• Welcome to RAIL - Back On Track Forum.
 

WA - Metronet

Started by ozbob, May 07, 2017, 08:52:22 AM

Previous topic - Next topic

SurfRail

The interesting thing we are seeing is the peak headway is basically 5tph and can't get much better without upgrading the signalling system, buying a lot more trains and (maybe one day) getting rid of through-running Ellenbrook services.
Ride the G:

🡱 🡳