Greetings,
Overall on-time running (otr) is good, but the Caboolture and Sunshine Coast lines otr performance is poor.
The otr graphs for these lines are below.
The otr data is published on or about the 10th each month for the month preceding the last month at
https://www.queenslandrail.com.au/aboutus/ourperformance/service-punctuality-and-reliability. We then do further analysis of the data.
It would be good if this delay in reporting the data could be reduced from around six weeks to two weeks as for other jurisdictions.
All services, including peak and off-peak, are measured as on-time when they arrive within three minutes and 59 seconds of their scheduled time, or 5 minutes and 59 seconds on interurban services viz. Gold Coast, Rosewood and Sunshine Coast.
Target is services > 95% on time.
FMA = force majeure adjusted
CI = customer impact (what passengers actually experience)
CP = combined peaks
Reference at the RBoT forum >
https://railbotforum.org/mbs/index.php?topic=14176.0 where detailed analyses of all individual lines is available.
Best wishes,
Robert
Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track
https://backontrack.orgGraphs attached:
On-time running performance for all lines combined
Caboolture line on-time running
Sunshine Coast line on-time running