Being new to the forum I'm hoping this post is in the correct area.

I have a bit of a problem with a noise wall and have been advised by neighbours that the track was raised without change to the height of the noise wall in years gone by.

I'm seeking information on the 2005/06 (?) duplication of the Helensvale - Robina section of the Gold Coast line. Any links I've found on the interweb are no longer current. Of particular interest are any technical details of the duplication civil and structural construction works - particularly south of Nerang Station down to Nielsen's Road.

Any assistance on a way forward would be greatly appreciated.

Thanks

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 99640
    • RAIL Back On Track
Re: Gold Coast - Helensvale to Robina Duplication
« Reply #1 on: August 12, 2016, 04:49:09 PM »
Welcome Stephen!

This forum was started ten years ago today (I just realised  :o ) 12th August 2006. 

Perhaps a little past the time of interest, however some members might have resources.  See what happens.

Bob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 99640
    • RAIL Back On Track
Re: Gold Coast - Helensvale to Robina Duplication
« Reply #2 on: August 12, 2016, 05:18:31 PM »
Here is a statement from 2007 which indicates construction was happening then:

http://statements.qld.gov.au/Statement/Id/52045

Quote
Media Statements
Premier and Minister for Trade
The Honourable Peter Beattie

Sunday, May 27, 2007

New trains, new timetable

The first of 44 new QR Citytrains have had their final test run before being pressed into service on the Gold Coast tomorrow morning.

Premier Peter Beattie and Minister for Transport and Main Roads, Paul Lucas, were on board as the new carriages were put through their paces.

“These are state of the art trains and they hit the tracks on the Gold Coast tomorrow morning to significantly boost the number of seats on peak services,” Mr Beattie said.

“We’re putting two, three car sets on-line to provide more than 800 extra seats for Gold Coast commuters.

“More trains are a key election commitment for my Government – and we’re delivering,” Mr Beattie said.

The new trains will allow QR to add another two services on the Gold Coast line with the maiden run departing from Robina station at 7.38 am tomorrow (Monday).

Mr Beattie said the new Citytrains were being built in Maryborough by EDIRail and Bombardier Transportation.

“They’re sleek and can reach a top speed of 130 km/h more quickly than existing trains on the network.

“Stopping power has been improved and they’re more comfortable with bigger seats, more leg room, toilets, plenty of space for luggage, and no doors between carriages.

“Technology hasn’t been left out of the equation either with improved CCTV security systems and LED screens inside every carriage for up to the minute journey information.

“We will spend over $500 million to deliver 44 new three car train sets by the end of 2010,” Mr Beattie said.

Mr Lucas said the new rolling stock would boost QR’s fleet by 30% - that means an extra 30,000 extra seats a day across the network.

“Twenty-two sets will be dedicated to the Gold and Sunshine Coast lines with the remainder to be spread over the suburban Brisbane network,” Mr Lucas said.

”The roll out will give priority to lines with the highest demand.

“It’s another instalment in a multi million dollar overhaul of rail services for the Gold Coast,” Mr Lucas said.

“In addition to new trains, we are also laying more tracks with work already started on a third line from Salisbury to Kuraby.

“We’ve doubled the tracks on the Ormeau to Coomera link on time and on budget and the duplication of the Helensvale to Robina section is underway.

“There are plans in train to extend the line even further south to Varsity Lakes.

“This brings our total investment for Gold Coast rail to more than $350 million on almost 37 kilometres of track and 26 rail bridges for Gold Coast commuters.

“It demonstrates the Queensland Government’s continued commitment to boosting public transport to meet the demands of Australia’s fastest growing region.

“Already public transport patronage has surged by more than 27 per cent since the introduction of Translink in 2004. The new trains will go a long way to ensuring the system keeps pace with demand,” Mr Lucas said.

South East Queensland’s sleek new passenger train fleet will be housed in a large specially built stabling yard at Mayne. The stabling yard will provide security for the trains at night and while they are not in service.

Mr Beattie said the new yard, which was officially opened today, had many state of the art features, including a new graffiti-removal facility, which makes it one of the most efficient and safety-conscious in Australia.

“Once commissioned, the graffiti removal facility has the potential to slash water use by 80 per cent when removing graffiti,” Mr Beattie said.

“Stage One of the stabling yards cost $11.5 million. The second stage commits another $7 million in State Government funding to build an extension to the yard.

“The new facility makes QRs Citytrain operation more efficient.

“The centralised location of trains allows more efficient scheduling, as trains have less distance to travel at the start and end of each day,” Mr Beattie said.

Mr Lucas said the new graffiti removal facility was a heavy duty cleaning area using special power hoses to quickly remove graffiti and reduce the time that trains are inactive.

“Improved security at the yard also reduces the likelihood of graffiti and other damage to the trains when they are stabled,” Mr Lucas said.

“QR is finding it increasingly difficult to stable trains in outer Brisbane locations due to noise complaints from residents. By increasing the capacity of Mayne Yard, QR eliminates the need to stable more trains at these locations,” Mr Lucas said.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 99640
    • RAIL Back On Track
Re: Gold Coast - Helensvale to Robina Duplication
« Reply #3 on: August 12, 2016, 05:22:49 PM »
Bit more ..

From Brisbanetimes click here!

Rail upgrade to add 30 mins to Gold Coast commute

Quote
Rail upgrade to add 30 mins to Gold Coast commute
Tony Moore | April 9, 2008 - 3:14PM

Work will begin tomorrow on the $70 million track duplication of the Helensvale to Robina rail line, forcing Gold Coast trains onto a different timetable.

Buses will replace some trains and they will take an extra 30 minutes to make the journey.

Four morning services and five afternoon services between Robina and Beenleigh will operate on an altered timetable tomorrow and Friday.

Queensland Rail (QR) will then close the track between Coomera and Robina stations from 8pm on Friday until the last train on Sunday, April 13.

This will affect all inbound and outbound services between the two stations, with buses replacing train services for the duration of this period.

Buses will also run directly to Brisbane Airport.

QR passenger services executive general manager Andy Taylor said customers travelling on the buses would have an extra 30 minutes added to their trips.

As part of the track duplication project, a new 16.6km second track is being built between Helensvale to Robina to provide more train services from Beenleigh and the Gold Coast.

The second rail track will be finished between Helensvale and Nerang by Monday, with the stretch from Nerang to Robina ready by August.

Once this work is done, there will be the rail capacity to run extra train servives from Robina.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  Twitter

Offline StephenA

  • Member
  • *
  • Posts: 2
Re: Gold Coast - Helensvale to Robina Duplication
« Reply #4 on: August 12, 2016, 05:36:13 PM »
Thanks Bob,

I appreciate the welcome. It looks like it was completed the month I settled on the house.

My research also shows QR and the State government were trumpeting the new 3 car trains - I remember them from some time ago however all trains are now 6 cars. Also odd I haven't found anything in the annual reports about completion of the duplication.

Hopefully there's a member out there that has the history to fill in the gaps.

Thanks again.

Offline SurfRail

  • Global Moderator
  • Member
  • *****
  • Posts: 8277
Re: Gold Coast - Helensvale to Robina Duplication
« Reply #5 on: August 13, 2016, 01:24:13 PM »
The works were all finished circa 2008.  I remember the local member Alex Douglas indicating some people were concerned about it at the time but I've never heard anything subsequently.
Ride the G:

 