Trains back to Port Adelaide
« on: October 19, 2017, 02:54:56 AM »
Adelaide Now --> New rail spur line bring trains back to Port Adelaide

Quote
ROLLING by train to the heart of Port Adelaide on a new 1km rail spur line is one step closer with builders releasing the first animation of the experience.

Since the Adelaide service was cut in 1981 and the Dry Creek-Port Adelaide railway line closed in 1988, passengers have passed well to the south of the town centre.

Now, where the existing Outer Harbor line veers west at Grand Junction Rd before it crosses Port Rd, a spur line is set to be built directly into the Port, terminating at Baker St.

To coincide with consideration and pending approval by the Parliament’s Public Works Committee on Thursday, Transport Minister Stephen Mullighan released new images of the $16.4 million project, funded in this year’s state budget.

“The new line will link the Port’s commercial centre and the Dock One residential precinct to the Adelaide CBD,” he said.

“It will provide frequent rail services for those who already call the area home and the many more set to live, work and visit Port Adelaide, which is undergoing a major redevelopment.”

The spur line is part of a package of more than $200 million in infrastructure projects committed to in the 2017-18 State Budget, which are expected to be rubber-stamped by the Public Works Committee on Thursday.

The others are the $174.3 million Oaklands Crossing and the $31.4 million relocation of the metropolitan rail Operations Control Centre to Dry Creek from the CBD near SAHMRI.

The Port Dock Railway Line Project will feature dual mainlines and a station at Baker St with a “kiss and drop” car/train connection as well as bus/train interconnection.

Elder MP Annabel Digance welcomed the progress of the Oaklands crossing project, where an underpass will replace a level crossing.

“The Oaklands Crossing is one of the busiest intersections in the southern suburbs and everyone who travels through the area, whether it’s to access local shops and businesses or the aquatic centre, school or medical facilities, knows how much of a difference the underpass will make, she said.

Mr Mullighan said the Port rail project would begin early next year, 37 years after the last city-bound train, and support 48 jobs during construction.

“The new station will be located on the doorstep of Dock One on the waterfront, which will include more than 750 new townhouses and apartments, a refurbished Marine and Harbours building and waterfront boardwalk,” he said.

The project has been welcomed by Port Adelaide Enfield Council and the National Railway Museum, which is next to the new line.
Half baked projects, have long term consequences ...
  Bob's Blog

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 74034
    • RAIL Back On Track
Re: Trains back to Port Adelaide
« Reply #1 on: October 23, 2017, 03:02:41 AM »
https://twitter.com/Robert_Dow/status/922145449405853697
Half baked projects, have long term consequences ...
  Bob's Blog

Offline SurfRail

  • Global Moderator
  • Member
  • *****
  • Posts: 6946
Re: Trains back to Port Adelaide
« Reply #2 on: October 23, 2017, 11:18:11 AM »
Hard to say whether this is actually a good idea.  You'll have 3 branches of the line running in parallel between Woodville and the city, and I can't see any of them being better than every 30 minutes.  Getting a train to Outer Harbour every 15 minutes would have been a better goal in my mind.

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 74034
    • RAIL Back On Track
Re: Trains back to Port Adelaide
« Reply #3 on: October 23, 2017, 12:41:41 PM »
Rail Express --> SA rail works submitted to parliament committee

Quote
Over $200 million worth of rail infrastructure projects from the South Australian government’s 2017-18 budget have been submitted for consideration by the Parliamentary Public Works Committee.

The projects include the $31.4 million relocation of Adelaide metropolitan rail Operations Control Centre from its existing premises near SAMHRI to Dry Creek, the $16.4 million Port Adelaide rail spur, and the $174.3 million Oaklands Crossing.

“South Australia is experiencing a once-in-a-generation infrastructure boom as we deliver the rail, roads, schools and hospitals our state needs,” transport and infrastructure Minister Stephen Mullighan said.

The minister also stressed that the investments would open-up job opportunities for South Australians and support local businesses.

“By setting strict requirements for local content, and putting more apprentices and trainees into work, we’re making sure South Australians reap the benefits of our investments,” he said.

The Port Adelaide rail spur project will reinstate train service to the centre of Port Adelaide for the first time in almost 30 years, linking the Port’s commercial centre and the Dock One residential precinct to the Adelaide CBD.

“It’s exciting to see our plans coming along for returning train services to Port Adelaide for the first time in almost 30 years,” Labor Member for Port Adelaide Susan Close said.

“This is a significant project in the ongoing renewal of Port Adelaide and with more and more people choosing to live and work here it’s important they have access to fast and reliable public transport.”

The Port Dock Railway Line Project will see the construction of new dual mainline connections from the Outer Harbor Line to the Port Spur, as well as track upgrades and the building of supporting infrastructure on the spur line.

A new Port Adelaide Railway Station is also to be built as part of the project, while a new railway signalling system to control the junction and spur line is to be installed.

The relocation of the Adelaide metropolitan rail operations control centre to the Dry Creek depot means that the existing North Terrace centre will be demolished and the site made available for the development of a new medical research facility.

Under the Oaklands Crossing Grade Separation Project, the rail line will be constructed under Morphett Road, along with modifications to road junctions along Morphett Road and Diagonal Road located either side of the rail crossing.

“The Oaklands Crossing is one of the busiest intersections in the southern suburbs and everyone who travels through the area, whether it’s to access local shops and businesses or the aquatic centre, school or medical facilities knows how much of a difference the underpass will make,” Labor Member for Elder Annabel Digance said.

A new 160-metres-long Oaklands Park Railway Station is also to be built that to cater for longer trains and to support the passenger growth on the Seaford line, while on Morphett Road a grade separation of the Marino Rocks Greenway pedestrian and cycling shared use path will be carried out.

“I have long campaigned for this upgrade and it is great to reach another milestone in the project which will have a big impact on the lives of local residents,” Digance said.
Half baked projects, have long term consequences ...
  Bob's Blog

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 


“You can't understand a city without using its public transportation system.” -- Erol Ozan