• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

The 9.58am Central to Ipswich train is delayed 10 minutes due to an earlier incident requiring emergency services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Be interesting to know if the ' rollingstock issues ' are NGRs ...

Going to be a long 30 years by the looks of things ..  :o
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

The 9.33am Central to Gympie North train is delayed 11 minutes due to an earlier incident requiring emergency services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

^ nothing reported on twitter ..

In both cases I have queried why no reports of disruptions on twitter ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Last service disruption report was 15 h ago,  I find that a bit hard to believe ..   :fp:

https://twitter.com/TransLinkSEQ/status/1102896300083826688
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Service disruption notices have re-appeared ..

====

The 7.24pm Cleveland to Bowen Hills train is cancelled due to a rollingstock issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 7.47am Caboolture to Central train is delayed 12 minutes due to a signalling issue.

====

The 9.17am Central to Cleveland train is delayed 15 minutes due to an earlier incident requiring emergency services.

====

The 8.59am Central to Varsity Lakes train is delayed 20 minutes due to a signalling fault.

====

The 9.40am Varsity Lakes to Central train is delayed 15 minutes due to a signalling fault.

====

The 11.01am Central to Domestic Airport train is delayed 15 minutes due to a signalling fault.

====

UPDATE: The 11.01am Central to Domestic Airport train is delayed 10 minutes due to a signalling fault.

====

https://twitter.com/TransLinkSEQ/status/1103432160734732288

Shorncliffe line trains have resumed in both directions between Nundah and Eagle Junction stations following an earlier incident requiring emergency services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

5.24pm Roma Street to Nambour train is delayed 10 minutes due to a rostering issue.
This train is now due to arrive at Nambour station at 7.26pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 4.04am Central to Beenleigh train is delayed 14 minutes due to rostering requirements.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

^

UPDATE: The 4.04am Central to Beenleigh train is delayed 20 minutes due to rostering requirements.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 6.27am Central to Ferny Grove train will run express from Bowen Hills to Mitchelton due to wet weather.

The next Central to Ferny Grove train will depart Central station at 6.41am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Stillwater

Due to wet weather?  Wheels can't get a grip when stopping in heavy rain?

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Otto

I'm on the 5:09 ex Cleveland to Shorncliffe.
Held up at Thorneside for Cleveland bound service.
Guard has announced , Due to network technical difficulties, this service will run express from Cannon Hill to Buranda .
7 years at Bayside Buses
33 years at Transport for Brisbane
Retired and got bored.
1 year at Town and Country Coaches and having a ball !

ozbob

 :fp:

The 7.01pm Central - Domestic Airport train service has been cancelled from Eagle Junction station to the Domestic Airport due to an operational issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 11.28pm Central to Ipswich train has been cancelled at Roma Street station due to a medical emergency.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 2.01pm Central - Ipswich train service will run express from Milton - Darra station stopping only at Indooroopilly station due to an operational issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

verbatim9

#10823
Bridge strike on Ipswich line lengthy delays up to 40mins.
The bizarre thing is that the operator at Translink can't contact the QR control centre to know exactly what is going on and what time trains are to arrive. Even the station worker at Milton with a radio and phone couldn't tell us anything. No announcements (automated or manual) were made at Milton station indicating when a train would arrive. It was anyones guess. Then last minute they changed the platform from 2 to 4 and no one knew. So people were just left waiting again.

ozbob

Ipswich and Springfield line trains have resumed in both directions Corinda - Ipswich stations following an earlier bridge strike at Corinda. Customers can expect residual delays of up to 40 mins.
5.38pm
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Second day running ... :frs:

====

Ipswich and Springfield line trains are currently suspended in both directions between Taringa - Indooroopilly stations due to a bridge strike at Indooroopilly. Customers can expect delays of up to 30 mins.
1.24pm

====

Ipswich and Springfield line trains have resumed in both directions between Taringa - Indooroopilly stations following an earlier bridge strike at Indooroopilly. Customers can expect residual delays of 35 mins.
2.19pm
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 2.37pm Ipswich - Central train has been delayed 18 mins due to an earlier bridge strike.

====

The 3.05pm Caboolture - Central train has been delayed 23 mins due to an earlier bridge strike.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 6.55am Varsity Lakes to Central train has been cancelled due to a rollingstock issue.

====

Another NGR ' juvenile failure ' ?
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Uh ... oh ..

The 11.22am Central to Kippa-Ring train has been cancelled due to a rollingstock issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Beenleigh line trains travelling outbound will experience delays of up 10 minutes due to a track fault at Moorooka station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 5.23pm Central to Shorncliffe train will run express from Bowen Hills to Eagle Junction due to signalling fault.

====

The 5.45pm Roma Street to Gympie North train is delayed 20 minutes due to signalling issue caused by storm activity.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

It never ends ...

====

The 5.58am Doomben to Central train has been cancelled due to a a mechanical issue.

The next Doomben to Central train will depart Doomben station at 6.28am.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 1.34pm Domestic Airport to Varsity Lakes train is delayed 20 minutes due to a signal fault.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 3.59pm Shorncliffe to Manly train will run express from Northgate to Bowen Hills only stopping at Eagle Junction.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

UPDATE: Sunshine Coast line trains have resumed in both directions between Elimbah and Palmwoods stations following an earlier overhead power line issue.
10.56pm
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 4.29am Central to Varsity Lakes train is delayed 10 minutes due to a door fault.

====

NGR no doubt ...   ???
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz

https://twitter.com/TransLinkSEQ/status/1105592696448733184

https://www.facebook.com/TransLinkQLD/posts/3120827377943306

QuoteTranslink. What's up with the increase in 'now running express'. Getting very hard to catch the 7:31 Toombul to city train if it keeps bypassing us! That's a sizeable gap in service in peak hour.
22 min gap @ Nundah and Toombul if that service runs express.

response from translink

QuoteThank you for reaching out to us. I'm very sorry about the experience you've had this morning. We had not received any notification from Queensland Rail in regards to this but I can definitely raise this issue with them. If you are able to PM me your best contact details I will send this through for you

so according to the twitter post they 'were' notified by QR and the facebook post they 'weren't'....even though both responses were posted only a minute apart  :o

ozbob

There are some serious issues with the consistency, reliability and timeliness of service disruption and alterations reporting. The other day they even stopped reporting them for around 16 hours or so and it was only my questioning of why no reported disruptions did they admit there was an issue with ' tweeting '.

It's more third rate stuff that's now the hallmark of PT in SEQ sadly ...😵
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

The 11.35pm Central to Nambour train is delayed 11 minutes due to an incident requiring emergency services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳