Combined Peak OTR summaries
« on: October 26, 2018, 01:17:51 PM »
Updated for December <> January 2018

Note the contractual metric does not reflect the impact of delays due to NGR faults, other train delays due to faults are,  e.g. SMU and IMU. 

It is therefore not a correct representation of the overall network performance.  It would be lower if these were included.

See > https://railbotforum.org/mbs/index.php?topic=13378.0 for more background.





Discussion > https://railbotforum.org/mbs/index.php?topic=13328.0
« Last Edit: January 12, 2019, 06:20:29 AM by ozbob »
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Combined Peak OTR summaries
« Reply #1 on: December 04, 2018, 05:51:36 AM »
« Last Edit: January 12, 2019, 05:35:57 AM by ozbob »
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Combined Peak OTR summaries
« Reply #2 on: June 04, 2019, 03:00:06 PM »
Please note that as from 1st January 2019 Queensland Rail has changed the OTR data they are publishing daily. The contractual metric is no longer being published but is now changed to a ' force majeure adjusted ' metric.

" From January 2019, any NGR technical faults which impact Queensland Rail’s on-time running or reliability will not be considered force majeure in the below data. " https://www.queenslandrail.com.au/aboutus/ourperformance/service-punctuality-and-reliability

The new force majeure adjusted metric is the old contractual metric with NGR technical failures which impact on ontime running no longer considered as force majeure.

This gives a much better true representation of performance with only real force majeure events taken into account.


Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Combined Peak OTR summaries
« Reply #3 on: June 04, 2019, 03:10:30 PM »


Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 94714
    • RAIL Back On Track
Re: Combined Peak OTR summaries
« Reply #4 on: June 05, 2019, 11:15:16 AM »
Lines sorted, worst to best % OTR

Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 


“You can't understand a city without using its public transportation system.” -- Erol Ozan