Terms of use Privacy About us Media Contact

Author Topic: Monthly line specific on-time running and reliability June 2020  (Read 416 times)

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
June 2020 performance data now published: https://www.queenslandrail.com.au/aboutus/ourperformance/service-punctuality-and-reliability






Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability June 2020
« Reply #1 on: August 10, 2020, 02:34:44 PM »
Individual lines

Spreadsheet: https://backontrack.org/docs/qr/monthly_otr/2020/may/all_lines_monthly_apr19tojun20.ods























Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability June 2020
« Reply #2 on: August 10, 2020, 02:50:17 PM »








Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability June 2020
« Reply #3 on: August 10, 2020, 02:52:41 PM »
Combining the Queensland Rail total (aggregate) results on the same axes allows a better appreciation of what is happening.

Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability June 2020
« Reply #4 on: August 11, 2020, 05:12:49 AM »
https://twitter.com/railbotforum/status/1292901635719491584
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability June 2020
« Reply #5 on: August 12, 2020, 08:32:45 AM »
Updated for June 2020

Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability June 2020
« Reply #6 on: August 12, 2020, 08:34:50 AM »
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Monthly line specific on-time running and reliability June 2020
« Reply #7 on: August 12, 2020, 01:04:49 PM »
Sent to all outlets:

Update on on-time running performance for Citytrain Queensland Rail Month of June 2020

12th August 2020

Passenger numbers dropped significantly during April as COVID-19 restrictions came into effect but recovery in passenger numbers has begun (see graph below).

On-time running performance improved dramatically as passenger numbers fell. April 2020 was the best monthly performance we have seen and excellent OTR has continued for June 2020 (see graph below).

Dwell times when passenger loading is heavy slows trains.

All lines are very good to excellent.

Data is from Queensland Rail at https://www.queenslandrail.com.au/aboutus/ourperformance/service-punctuality-and-reliability
All services, including peak and off-peak, are measured as on-time when they arrive within three minutes and 59 seconds of their scheduled time, or 5 minutes and 59 seconds on interurban services - Gold Coast, Rosewood and Sunshine Coast. Target is > 95%.

FMA = force majeure adjusted
CI = customer impact (what passengers actually experience)
CP = combined peaks
QR aggregate



Reference at the RBoT forum at https://railbotforum.org/mbs/index.php?topic=13976.0 where detailed analyses of all lines is available.

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track https://backontrack.org


Data is from TransLink Monthly Performance Snapshots

Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 


“You can't understand a city without using its public transportation system.” -- Erol Ozan