• Welcome to RAIL - Back On Track Forum.
 

Hurstbridge rail line upgrade

Started by ozbob, April 27, 2016, 17:55:05 PM

Previous topic - Next topic

ozbob

http://levelcrossings.vic.gov.au/hurstbridge-rail-line-upgrade

Hurstbridge rail line upgrade

The Victorian Government has committed funding to upgrade the Hurstbridge line to improve the frequency and reliability of services in Melbourne's north east. By removing a significant bottleneck on the Hurstbridge line, services can be optimised, with flow-on benefits for the South Morang line. These improvements on the South Morang line will be a result of a more regulated service from Hurstbridge travelling through Clifton Hill, where the two lines join.

The Level Crossing Removal Authority (LXRA) is already delivering major rail construction projects across Melbourne and has the design, engineering and project management expertise to deliver the Hurstbridge line upgrade.

Overview

The Hurstbridge line upgrade will include:

    Duplication of the single-track section of rail line between Heidelberg and Rosanna, removing a significant bottleneck, with associated power and signalling work
    Redesigning the timetables for the Hurstbridge and South Morang lines to achieve additional services and improved reliability on both lines
    Removal of the Lower Plenty Road level crossing in Rosanna
    Building a new train station at Rosanna
    Removal of the level crossing on Grange Road in Alphington - community consultation is currently underway
    Addition of a new bus route between Greensborough and Diamond Creek
    Investigation into further public transport benefits for the north east of Melbourne

More > http://levelcrossings.vic.gov.au/hurstbridge-rail-line-upgrade
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

http://www.premier.vic.gov.au/early-works-start-on-hurstbridge-line-transformation/

Early Works Start On Hurstbridge Line Transformation

Premier Media Release

17 May 2016

Early works have begun on the Andrews Labor Government's transformation of the Hurstbridge line.

Premier Daniel Andrews joined Minister for Public Transport Jacinta Allan near Heidelberg today, where geotechnical and site investigations are being carried out to help start the construction of a second track between Heidelberg and Rosanna.

Last month's Victorian Budget 2016/17 provided $140 million to duplicate the line and build a new tunnel alongside the existing tunnel in Heidelberg, so trains can run in both directions at once for the first time.

This notorious single section of track holds back the entire line – limiting the number of services as trains are forced to wait for trains to pass in the opposite direction.

Power and signalling on the line will also receive a major upgrade as part of the project, which will reduce delays, improve reliability, and allow more trains in peak hour.

In addition to this project, the dangerous and congested level crossings at Grange Road in Alphington and Lower Plenty Road in Rosanna will be removed.

These crossings are amongst Melbourne's worst, with boom gates down at both locations for around half-an-hour in the two-hour morning peak, holding up traffic and putting lives at risk.

The geotechnical investigations will involve drilling 100mm holes up to 25 metres deep near the intersections of Burgundy Street and Studley Road, and Darebin and Hawdon Street, in Heidelberg.

These investigations will provide information about the ground conditions at the site, which will inform the design of the project, and how it is constructed.

The geotechnical and site survey works will take around four weeks. Construction of the project will start before the end of the year and be finished by 2019.

Investigations, planning and design work will also begin into duplication of another single section of track between Greensborough and Eltham.

Quotes attributable to Premier Daniel Andrews

"This notorious single section of track needs duplicating for passengers in the north east to have the frequent and reliable services they deserve – we're getting it done, and work starts now."

"Removing this notorious bottleneck means we can run more trains in peak hour when we need them most."

Quotes attributable to Minister for Public Transport, Jacinta Allan

"Melbourne's north is growing and we're building for that growth – transforming the Hurstbridge line and extending the South Morang Line to Mernda."

"We're delivering trains more often so people spend less time on platforms and more time with family and friends."
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

Arnz

Rgds,
Arnz

Unless stated otherwise, Opinions stated in my posts are those of my own view only.

Fares_Fair

^^ :'( :'(

Queensland can only look on to every other state in the nation and cry for what we won't receive, i.e. critical nation building infrastructure like #2tracks which will boost freight rail all the way up to Cairns.

Regards,
Fares_Fair


ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X  Threads  Mastodon  BlueSky

🡱 🡳