Media release 10th October 2014



SEQ: BaT - another political con trick?

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers has said there is growing concern with the lack of detailed public information on operational aspects of the Bus and Train (BaT) tunnel, and the overall merits of the project.

Robert Dow, Spokesman for RAIL Back On Track said:

"Our members have attended consultation sessions for the BaT. They have expressed concerns with the lack of detailed operational information on how this tunnel will work, particularly the bus aspects."

"From the outset there has been concerns from transport planners that the concept is flawed (1). Others are now coming to similar conclusions - this is a very flawed project (2)!"

"These concerns are not being addressed.  What future proofing is there for the bus component? Clearly single unit buses will not be able to meet the eventual passenger demands. This is a once in a generation opportunity and to paralyse future transport options for Brisbane and south-east Queensland on political whimsy is seriously flawed."

"Brisbane bus issues can be fixed by implementing proper network review, and establishing proper bus priority on the surface network. Why waste billions of dollars?"

"If the BaT goes ahead as it is seem to be planned for, the end point will be a conga line of buses in the bus component similar to the Victoria Bridge bus conga lines.  Really, is this getting anywhere for the longer term?"

"Eventually electric bi-artic buses, or even a rubber tyred metro system will need to operate in the bus component of the tunnel to handle the pax loads. This means there be multiple transfers for bus passengers, the bus network will be forced to operate as a trunk and feeder model. Meanwhile, rail passengers will have seamless rides into the new underground stations."

"A serious question is:  Why is there no combined bus and train tunnel anywhere in the world?"

"The answer is obvious.  No other jurisdiction has been as stupid as Queensland appears to be."

"Questions on the planned operational aspects need comprehensive and detailed explanations before wasting billions of dollars!"

References:

1. Bus and rail tunnel all show and no substance: transport expert
http://www.brisbanetimes.com.au/queensland/bus-and-rail-tunnel-all-show-and-no-substance-transport-expert-20131118-2xrab.html#ixzz3DDY3F0p7

2. Submission by P. Stewart re BaT EIS http://backontrack.org/docs/crr/Stewart.pdf from http://railbotforum.org/mbs/index.php?topic=9972.msg147298#msg147298

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

11th October 2014

Re: SEQ: BaT - another political con trick?

Greetings,

The sad thing to consider is this.  There are no qualms in resuming residential properties for road widening, e.g. Lytton Road.  This has limited advantages for few suburbs. There are lot more property resumptions to come with further stages as well.

However, it is apparently fine to compromise a multi-billion dollar 'once in a generation'  public transport project because of a reluctance and lack of political courage to resume properties, with the consequent negative massive flow on implications for all of SEQ.

Half baked projects, have long term consequences ...

Good luck SEQ, you are going to need it.  Mediocrity  is the hallmark of transport policy in Queensland.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org

Quote from: ozbob on October 10, 2014, 03:01:58 AM
Media release 10th October 2014



SEQ: BaT - another political con trick?

RAIL Back On Track (http://backontrack.org) a web based community support group for rail and public transport and an advocate for public transport passengers has said there is growing concern with the lack of detailed public information on operational aspects of the Bus and Train (BaT) tunnel, and the overall merits of the project.

Robert Dow, Spokesman for RAIL Back On Track said:

"Our members have attended consultation sessions for the BaT. They have expressed concerns with the lack of detailed operational information on how this tunnel will work, particularly the bus aspects."

"From the outset there has been concerns from transport planners that the concept is flawed (1). Others are now coming to similar conclusions - this is a very flawed project (2)!"

"These concerns are not being addressed.  What future proofing is there for the bus component? Clearly single unit buses will not be able to meet the eventual passenger demands. This is a once in a generation opportunity and to paralyse future transport options for Brisbane and south-east Queensland on political whimsy is seriously flawed."

"Brisbane bus issues can be fixed by implementing proper network review, and establishing proper bus priority on the surface network. Why waste billions of dollars?"

"If the BaT goes ahead as it is seem to be planned for, the end point will be a conga line of buses in the bus component similar to the Victoria Bridge bus conga lines.  Really, is this getting anywhere for the longer term?"

"Eventually electric bi-artic buses, or even a rubber tyred metro system will need to operate in the bus component of the tunnel to handle the pax loads. This means there be multiple transfers for bus passengers, the bus network will be forced to operate as a trunk and feeder model. Meanwhile, rail passengers will have seamless rides into the new underground stations."

"A serious question is:  Why is there no combined bus and train tunnel anywhere in the world?"

"The answer is obvious.  No other jurisdiction has been as stupid as Queensland appears to be."

"Questions on the planned operational aspects need comprehensive and detailed explanations before wasting billions of dollars!"

References:

1. Bus and rail tunnel all show and no substance: transport expert
http://www.brisbanetimes.com.au/queensland/bus-and-rail-tunnel-all-show-and-no-substance-transport-expert-20131118-2xrab.html#ixzz3DDY3F0p7

2. Submission by P. Stewart re BaT EIS http://backontrack.org/docs/crr/Stewart.pdf from http://railbotforum.org/mbs/index.php?topic=9972.msg147298#msg147298

Contact:

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳