Queensland Rail Citytrain on-time running performance update

Data has now been published for all lines for February 2020. Ten months (April 2019  > February 2020) of the specific all line on-time running (OTR) and reliability data has now been published and useful comparative analysis can be done.

Data source: https://www.queenslandrail.com.au/aboutus/ourperformance/service-punctuality-and-reliability select ' Monthly on-time running '

All services, including peak and off-peak, are measured as on-time when they arrive within three minutes and 59 seconds of their scheduled time, or 5 minutes and 59 seconds on interurban services - Gold Coast, Rosewood and Sunshine Coast. Target is > 95%.

FMA = force majeure adjusted
CI = customer impact (what passengers actually experience)
CP = combined peaks

Summary graphs and graphs of each individual line's on-time running performance can be found at

> https://railbotforum.org/mbs/index.php?topic=13899.0 on the RAIL Back On Track forum.

February 2020 was a poor month overall for Queensland Rail Citytrain in terms of meeting on-time running targets, notwithstanding the infrastructure constraints (single line sections Manly <> Cleveland, and north of Beerburrum on the Sunshine Coast line). Peak performance was particularly poor.  Our monitoring of reported rail service disruptions suggests that train faults, and the subsequent flow on effects are impacting on performance.

February was the last month before impacts due to COVID-19 and altered travel patterns.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

Combining the Queensland Rail total (aggregate) results on the same axes allows a better appreciation of what is happening.



OTR performance has dropped off during January and February 2020.  This corresponds with an increase in reported train faults.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳