ozbob

Welcome to a new year!
1st January 2021
https://www.facebook.com/RAILBackOnTrack/posts/4114037505277072
489 People reached 99 Engagements

====

TransLink public transport performance data snapshot for November 2020
11th January 2021
https://www.facebook.com/RAILBackOnTrack/posts/4142349525779203
287 People reached 14 Engagements

====

Update on on-time running performance for Citytrain Queensland Rail Month of November 2020
12th January 2021
https://www.facebook.com/RAILBackOnTrack/posts/4144102855603870
257 People reached 23 Engagements

====

Citytrain Response Unit finished?
13th January 2021
https://www.facebook.com/RAILBackOnTrack/posts/4146765602004262
450 People reached 33 Engagements

====

SEQ Bus on-time running updated
14th January 2021
https://www.facebook.com/RAILBackOnTrack/posts/4150350758312413
283 People reached 29 Engagements

====

Brisbane's trolley buses
17th January 2021
https://www.facebook.com/RAILBackOnTrack/posts/4157962040884618
825 People reached 207 Engagements

====

Victoria Bridge Brisbane
21st January 2021
https://www.facebook.com/RAILBackOnTrack/posts/4169388639741958
575 People reached 91 Engagements

====

The first Springfield station in Brisbane - Belmont Shire Tramway
25th January 2021
https://www.facebook.com/RAILBackOnTrack/posts/4182883291725826
671 People reached 112 Engagements

====

Update - reported lift outages on the SEQ TransLink network
1st February 2021
https://www.facebook.com/RAILBackOnTrack/posts/4201967523150736
302 People reached 32 Engagements

====

Bridge strikes are a very serious issue - action needed!
9th February 2021
https://www.facebook.com/RAILBackOnTrack/posts/4223655284315293
193 People reached 11 Engagements
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

#1
TransLink public transport performance data snapshot for December 2020
11th February 2021
https://www.facebook.com/RAILBackOnTrack/posts/4229046887109466
283 People reached 21 Engagements

====

Update on on-time running performance for Citytrain Queensland Rail Month of December 2020
12th February 2021
https://www.facebook.com/RAILBackOnTrack/posts/4231959420151546
241 People reached 14 Engagements

====

Roma Street CRR PDA - Proposed Development Scheme and Draft Development Charges and Offset Plan
18th February 2021
https://www.facebook.com/RAILBackOnTrack/posts/4248517541829067
441 People reached 95 Engagements

====

Yeronga station closing for approximately six months
19th February 2021
https://www.facebook.com/RAILBackOnTrack/posts/4251641818183306
779 People reached 224 Engagements

====

Quarterly patronage update TransLink SEQ
24th February 2021
https://www.facebook.com/RAILBackOnTrack/posts/4265239046823583
396 People reached 46 Engagements

====

SEQ Bus on-time running updated
25th February 2021
https://www.facebook.com/RAILBackOnTrack/posts/4268764926470995
258 People reached 8 Engagements

====

Lindum Level Crossing Removal Delays just don't add up
2nd March 2021
https://www.facebook.com/RAILBackOnTrack/posts/4288516091162545
463 People reached 87 Engagements

====

TransLink public transport performance data snapshot for January 2021
12th March 2021
https://www.facebook.com/RAILBackOnTrack/posts/4315864831761004
257 People reached 31 Engagements

====

Update on on-time running performance for Citytrain Queensland Rail Month of January 2021
12th March 2021
https://www.facebook.com/RAILBackOnTrack/posts/4316340048380149
240 People reached 21 Engagements

====

The Roma St Priority Development Area - Roma Street for Bus and Rail first!
22nd March 2021
https://www.facebook.com/RAILBackOnTrack/posts/4345003625513791
433 People reached 62 Engagements

====

DDA upgrade of first NGR (735) now complete
29th March 2021
https://www.facebook.com/RAILBackOnTrack/posts/4364920620188758
540 People reached 258 Engagements

====

'World-Class Second Sunshine Coast Motorway Project'
1st April 2021
https://www.facebook.com/RAILBackOnTrack/posts/4376213965726090
583 People reached 107 Engagement
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

#2
Time to Publicly Release the Cross River Rail Service Plans!
5th April 2021
https://www.facebook.com/RAILBackOnTrack/posts/4390328824314604
430 People reached 84 Engagements

====

Cross River Rail has some serious flaws
8th April 2021
https://www.facebook.com/RAILBackOnTrack/posts/4400519196628900
726 People reached 180 Engagements

====

TransLink public transport performance data snapshot for February 2021
11th April 2021
https://www.facebook.com/RAILBackOnTrack/posts/4408950092452477
251 People reached 24 Engagements

====

Update on on-time running performance for Citytrain Queensland Rail Month of February 2021
11th April 2021
https://www.facebook.com/RAILBackOnTrack/posts/4409354635745356
253 People reached 17 Engagements

====

Citytrain rollingstock shortage - 3 car services in peak
13th April 2021
https://www.facebook.com/RAILBackOnTrack/posts/4415260268488126
763 People reached 168 Engagements

====

Possible SEQ Citytrain Network 2025 after Cross River Rail is commissioned
27th April 2021
https://www.facebook.com/RAILBackOnTrack/posts/4456720941008725
915 People reached 406 Engagements

====

Lift outages on the SEQ TransLink Network
2nd May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4471356356211850
257 People reached 28 Engagements

====

Improving rail services between Gympie and Nambour a priority
7th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4486245424722943
693 People reached 103 Engagements

====

Cross River Rail - Project change application April 2021 – Clapham Yard, Moorooka
8th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4489636067717212
517 People reached 158 Engagements

====

The saga of the Sunshine Coast line continues in paradise ...
11th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4499495336731285
926 People reached 138 Engagements
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

#3
Update on on-time running performance for Citytrain Queensland Rail Month of March 2021
14th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4508373492510136
241 People reached 10 Engagements

====

TransLink public transport performance data snapshot for March 2021
14th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4508876762459809
397 People reached 52 Engagements

====

Time for the Cleveland line to be sorted ...
15th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4512031252144360
2,855 People reached 133 Engagements



====

Where are the rail service plans?
19th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4524302014250617
671 People reached 119 Engagements

====

Cross River Rail - Not "More Trains, More Often"
24th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4541272989220186
873 People reached 172 Engagements

====

The Ferny Grove Heritage Railway
28th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4555922497755235
585 People reached 85 Engagements

====

Citizens Inquiry into Operational Deficiencies with CRR
28th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4556546454359506
417 People reached 89 Engagements

====

Four free Gold go cards and bikes and scooters on peak train services - comments
30th May 2021
https://www.facebook.com/RAILBackOnTrack/posts/4562787757068709
546 People reached 101 Engagements

====

TransLink Reported Lift Outages on the increase ...
1st June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4570356239645194
380 People reached 33 Engagements

====

Citytrain Response Unit Final Report
3rd June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4575722989108519
Interim 445 People reached 83 Engagements9
====

Citizens Inquiry into Operational Deficiencies with CRR
Update 5th June 2021

https://www.facebook.com/RAILBackOnTrack/posts/4581975618483256
Interim 741 People reached 115 Engagements
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

#4
BrizCommuter: New Trains, but Not Enough
5th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4583331351681016
795 People reached 181 engagements

====

CRR Inquiry: Example of feedback received
8th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4590426970971454
488 People reached 72 Engagements

====

Update on on-time running performance for Queensland Rail Citytrain Month of April 2021
11th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4599412626739555
265 People reached 19 Engagements

====

TransLink public transport performance data snapshot for April 2021
12th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4602690509745100
296 People reached 17 Engagements

====

BrizCommuter: Brisbane 2032 Olympics - More Public Transport Required
12th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4604043662943118
9,275 People reached 2,046 Engagements



====

Citizens Inquiry into Operational Deficiencies with CRR
Update 13th June 2021

https://www.facebook.com/RAILBackOnTrack/posts/4605669619447189
504 People reached 41 Engagements

====

Queensland Budget 2021-22 - public transport
16th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4613906928623458
498 People reached 74 Engagements

====

Rollingstock expansion program - update
17th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4616256451721839
350 People reached 116 Engagements

====

Quarterly patronage update TransLink SEQ Q3 2020-21
19th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4622262791121205
403 People reached 53 Engagements
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

#5
SEQ Bus on-time running updated for Q3 2020-21
https://www.facebook.com/RAILBackOnTrack/posts/4624632230884261
20th June 2021
259 People reached 13 Engagements

====

Citizens Inquiry into Operational Deficiencies with CRR
Update 20th June 2021
** Show us the money, NOT! 
or ... why the Federal Government is not supporting Cross River Rail **

https://www.facebook.com/RAILBackOnTrack/posts/4625498694130948
526 People reached 86 Engagements

====

Level crossing removal still stagnated in Queensland
25th June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4640232269324257
377 People reached 85 Engagements

====

TransLink Reported Lift Outages for June 2021
https://www.facebook.com/RAILBackOnTrack/posts/4657704864243664
1st July 2021
254 People reached 21 Engagements

====

Citizens Inquiry into Operational Deficiencies with CRR
Update: 4th July 2021
Cross River Rail Delivery Board - effective?

https://www.facebook.com/RAILBackOnTrack/posts/4666431760037641
4th July 2021
456 People reached 60 Engagements

====

TransLink public transport performance data snapshot for May 2021
13th July 2021
https://www.facebook.com/RAILBackOnTrack/posts/4693002500713900
230 People reached 23 Engagements

====

Update on on-time running performance for Queensland Rail Citytrain Month of May 2021
14th July 2021
https://www.facebook.com/RAILBackOnTrack/posts/4695531797127637
312 People reached 20 Engagements

====

Let the Games begin !
22nd July 2021
https://www.facebook.com/RAILBackOnTrack/posts/4718938104787006
645 People reached 81 Engagements
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

#6
TransLink Reported Lift Outages for July 2021
2nd August 2021
https://www.facebook.com/RAILBackOnTrack/posts/4753542841326532
317 People reached 12 Engagements

====

Creating Better Connections for Queenslanders
11th August 2021
https://www.facebook.com/RAILBackOnTrack/posts/4782174118463404
356 People reached 43 Engagements

====

TransLink public transport performance data snapshot for June 2021
13th August 2021
https://www.facebook.com/RAILBackOnTrack/posts/4787626121251537
344 People reached 27 Engagements

====

Update on on-time running performance for Queensland Rail Citytrain Month of June 2021
14th August 2021
https://www.facebook.com/RAILBackOnTrack/posts/4790224390991710
326 People reached 15 Engagements

====

TransLink Reported Lift Outages for August 2021
1st September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4847103428637139
221 People reached 6 Engagements

====

Government Statement:
Logan-Gold Coast rail plan for faster, more frequent trains

3rd September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4855028141178001
716 People reached 185 Engagements

====

Logan and Gold Coast Faster Rail proposal welcome!
4th September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4857154827631999
1,872 People reached 423 Engagements



====

Community consultations underway
6th September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4863827053631443
866 People reached 73 Engagements

====

Who else just does this? (Free WiFi on Citytrain)
9th September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4873607899320025
552 People reached 176 Engagements

====

Quarterly patronage update TransLink SEQ Q4 2020-21
10th September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4876356102378538
285 People reached 15 Engagements

====

TransLink public transport performance data snapshot for July 2021
11th September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4880412841972864
286 People reached 12 Engagements

====

Update on on-time running performance for Queensland Rail Citytrain Month of July 2021
12th September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4882306681783480
314 People reached 20 Engagements
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

#7
SEQ Bus on-time running updated for Q4 2020-21
13th September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4886085361405612
241 People reached 6 Engagements

====

Logan and Gold Coast Faster Rail project - what do you think of these suggestions?
23rd September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4920117228002425
1,184 People reached 273 Engagements



====

Need for Speed on Logan & Gold Coast Faster Rail project
26th September 2021
https://www.facebook.com/RAILBackOnTrack/posts/4929595327054615
1,098 People reached 263 Engagements



====

TransLink Reported Lift Outages updated for September 2021
1st October 2021
https://www.facebook.com/RAILBackOnTrack/posts/4947141025300045
262 People reached 2 Engagements

====

SEQ Annual Patronage update for financial year (FY) 2020/21
4th October 2021
https://www.facebook.com/RAILBackOnTrack/posts/4956982234315924
352 People reached 18 Engagements

====

TransLink public transport performance data snapshot for August 2021
12th October 2021
https://www.facebook.com/RAILBackOnTrack/posts/4982935675053913
403 People reached 17 Engagements

====

Update on on-time running performance for Queensland Rail Citytrain Month of August 2021
https://www.facebook.com/RAILBackOnTrack/posts/4985385564808924
13th October 2021
256 People reached 6 Engagements

====

Inland Rail
14th October 2021
https://www.facebook.com/RAILBackOnTrack/posts/4989245267756287
1,380 People reached 275 Engagements



====

Rollingstock expansion program - now 65 six car trains
20th October 2021
https://www.facebook.com/RAILBackOnTrack/posts/5009768289037318
646 People reached 98 Engagements

====

Traveston station readers
25th October 2021
https://www.facebook.com/RAILBackOnTrack/posts/5025223837491763
925 People reached 196 Engagements

====

TransLink Reported Lift Outages updated for October 2021
1st November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5047936948553785
281 People reached 6 Engagements

====

TransLink public transport performance data snapshot for September 2021
11th November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5080934465254033
356 People reached 24 Engagements

====

Fast Rail for SEQ
11th November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5081503601863786
1,458 People reached 305 Engagements



====

Media release: Fast Rail, a must do for SEQ
11th November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5081633255184154
823 People reached 130 Engagements

====

Update on on-time running performance for Queensland Rail Citytrain Month of September 2021
12th November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5083984361615710
230 People reached 4 Engagements

====

The state capital with the worst public transport?
13th November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5087668391247307
942 People reached 276 Engagements
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

#8
A Fast Rail vision for SEQ
15th November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5094145417266271
4,127 People reached 1,069 Engagements



====

Governments and DTMR Completely Out of Touch with North Brisbane Bruce Highway Western Alternative
17th November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5100491323298347
942 People reached 123 Engagements

====

Half of Council of Mayors' (SEQ) Olympic Projects Guarantee More Congestion
22nd November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5117247011622778
4,291 People reached 762 Engagements



====

Well done Victoria. Since 2015 Fifty four (54) level crossings gone!
22nd November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5118123324868480
640 People reached 60 Engagements

====

Advancement on the CAMCOS project welcomed
23rd November 2021
https://www.facebook.com/RAILBackOnTrack/posts/5120604777953668
1,416 People reached 335 Engagements



====

TransLink Reported Lift Outages updated for November 2021
1st December 2021
https://www.facebook.com/RAILBackOnTrack/posts/5147816021899210
219 People reached 11 Engagements

====

Missed Opportunity to Address Housing Affordability and the Cost of Living
2nd December 2021
https://www.facebook.com/RAILBackOnTrack/posts/5150653524948793
1,711 People reached 234 Engagements



====

TransLink PT performance dashboard updated for Quarter 1 Financial Year 2021-22
https://www.facebook.com/RAILBackOnTrack/posts/5159073054106840
4th December 2021
277 People reached 11 Engagements

====

Queensland Rail farewells CEO Nick Easy
https://www.facebook.com/RAILBackOnTrack/posts/5178997845447694
9th December 2021
619 People reached 145 Engagements

====

Awards to recognise Queensland's top bus drivers
https://www.facebook.com/RAILBackOnTrack/posts/5180186131995532
10th December 2021
157 People reached 8 Engagements

====

Update on on-time running performance for Queensland Rail Citytrain Month of October 2021
https://www.facebook.com/RAILBackOnTrack/posts/5185624464785032
12th December 2021
211 People reached 3 Engagements


====

TransLink public transport performance data snapshot for October 2021
https://www.facebook.com/RAILBackOnTrack/posts/5198657736815038
16th December 2021
272 People reached 15 Engagements

====

Queensland:  Thanks to all involved with public transport for their efforts in 2021!
https://www.facebook.com/RAILBackOnTrack/posts/5224693464211465
21st December 2021
366 People reached 33 Engagements
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

🡱 🡳