Interesting but the busway carries 3x the 2046 forecast currently. It would be cheaper to construct lrt or brt due to less stringent engineering requirements which would allow a longer line. I also disagree with direct to the cbd, and the reasons for not using shuttle, they make it sound like systems in toronto, paris etc can't exist! With a shuttle you can increase frequency right out to packenham.