Bridge strikes

Started by ozbob, October 17, 2015, 03:37:55 AM

Previous topic - Next topic

ozbob

Sent to all outlets:

23rd December 2015

Bridge strikes ... continue ...

Greetings,

Yet another bridge strike this morning ( http://railbotforum.org/mbs/index.php?topic=1862.msg166018#msg166018 ). Christmas clowns are out and about.  How much longer before there is some real action to get this extremely dangerous and transport network disruptive idiocy under some sort of control?

This what needs to happen, and happen fast in our opinion.

1.  First offence, 3-6 months automatic licence suspension with fine, and cost recovery. 2nd life with cost recovery.  This might focus some minds.

2.  Education campaigns,  bridge protection  and warnings in all its guises, transport company be responsible for ensuring drivers have safe routes as well as the driver acknowledging their height and loads, and documented route selection. The placement of more protective beams will stop strikes on actual bridge structures themselves, but vehicle operators still manage to drive into them with chaos following.  Repetitive bridge strikes might well weaken structures to a point of unpredictable collapse.

3.  In cab warning devices if all else fails -  alarm, preferably a loud klaxon sounds in cab if truck approaches a low level bridge, be it rail over road, or road over road, pedestrian over road.

Ho ho ho!

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Robert Dow ‏@Robert_Dow 1m

Latest: ' Bridge strikes continue ... '

> http://railbotforum.org/mbs/index.php?topic=11725.msg166020#msg166020 ... #qldpol

@StirlHinchliffe @MarkBaileyMP @TMRQld

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

#42
^ Been booked for an interview on 4BC Drive with Chris Adams around 3.20pm or so ..

2014/15  52 bridge strikes

2013/14  56 bridge strikes

Fines presently up to $8,800.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Idiots everywhere!!

===============

Twitter

The Age Verified account ‏@theage 10.57am

Another day, another bridge hit: Truck flips on City Road #MelbTraffic #roadsafety http://bit.ly/1PjihRZ 

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

 :fp:

======================

Twitter

The Age Photography Verified account ‏@theage_photo  11.19am

Oops. #Coles #truck stuck under city rd bridge

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on December 23, 2015, 11:04:30 AM
^ Been booked for an interview on 4BC Drive with Chris Adams around 3.20pm or so ..

2014/15  52 bridge strikes

2013/14  56 bridge strikes

Fines presently up to $8,800.

Thanks Chris and 4BC for the opportunity to raise the issues.

Hopefully a campaign to stop bridge strikes will be implemented.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

#47
Twitter

Felicity Caldwell ‏@fel_caldwell 59s

Truck hits protection beam at notorious rail overpass, where a cyclist was killed in 2013. http://bit.ly/1NjHBTI 



=================

^ beam does its job.   Still potential risks to bystanders and other road users should vehicle/load topple though.

For more on this bridge and the protection beams > Bridge protection - Dutton Park Annerley Road rail over road bridges
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

hU0N

Quote from: ozbob on January 20, 2016, 17:24:44 PM
Still potential risks to bystanders and other road users should vehicle/load topple though.

The beam significantly reduces the risk of toppling also.  The angle of the bridge pushes the truck load towards the footpath in the event of a bridge strike.  The protection beams are set square on to the direction of travel, so in the even of a strike, the load is compressed backwards into itself, which is relatively speaking, safer.

#Metro

Quote
The beam significantly reduces the risk of toppling also.  The angle of the bridge pushes the truck load towards the footpath in the event of a bridge strike.  The protection beams are set square on to the direction of travel, so in the even of a strike, the load is compressed backwards into itself, which is relatively speaking, safer.

I don't think there is any safe way to have a load fall off.
If it falls off towards a path, it could kill a pedestrian or cyclist. If it falls backwards it could crush the front of a car, crush the driver in the vehicle behind.
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

Yes, placement of beams does help for sure hU0N, particularly when bridges are at angles.

However, the point is there is still a risk to by standers and other road users.  We have seen beam strikes result in topples.

I do not want a situation where people think beam strikes are OK.  They are not, and just more signs that further actions are needed as we have outlined many times.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

The problem still exists,  it just doesn't shut down the track as well.

Looks like a rubbish compactor. Those guys are normally pretty good drivers considering the places they have to squeeze those trucks into.

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Strike - road on road ...

=============

Twitter

Philip Calder ‏@philipjcalder 15m15 minutes ago

Delays at Aussie World underpass at #Palmview, excavator knocked off back of truck. @WINNews_SCoast

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Price St Nambour rail bridge protection nears completion.. Back Woombye Rd to follow. NambourWeekly p7

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

3AW Melbourne ‏@3AW693 5m

The train network has been affected by the rolled truck under Flinders St bridge. Traffic remains rough.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Queensland Rail is continuing the fight against bridge strikes

After almost three months of preparation works, our crews, with the help of a 25 tonne crane, lifted these steel protection beams into place on the Price Street bridge at Nambour. This is part of our bridge strike protection program which helps to prevent over-height vehicles from colliding with rail bridges. The installation at Nambour has been completed and crews will now move to Woombye Road for the next stage of the program.

Not only can these incidents result in costly damage and frustrating delays for road and rail users, but they can also be extremely dangerous.

Pics > https://www.facebook.com/QueenslandRail/posts/1130285273656498

============

Hope to have a look on Thursday.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Uh oh ...

==============

Twitter

Queensland Rail ‏@QueenslandRail 1m

Due to a report of a bridge strike at Oxford Park, trains are suspended in both directions Ferny Grove-Mitchelton. Expect 30 min delays.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Alan Davies ‏@MelbUrbanist 6m

Just blogged by The Urbanist - Will ever-bigger fines stop trucks from smashing into rail bridges?

http://blogs.crikey.com.au/theurbanist/2016/02/03/will-ever-bigger-fines-stop-trucks-smashing-into-rail-bridges/ ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

MyTranslink displaying a bridge strike at Woombye-Palmwoods Road, trains currently suspended.

ozbob

Quote from: red dragin on February 03, 2016, 13:05:19 PM
MyTranslink displaying a bridge strike at Woombye-Palmwoods Road, trains currently suspended.

Yes. second strike today...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Building over road strike ..  no end to it is there?  Lack of action by Government.

===============

Twitter

News Talk 4BC 1116  ‏@NewsTalk4BC

A truck is wedged under the Mater Hospital overpass near the Raymond Terrace entry. Delays expected.

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

Quote from: ozbob on February 10, 2016, 10:00:32 AM
Building over road strike ..  no end to it is there?  Lack of action by Government.

Ironically struck by pieces of a building - those are concrete tilt slabs for walls.

ozbob

Oh dear.  Hope all survive this strike ...

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

ABC Radio Melbourne ‏@774melbourne 13 minutes ago

The Montague St bridge has been hit at least 95 times in the last 6-years. - Bryan Sherritt from @VicRoads

======================

:fp:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

23rd February 2016

Bridge strikes - action needed!

Greetings,

Providing you are not living under a rock, or concerned with political coups, you no doubt noticed that there was a very serious bridge strike in Melbourne yesterday.

A bus was topped, fortunately only minor injuries this time.


http://www.smh.com.au/victoria/bus-crashes-in-south-melbourne-trapping-commuters-20160221-gmzyko.html

There was also a bridge strike at Glasshouse Mountains on the Sunshine Coast Line yesterday as well, disrupting services ( http://railbotforum.org/mbs/index.php?topic=1862.msg169624#msg169624 ).

We have been advocating for years now for some real action to help get this scourge under control.  It will take firm action from here.

This what needs to happen, and happen fast in our opinion.

1.  First offence, 3-6 months automatic licence suspension with fine, and cost recovery. 2nd life with cost recovery.  This might focus some minds.

2.  Education campaigns,  bridge protection  and warnings in all its guises, transport company be responsible for ensuring drivers have safe routes as well as the driver acknowledging their height and loads, and documented safe route selection. The placement of more protective beams will stop strikes on actual bridge structures themselves, but vehicle operators still manage to drive into them with chaos following.  Repetitive bridge strikes might well weaken structures to a point of unpredictable collapse.

3.  In cab warning devices if all else fails -  alarm, preferably a loud klaxon sounds in cab if an oversize vehicle approaches a low level bridge, be it rail over road, or road over road, pedestrian over road.

The bridge that was struck by the bus in Melbourne has been struck at least 95 times (yes 95 times) in the last six years.

Doing nothing from here is not an option.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Can you believe this?

===================

Twitter

Nine News Melbourne ‏@9NewsMelb 4 minutes ago

A day after a bus slammed into the notorious Montague St bridge, a truck has become stuck under it PIC@3AW693 #9News

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

Quote
A day after a bus slammed into the notorious Montague St bridge, a truck has become stuck under it PIC@3AW693 #9News

Obviously wasn't watching the news or papers!!
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

One of the lowest clearance bridges on the rail network.  Booval, next to the station.  Believe or not it gets whacked every now and then.

Passive protection only.



Photograph R Dow 27th February 2016
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob



:fp:
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

3AW Melbourne ‏@3AW693 9 seconds ago

We've just received this photo. No prizes for guessing which bridge is featured here...

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin


ozbob

Twitter

3AW Melbourne ‏@3AW693 1 minute ago

Oh dear. A caller tells us a bus has hit a certain bridge in South Melbourne... Yes, 'that' bridge.

=================

:fp:
Half baked projects, have long term consequences ...