• Welcome to RAIL - Back On Track Forum.
 

Reported service disruptions rail - no longer in use

Started by ozbob, February 09, 2009, 11:39:38 AM

Previous topic - Next topic

ozbob

^ it is this constant cancellation of services due to ' rollingstock issues ' is a real worry.  No doubt a NGR again (Goldie ) ..

Major track closure northern lines, would be particularly frustrating for punters doing the long haul ..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 9.40am Varsity Lakes to Central train has been cancelled from Varsity Lakes to Nerang due to an earlier rollingstock issue.

The next Varsity Lakes to Central train will depart Varsity Lakes Station at 10.10am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 11.31am Central to Ipswich train is delayed 10 minutes due to signalling fault. This train is now due to arrive at Ipswich station at 12.38pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 12.10pm Varsity Lakes to Bowen Hills train is delayed 18 minutes due to a track fault.
This train is now due to arrive at Bowen Hills station at 1.54pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 5.34am Kippa-Ring to Central train is delayed 17 minutes due to a rollingstock issue.
This train is now due to arrive at Roma Street station at 6.50am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 6.43am Central to Springfield Central train has been cancelled from Darra to Springfield Central due to an earlier rollingstock issue. The next Central to Springfield Central train will depart Central Station at 7.13am.

====

The 7.33am Springfield Central to Central train train has been cancelled from Springfield Central to Darra due to an earlier rollingstock issue.

:fp:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky


ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

techblitz

seems we aint the only ones copping this crap....

https://www.masstransitmag.com/rail/vehicles/news/21040357/nyc-transits-new-subway-cars-suffering-on-the-tracks-dozens-pulled-from-rails

QuoteDozens of cars built by Bombardier for the latest train model -- known as the R179, which now run on the J/Z and C lines -- were sidelined this week after suffering from different kinds of maladies, from door problems, propulsion issues and air compressors, sources told The News

https://www.nytimes.com/reuters/2019/02/11/business/11reuters-bombardier-swiss.html

QuoteSwiss Federal Railways (SBB) said on Monday that new Bombardier trains have yet to live up to expectations and that both companies were working to correct issues, including improving software and fixing problematic doors.
^ says that they received 3 free trains as compensation  :-w


ozbob

The 8.29am Central to Varsity Lakes train is delayed 13 minutes due to a signalling fault.
This train is now due to arrive at Varsity Lakes station at 10.05am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 9.04am Central to Beenleigh train is delayed 12 minutes due to a rollingstock issue.
This train is now due to arrive at Beenleigh station at 10.23am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

3.46pm Kippa-Ring to Central train is delayed 10 minutes due to a customer requiring medical assistance.
This train is now due to arrive at Central Station at 4.59pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Redcliffe Peninsula, Caboolture and Sunshine Coast line trains are suspended both directions at Sunshine station due to an incident requiring emergency services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Couriermail --> Major train delays on Brisbane's northside after pedestrian struck

QuoteA PERSON has been struck by a train on Brisbane's northside.

Queensland Ambulance Service said it had received reports about 4.40pm that a male had been hit by a train.

Two QAS crews were at the scene at Bilsen Rd, Geebung, assessing the person, along with police and fire officers.

Trains on the Redcliffe Peninsula, Caboolture and Sunshine Coast lines have been suspended in both directions at Sunshine station.

Queensland Rail has advised buses are being arranged to travel between the stations but have warned major delays are expected.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

UPDATE: Redcliffe Peninsula, Caboolture & Sunshine Coast line trains have resumed at slower speeds, following an earlier suspension at Sunshine station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

red dragin

Had to collect the wife from Deagon and drop her at Petrie to get her car.

From the updated version of thst article, sounds like impatience nearly ended in misfortune. Minor injuries for them, massive inconvenience for everyone else, all because they couldn't wait until the gates opened.

ozbob

Ipswich/Rosewood line trains are delayed up to 60 minutes inbound between Ipswich and Central stations due to an earlier incident requiring emergency services.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 11.17pm Central to Cleveland train is delayed 15 minutes due to a rollingstock issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 3.46am Kippa-Ring to Central train is delayed 10 minutes due to an overhead power line issue.

====

The 4.43am Central to Springfield Central train is delayed 10 minutes due to an overhead power line issue.

====

UPDATE: The 4.43am Central to Springfield Central train is delayed 10 minutes and will run express from Indooroopilly to Corinda due to an overhead power line issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Cleveland line trains travelling inbound will experience delays of up to 10 minutes due to a track fault at Lindum station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 11.17pm Central to Cleveland train is delayed 9 minutes due to heavy passenger loading.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 9.04am Central to Beenleigh train is delayed 25 minutes and will run express from Park Road to Coopers Plains due to a signal issue.

====

The 9.17am Central to Cleveland train is delayed 11 minutes due to a signal issue.

====

The 9.19am Central to Coopers Plains train is delayed 15 minutes due to a signal issue.

====

The 9.29am Central to Varsity Lakes train is delayed 10 minutes due to a signal issue.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 10.58am Central to Ipswich train is delayed 12 minutes due to a motor vehicle which has struck a rail bridge at Milton station.

This train is now due to arrive at Ipswich station at 12.08pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 5.18am Roma Street to Kippa-Ring train has been cancelled due to a rostering issue.

====

The 6.22am Kippa-Ring to Roma Street train has been cancelled due to a rostering issue.

====

The 5.40am Varsity Lakes to Central train has been cancelled from Robina to Roma Street due to train crew unwell.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

A lot of delayed services ...

Sunshine Coast line trains have resumed following a suspension in both directions between Eudlo and Landsborough station due to a motor vehicle which has struck the level crossing boom gate at Mooloolah station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

5.45pm Roma Street to Gympie North train is delayed 19 minutes due to a rollingstock issue. This train is now due to arrive at Gympie North Station at 8.56pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 6.25am Varsity Lakes to Central train has been cancelled from Varsity Lakes to Robina due to a rostering issue.

The next Varsity Lakes to Central train will depart Varsity Lakes Station at 6.32am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

3.39pm Shorncliffe to Central train is delayed 10 minutes due to congestion on the network. This train is now due to arrive at Central Station at 4.27pm.

====

3.51pm Roma Street to Kippa-Ring train has been cancelled due to a rollingstock issue. The next Roma Street to Kippa-Ring train will depart Roma Street Station at 4.27pm.

====

3.39pm Shorncliffe to Central train is delayed 10 minutes due to congestion on the network. This train is now due to arrive at Central Station at 4.27pm.

====

6.18pm Beenleigh to Central train is delayed 11 minutes due to a signal issue. This train is now due to arrive at Central Station at 7.37pm.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 5.43am Central to Shorncliffe train is delayed 10 minutes due to a signal issue.*

* there has been around 35 hours since the last service disruption notice ..  be good if this was the norm ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

 ???

Trains travelling outbound on all lines may experience delays of up to 10 minutes due to a signalling fault at Roma Street station.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 6.07am Ipswich to Central train is delayed 10 minutes due to a person reportedly trespassing in the corridor.
This train is now due to arrive at Central station at 7.17am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Ipswich and Springfield line trains are suspended both directions between Darra and Sherwood stations due to overhead powerline issue at Oxley station. Customers can expect delays of up to 30 minutes.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

^^

Ipswich and Springfield line trains have resumed running in both directions following an earlier overhead power line issue.
Customers can expect residual delays of up to 30 mins.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 7.24am Shorncliffe to Central train will run express from Eagle Junction to Bowen Hills due to a rostering issue.

The next Shorncliffe to Central train will depart Shorncliffe Station at 7.54am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

techblitz

this is getting a bit ridiculous with this still crap rail frequency @ sandgate etc....if you take a look at 7.05 - 8.05  which is a very busy peak period....you have the feeder routes 690/691 running at double the frequency of trains.

691 arr sandgate 7:10 am 7:25 am 7:41 am 7:55 am
690 arr sandgate 7:04 am 7:14 am 7:43 am 8:04 am

trains ex sandgate 7:24 am 7:54 am

https://www.facebook.com/QueenslandRail/posts/2417906304894382

QuoteCattle class service again. 3 stations in on the shorncliffe line and it's jam packed.

Pathetic. This is what happens when you can provide a service every 15 minutes.
Get it together and stop been so useless

ozbob

Terrible ...  peak OTR for the Shorncliffe line is slipping too ..
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

The 9.19am Central to Coopers Plains train is delayed 15 minutes due to a signal issue.

The train is now due to arrive at Coopers Plains Station at 10.04am.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

🡱 🡳