• Welcome to RAIL - Back On Track Forum.
 

Article: Peak train failure

Started by ozbob, December 16, 2008, 18:42:27 PM

Previous topic - Next topic

ozbob

From Brisbane mX 16th December 2008 page 1

Peak train failure



Performance has improved relative to 2007.  As more trains come online, there will be some reserve at peak.  The basic problem at the moment is that if there are issues with some units there is effectively no replacement during the peak.  Daughter number two reported hearing at the Valley that an Airtrain service had been cancelled about 4pm today.

The peak performance yesterday was:

PEAK TIME RESULTS
Monday 15/12/08 Trains on time 203 of 215 (94.4%)

http://www.citytrain.com.au/

This is a good overall result.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

PEAK TIME RESULTS
Tuesday 16/12/08 Trains on time 207 of 215 (96.2%)
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳