Terms of use Privacy About us Media Contact

Author Topic: Monthly line specific on-time running and reliability April 2021  (Read 469 times)

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 100955
    • RAIL Back On Track







Spreadsheet --> https://backontrack.org/docs/qr/monthly_otr/2021/apr/otrapr21.ods
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 100955
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability April 2021
« Reply #1 on: June 10, 2021, 01:45:49 PM »
Individual lines

Spreadsheet: https://backontrack.org/docs/qr/monthly_otr/2021/apr/all_lines_monthly_apr19toapr21.ods


























Combining the Queensland Rail total (aggregate) results on the same axes allows a better appreciation of what is happening.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 100955
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability April 2021
« Reply #2 on: June 10, 2021, 01:55:23 PM »
Spreadsheet --> https://backontrack.org/docs/qr/monthly_otr/2021/apr/QRsummary_apr2019_apr2021.ods









Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 100955
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability April 2021
« Reply #3 on: June 10, 2021, 02:18:32 PM »
^ Improved OTR for April 2021.

There was a pax drop off (Easter and a 3 day lockdown) and less peak running days in April.  Still, a lot better.

« Last Edit: June 10, 2021, 03:42:05 PM by ozbob »
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 100955
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability April 2021
« Reply #4 on: June 11, 2021, 12:42:12 AM »
Sent to all outlets:

Update on on-time running performance for Queensland Rail Citytrain Month of April 2021

11th June 2021

Greetings,

Citytrain services, including peak and off-peak, are measured as on-time when they arrive within three minutes and 59 seconds of their scheduled time, except for the interurban services viz. Gold Coast, Rosewood and Sunshine Coast which are measured as on time if they arrive within 5 minutes and 59 seconds.

Target is services > 95% on time
FMA = force majeure adjusted
CI = customer impact (what passengers actually experience)
CP = combined peaks

The on-time running (OTR) data is published on or about the 10th each month for the month preceding the last month at https://www.queenslandrail.com.au/aboutus/ourperformance/service-punctuality-and-reliability
This means it is in effect about six weeks behind. Be better and more timely if this could be reduced to around two weeks as for other jurisdictions.

OTR for April 2021 was much improved and overall OTR was better than 95%. Well done and thank you.



There was a slight patronage decline during the April reporting period due to the 3 day lockdown at the end of March 2021 and Easter 2021.

Reference at the RAIL Back On Track forum > https://railbotforum.org/mbs/index.php?topic=14303.0 where detailed analyses of all individual lines are available.

Best wishes,
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track https://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 100955
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability April 2021
« Reply #5 on: June 11, 2021, 12:48:36 AM »
Facebook ...

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 100955
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability April 2021
« Reply #6 on: June 11, 2021, 12:52:40 AM »
https://twitter.com/railbotforum/status/1403002101064560643
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 


“You can't understand a city without using its public transportation system.” -- Erol Ozan