On time train performance - May 2019
« on: May 03, 2019, 08:56:31 AM »
https://www.queenslandrail.com.au/forcustomers/otr/dailyotr

"The data presented below is for the morning and afternoon peak periods over the past five days.

The information provided is correct at the time of posting. However, as further information about the causes of any delay are collated the data may change, particularly to reflect differences between force majeure and non force majeure incidents.

From January 2019, any NGR technical faults which impact Queensland Rail’s on-time running or reliability will not be considered force majeure in the below data. "

Combined Peaks
Customer Impact, Force Majeure adjusted

1 May      92.12%     96.58%
2 May      92.12%     92.12%
3 May      95.20%     95.20%

7 May      80.82%     88.01%
8 May      93.84%     94.18%
9 May      96.58%     96.58%
10 May    92.62%     93.36%

13 May    89.73%     91.10%
14 May    93.84%     93.84%
15 May    91.10%     92.47%
16 May    93.84%     95.21%
17 May    84.87%     95.20%

20 May    93.60%     96.30%
21 May    97.64%     97.64%
22 May    94.28%     94.28%
23 May    99.33%     99.33%
24 May    85.20%     87.00%

27 May    86.20%     88.22%
28 May    91.25%     91.92%
29 May    86.87%     90.24%
30 May    89.56%     89.56%
31 May    84.48%     89.53%



Spreadsheet: https://backontrack.org/docs/qr/monthly_otr/2019/otpMay19/qrotpMay19.ods

« Last Edit: June 04, 2019, 02:49:12 PM by ozbob »
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: On time train performance - May 2019
« Reply #1 on: May 19, 2019, 10:55:54 AM »
Halfway through May, 8 out 12 lines < 95% FMA.  Not looking too good at this point (up to 16th May).  Still time for a recovery ...  :hc
« Last Edit: May 22, 2019, 10:34:40 AM by ozbob »
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: On time train performance - May 2019
« Reply #2 on: June 04, 2019, 02:52:21 PM »
Month complete.  7 out of 12 lines < 95% combined peaks FMA.



Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Offline achiruel

  • Member
  • *****
  • Posts: 889
Re: On time train performance - May 2019
« Reply #3 on: June 04, 2019, 02:55:36 PM »
Would be interesting to see Gympie North services. Currently around 50% or worse, I reckon.

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: On time train performance - May 2019
« Reply #4 on: June 04, 2019, 04:42:41 PM »
https://twitter.com/railbotforum/status/1135793300449841155

https://twitter.com/ozbob13/status/1135798353931849728
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 


“You can't understand a city without using its public transportation system.” -- Erol Ozan