Terms of use Privacy About us Media Contact

Author Topic: MOVED: Half-Baked infrastructure projects  (Read 1437 times)

Offline ozbob

  • Administrator
  • Member
  • *****
  • Posts: 93161
    • RAIL Back On Track
MOVED: Half-Baked infrastructure projects
« on: March 15, 2014, 05:58:54 PM »
This topic has been moved to Infrastructure.

http://railbotforum.org/mbs/index.php?topic=4701.0
Half baked projects, have long term consequences ...
Instagram   Facebook  @ozbob13@mastodon.social

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 


“You can't understand a city without using its public transportation system.” -- Erol Ozan