BrizCommuter:

QuoteSalisbury to Dutton Park 3 track limitations - the Achilles heel of Cross River Rail, means that up to 24tph contra-peak services will have to fit on one track, this will slow down contra-peak express services, and also prevents contra-peak services to/from the Gold Coast/Beenleigh Line (and eventually Salisbury-Beaudesert Line) corridor travelling via South Bank (in normal operation).

    Capacity required for Salisbury to Beaudesert Line - this proposed line will require at least 6tph train paths in the peak. Due to the Salisbury to Dutton Park 3 track limitation, this will eat into the capacity available for the Gold Coast/Beenleigh Lines.

    Beenleigh Line track capacity limitations - whilst the proposed 3rd track at Loganlea may allow for a significant increase in Gold Coast Line services, it may also curtail the Beenleigh Line to Loganlea. This means that the Gold Coast Line may need 2 tiers of services - express and semi-express, and possibly additional turnback capacity. Gold Coast Line commuters need to be informed as to what will happen to their train services!
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Cutting back the original plan for the tunnel to go through to Yeerongpilly back to Dutton Park has seriously compromised the current project.

It is a farce!

Not only the capacity issues, loss of a freight only train path, and less than desirable sub-optimal arrangements at Dutton Park.
Half baked projects, have long term consequences ...