• Welcome to RAIL - Back On Track Forum.
 

Cycling through Ipswich Central

Started by ozbob, April 21, 2022, 08:23:40 AM

Previous topic - Next topic

ozbob

https://www.shapeyouripswich.com.au/cyclingthroughipswichcentral

Cycling through Ipswich Central
Help build a cycle network through Ipswich Central

Help us design the network
We would like your feedback on the Ipswich Inner CBD Cycle Network. Have your say by indicating your level of support for the project, and telling us what you think council should consider along the preferred route as we progress towards detailed design.

>> https://www.shapeyouripswich.com.au/cyclingthroughipswichcentral
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

verbatim9

This is a start. Ipswich CBD does require dedicated bikeways as well as further traffic calming measures. Brisbane Street would be ideal for urban renewal with wider footpaths and segregated cycling infrastructure.

ozbob

Ipswich First

https://www.ipswichfirst.com.au/work-on-crucial-inner-city-bikeway-link-begins/

Work on crucial inner city bikeway link begins

Construction on the next stage of the Eastern Ipswich Link Bikeway is set to begin in April, bringing further safe cycling routes to the city.

Growth, Infrastructure and Waste Committee Chair Mayor Teresa Harding said a shared bike path will be installed along the Queen Victoria Park service road, between the five-ways intersection and the start of Limestone Street.

"This project is part of council's iGO Active Transport Action Plan network, providing better connections for cyclists, pedestrians and active travellers throughout Ipswich," Mayor Harding said.

"This is about continuing to develop more ways for residents to move about our city safely." ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳