• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

Caboolture & Redcliffe Peninsula line trains suspended in both directions due to a motor vehicle which has struck the level crossing boom gate at Strathpine. Customers can expect delays of 40 minutes.
7:15 AM - 13 Apr 2019

====

Caboolture and Redcliffe Peninsula line trains have resumed in both directions at Strathpine station following a motor vehicle which had struck the level crossing boom gate at Strathpine earlier.
7:20 AM - 13 Apr 2019
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

30 min delays: Caboolture, Ipswich, Redcliffe Peninsula & Springfield line trains due to a motor vehicle which had struck the level crossing boom gate earlier.

???
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

15 min delays: Caboolture, Ipswich, Redcliffe Peninsula & Springfield line trains due to a motor vehicle which had struck the level crossing boom gate earlier.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 5.51am Gympie North to Roma Street train is delayed 23 minutes due to a rollingstock issue.
This train is now due to arrive at Roma Street station at 9.02am.

:fp:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 11.01am Central to Ipswich train is delayed 11 minutes due to a motor vehicle which had struck the level crossing boom gate at Strathpine earlier.

This train is now due to arrive at Ipswich Station at 12.09pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Ipswich, Redcliffe Peninsula and Springfield line trains are delayed up to 30 minutes in both directions between Taringa and Indooroopilly stations due to a motor vehicle which has struck a rail bridge at Indooroopilly.

:frs:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

Ipswich and Springfield line trains have resumed following an earlier suspension between Taringa and Indooroopilly stations due to a motor vehicle which has struck a rail bridge at Indooroopilly.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

9.48pm Central-Cleveland train delayed 15 minutes

====

11.09pm Cleveland-Central train delayed 10 minutes
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

12.16am Kippa-Ring-Roma Street train delayed 20 minutes

====

The 12.46am Kippa-Ring to Roma Street train is delayed 15 minutes due to an overhead power line issue.

This train is now due to arrive at Roma Street station at 2am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The Gold Coast, Beenleigh, Cleveland line trains are suspended in both directions between South Brisbane and Park Road stations due to person trespassing. Customers can expect delays of up to 10 minutes.

Queensland Police are on site.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

The Gold Coast, Beenleigh, Cleveland line trains have resumed in both directions between South Brisbane and Park Road stations following an earlier person trespassing.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 10.22am Central to Kippa-Ring train is delayed 20 minutes due to a signal issue.

This train is now due to arrive at Kippa-Ring Station at 11.35am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Trains suspended: Salisbury to Rocklea
11:40 PM - 14 Apr 2019


====

Beenleigh and Gold Coast line trains have resumed in both directions between Salisbury and Rocklea stations following a police incident.
15 Apr 2019 at 12.12am

====

10.59pm Central-Varsity Lakes train delayed 37 minutes
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 11.37pm Central to Nambour train is delayed 13 minutes due to an incident requiring emergency services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

It is diabolical the shambles on the Sunny Coast / Gympie North lines ...

Utter embarrassment.  :-[
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 8.28am Central to Shorncliffe train will run express from Bowen Hills to Northgate due to an earlier customer requiring medical assistance.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Stillwater

QR should stop the farce of saying that SC on-time running performance is at 93 per cent, because that hides the diabolical horrible performance level of the Gympie North trains.  Gympie North trains should be monitored separately for on-time performance.  Just like an alcoholic's path to redemption starts by admitting they have a problem, so too must QR admit it has a problem re reliability of services north of Nambour. 

Right now it is saying 'what problem -- we just need to try a little bit harder to get the SC on-time running figure up to 95 per cent'.  Meanwhile, passengers who normally would use the Gympie North train are driving to Nambour or even to Caboolture.

Communities pushing for more frequent train services Nambour-Gympie North are being told they are not warranted due to low patronage numbers!
Wonder why. Doh!   :fp:

ozbob

People cannot use a service that is not really there.   

Years of mismanagement coming home to roost. 
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

7.04pm Domestic Airport to Bowen Hills train has been cancelled due to a rollingstock issue. The next Domestic Airport to Bowen Hills train will depart Domestic Airport Station at 7.34pm.

====

The 12.04am Central to Beenleigh train is delayed 20 minutes due to signalling fault.
This train is now due to arrive at Beenleigh station at 1.31am.

====

The 11.37pm Central to Nambour train is delayed 12 minutes due to rollingstock issue.
This train is now due to arrive at Nambour station at 1.38am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 9.47am Central to Cleveland train has been cancelled from Park Road to Cleveland due to a person reportedly trespassing in the corridor at Coorparoo station.

====

The 9.47am Central to Cleveland train has been reinstated from Park Road to Cleveland, however this train will be delayed by up to 18 minutes due to a person reportedly trespassing in the corridor at Coorparoo station.

====

Cleveland and Shorncliffe line trains are delayed up to 30 minutes in both directions due to a person reportedly trespassing earlier in the corridor at Coorparoo station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 11.09am Cleveland to Central train has been cancelled from Cleveland to Park Road due to a person reportedly trespassing earlier in the corridor at Coorparoo station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Trains resumed in both directions on the Cleveland line following a person reportedly trespassing earlier in the corridor at Coorparoo station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

tazzer9

Thats ridiculous that how they would cancel an entire service due to a person trespassing on only the 2nd station on the branch.  Could have always run well behind schedule and terminate early, at wellington point for example.

ozbob

The 5.56am Gympie North to Roma Street train is delayed 10 minutes due to a rollingstock issue. This train is now due to arrive at Roma Street station at 8.58am.

:fx
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Uh ... oh ...   :fp:

[UPDATE]
The 5.56am Gympie North to Roma Street train is delayed 20 minutes due to a rollingstock issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 7.52am Central to Kippa-Ring train is delayed 10 minutes due to a rollingstock issue.
This train is now due to arrive at Kippa-Ring station at 8.55am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


HappyTrainGuy

Quote from: ozbob on April 18, 2019, 07:48:16 AM
Uh ... oh ...   :fp:

[UPDATE]
The 5.56am Gympie North to Roma Street train is delayed 20 minutes due to a rollingstock issue.

Was an ICE. 156 I believe had the issue. The following Roma street train was delayed and ran express past eagle junction so it could slot into the gap between the Springfield train, the tilt train, the ice unit and the kippa ring train at Roma Street.

Stillwater

Fifty-seven per cent chance that a Gympie North train will be delayed or cancelled on any weekday.   :fp:

ozbob

Beenleigh line trains are delayed up to 10 minutes inbound between Kingston and Kuraby stations due to a track fault.
Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

4.34pm Domestic Airport to Central train has been cancelled from Domestic Airport to Eagle Junction due to a control decision.
The next Domestic Airport to Central train will depart Domestic Airport Station at 4.49pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

UPDATE: 8.13pm Central to Springfield train has been cancelled at Milton due to a customer requiring medical assistance. The next Central to Springfield train will depart Central Station at 8.43pm.

====

9.09pm Springfield Central to Central train has been cancelled from Springfield Central to Darra due to an earlier customer requiring medical assistance.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 5.28am Bowen Hills to Beenleigh train is delayed 15 minutes due to a rollingstock issue.

This train is now due to arrive at Beenleigh station at 6.56am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Ferny Grove and Airport line trains are delayed up to 15 minutes heading inbound due to a track fault at Woodridge.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳