctuality from 10 October to 25 October.


Regards,
Fares_Fair.
Regards,
Fares_Fair


ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1319695334

Trains suspended: Helensvale due to signal failure

Gold Coast trains in both directions at Helensvale have been suspended due to a signalling failure.

Buses are being arranged to move passengers between Coomera and Robina stations.

Delays of up to 45-60 minutes may be experienced during this afternoon's peak.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane ABC Radio Brisbane
QR: There has been a mechanical issue on an empty service in the Mayne yards which has prevented some customer services departing on time.
6 minutes ago
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

erail 6.18am

28 Oct 2011

The Bowen Hills train departing Cleveland at 6:25 AM is cancelled due to train fault. Service to resume by 6:42 AM.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1320216278

Train delays: Track fault at Bowen Hills

Due to a track fault at Bowen Hills, the following trains were diverted onto another platform and are currently delayed:

- 3.56pm and 4.04pm Central to Ferny Grove train 15 minutes late

- 4.16pm Central to Ipswich/ Rosewood train 10 minutes late

-  4.23pm Central to Gold Coast train 6 minutes late

- 4.25pm Central to Richlands train 10 minutes late

- 4..28pm Central to Ipswich/ Rosewood train 10 minutes late

- 4.31pm Central to Beenleigh train 5 minutes late

Other trains not listed here may also be delayed up to 10 minutes. Electricians are on site to resolve the issue
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane ABC Radio Brisbane
QR: There is a track fault at the junction leading to the Airport. 10 min delays.
2 minutes ago
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

TransLinkSEQ TransLink SEQ
Inbound trains on Ferny Grove, Caboolture, Sun Coast, Airport and Shorncliffe Lines delayed <20mins due to medical emergency @Bowen Hills.
2 minutes ago
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Derwan

Currently delayed at Albion.

They have automated delay announcements on the trains now!
Website   |   Facebook   |  Twitter

ClintonL94

#1910
http://translink.com.au/travel-information/service-updates/bulletin/1320399021

Trains suspended: Ormeau to Coomera

Trains are currently suspended between Ormeau and Coomera due to a track fault. Alternative transport is being arranged. Customers may experience delays of up 30 minutes.




Trains resumed: Ormeau to Coomera

Trains have resumed between Ormeau and Coomera following an earlier track fault. Customers may experience delays of up 15 minutes.

Affected Services:

  • Gold Coast line

petey3801

Quote from: Derwan on November 04, 2011, 08:22:49 AM
Currently delayed at Albion.

They have automated delay announcements on the trains now!

Yes, the VAS has had automated delay announcements since the introduction of the 160/260 Class units. It's just never used ;)
All opinions stated are my own and do not reflect those held by my employer.

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1320737239

Roma Street points issue: Delays on all lines

There is currently a points issue at Roma Street station.

Platform 6 is unable to be used, and southside services have been moved to platform 7.

This will cause delays of up to 5 minutes on all lines.

Electricians are on site to fix the issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1321256211

Beenleigh and Gold Coast trains: Inbound delays

Inbound Beenleigh and Gold Coast trains may be delayed up to 45 minutes due to an earlier failed train at Kuraby station.

Outbound trains are not impacted.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1321475848

Ipswich/Richlands/Gold Coast/Beenleigh Line delays

Inbound and outbound trains on the Beenleigh/Gold Coast and the Ipswich/Rosewood Lines may be delayed up to 10 minutes due to a recent track fault at Central affecting platforms 1 and 2.

Queensland Rail technicians are en route to fix the fault.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-updates/bulletin/1321475848

Minor train delays (all lines)

Inbound and outbound trains on all lines may be delayed up to 10 minutes due to a recent track fault at Central affecting platforms 1 and 2.

The following services are also affected as a result of the recent track fault:

    The 7.14am Lota - Central will begin from Manly instead of Lota this morning only.
    The 7.30am Lota - Bowen Hills will be cancelled for this morning.
    The 7.24am Cleveland - Bowen Hills will run all stops to Bowen Hills (instead of running express from Manly to Park Road).
    The 6.56am Central - Ipswich train is delayed around 13 minutes.

Queensland Rail technicians are on site to repair the fault.

Affected Services

    Beenleigh line
    Caboolture line
    Cleveland line
    Doomben line
    Ferny Grove line
    Gold Coast line
    Ipswich Rosewood line
    Sunshine Coast line
    Richlands line
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

somebody

Why's IPS-CAB affected?  I thought we went with sectorisation to prevent this.

Derwan

Trains from the north are running on mains, so all lines are affected.  We were stuck outside Bowen Hills for about 10 minutes.
Website   |   Facebook   |  Twitter

ozbob

From the Brisbanetimes click here!

Road and rail delays for CBD commuters

QuoteRoad and rail delays for CBD commuters
Dan Nancarrow
November 17, 2011 - 9:24AM

A three-car accident on the Story Bridge is causing delays for commuters travelling into the CBD this morning.

An Australian Traffic Network spokesman said traffic was banked up back to Lytton Road, Kangaroo Point as a result of the accident that occurred about 8.15am.

The accident has not yet been cleared.

Meanwhile, Queensland Rail has completed work on a broken rail at Central Station but inbound commuters will still experience delays throughout the morning.

A Queensland Rail spokesman said the rail fault at platform one was fixed at about 7.35am but platform two was still closed, leading to delays of up to 10 minutes for some inbound trains

Read more: http://www.brisbanetimes.com.au/queensland/road-and-rail-delays-for-cbd-commuters-20111117-1njxg.html
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

612brisbane ABC Radio Brisbane
06:14 Nambour to Roma St service is currently 11 minutes behind schedule in the Eudlo area as a consequence of a mechanical issue.
21 minutes ago
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳