• Welcome to RAIL - Back On Track Forum.
 

25 Jan 2014: SEQ: Bridge strikes and level crossing incidents continue ...

Started by ozbob, January 25, 2014, 03:49:57 AM

Previous topic - Next topic

ozbob

Decent protection Annerley Road Dutton Park now

Bridge protection - Dutton Park Annerley Road rail over road bridges

--> http://railbotforum.org/mbs/index.php?topic=10943.0
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

http://translink.com.au/travel-information/service-notices/26211/details

Ipswich, Rosewood and Springfield line trains suspended both directions

Last updated: 8.48am Wednesday 22 October 2014

Ipswich, Rosewood and Springfield line trains are suspended in both directions between Roma Street and Corinda stations due to a bridge strike on Sylvan road, Toowong. Customers can expect delays of up to 30 minutes.

Bridge inspectors are en route.

Some inbound and outbound services will be rerouted by the Tennyson line.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Bertha St Goodna, road and rail bridges ...

Recent addition of tell tails ..









Photographs R Dow 29th October 2014
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

Over the weekend I noticed the infamous underpass at Morayfield (behind the shopping centre) had strike damage - to the sign!!!

The tell tales hang down about 20-25 cm from the sign  :frs:

My vote is always for the beam installation - slice the top off the truck first. Surely long term that would be cheaper than dragging out the bridge inspectors.

Stillwater

Goodna has one of the most unattractive entrances to a suburb off the major road network.  Is there a bit of money in the QR and TMR budget for some public art, maybe even some trees in huge pots (so they can't be nicked) and a bit of lighting in the 'tunnel' powered by some solar panels.  It just requires a bit of imagination, a paint donation from the hardware store and an outdoor art class involving the kids from the local school overseen by an arty person.  PARTnership Program?

ozbob

Twitter

3AW Melbourne ‏@3AW693 30 minutes ago

Truck stuck under the Napier St bridge in Footscray... again. @RossAndJohn: "Give them a ruler" (Pic: @tijana_jayne)

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Margaret Paul ‏@margaretpaul 44 minutes ago

Hey trucks, you definitely *can't* fit under the Napier St bridge at Footscray. @abcnewsmelb

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin


ozbob

https://www.facebook.com/photo.php?fbid=901063833245311

Queensland Rail

At approximately 5.30am this morning a boom gate was struck at the Blackwood Street level crossing in Mitchelton.

Our crews have carried out repairs and during this time trains were able to proceed through the area safely at a restricted speed.

This is a reminder for everyone to be vigilant around level crossings, especially as we enter the silly season. #qr

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Penny Dahl ‏@Pennycopter 4 minutes ago

Truck has lost crane after hitting overpass Main St outbound at Shaftston Ave in Kangaroo Point, delays #bnetraffic

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Melbourne ..

Twitter

Nine News Melbourne ‏@9NewsMelb 4 minutes ago

South Melbourne's Montague Street Bridge has claimed another victim, after a truck was caught this morning. #9News

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Another strike on the Ippy earlier as well ..

=============

http://translink.com.au/travel-information/service-notices/36541/details

Trains suspended: Milton-Toowong

Last updated: 11.35am Monday 16 February 2015

Ipswich and Springfield line trains are suspended in both directions between Milton and Toowong stations due to a bridge strike at Cue Street, Auchenflower. Customers can expect delays of up to 30 minutes.

Technicians are en route.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky


ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

7 News -->  Truck driver jailed for tragic mistake

A grandfather's fatal mistake not to measure the height of his truck has landed him behind bars for eight months. Michelle Rattray reports.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Sent to all outlets:

28th February 2015

Bridge strikes and level crossing breeches

Greetings,

A sad outcome  7 News -->  Truck driver jailed for tragic mistake

A grandfather's fatal mistake not to measure the height of his truck has landed him behind bars for eight months.


It is to the credit of the former Minister for Transport Mr Emerson  that he did move to ensure protective beams were placed on the approaches to this rail over road bridge Annerley Road Dutton Park.

Photographs --> http://railbotforum.org/mbs/index.php?topic=10943.msg146063#msg146063

Bridge strikes are still happening regularly on our transport network.  Continuing placement of protective beams and upgraded warning systems are needed.

It is also time in our opinion that a zero tolerance approach is taken to not only bridge strikes but fools driving into boom gates and disregarding basic road rules.

First offence for a bridge strike or level crossing breach should be an automatic 12 month suspension, plus full financial costs for the mayhem caused.  Second offence life suspension plus full costs.

These are very serious offences with potentially grave outcomes. Time the gloves came off.

Thank you.

Best wishes
Robert

Robert Dow
Administration
admin@backontrack.org
RAIL Back On Track http://backontrack.org
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Quote from: ozbob on March 11, 2015, 09:44:55 AM
Brisbanetimes --> Truck breaks through boom gates

Ratbags, idiots, fukwits abound!  Put them off the road for life!! 

Get the gloves off, these idiots do not deserve to be or should be driving vehicles, they are far too irresponsible ...
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Fares_Fair

... and they just keep on coming

Ch 10 ran this story tonight, titled Boom gate smash

Air Date Wed 11 Mar 2015 Duration - 01:46

http://tenplay.com.au/news/brisbane/2015/3/11/boom-gate-smash

Regards,
Fares_Fair


ozbob

^ disturbing video footage.  Thanks for doing the interview FF.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Herald Sun --> Truck slices off roof trying to drive under Albert Park rail bridge

Dashcam footage has captured the moment a truckie tried to pass underneath a low tram bridge in Melbourne.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

red dragin

My wife's step father has an ex Budget rental truck - the drive on your car licence type.

On the top edge of the speedo/rpm gauges is a Brother P - Touch style label stating the vehicle height.

Not that expensive to do - even a bit of paper and some clear sticky tape would do the job!

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Maribyrnong Leader ‏@maribyrnongldr 22h

Melbourne's most hit rail bridge to get a $600,000 upgrade >>http://bit.ly/1GKkteV  #MelbsWest #Footscray

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Yet another ...

==============

Twitter

QPS Media Unit ‏@QPSmedia 15 minutes ago

North St Toowoomba closed btw Davidson and Mort Streets. Truck stuck railway bridge. Closed for a couple of hours, seek altroute #qldtraffic
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

 :fp:

================

Twitter

Robert Dow ‏@Robert_Dow 5m

Enough, time something was done @MarkBaileyMP @jackietrad @tmr yet another bridge strike on the Ippy > http://railbotforum.org/mbs/index.php?topic=1862.msg158780#msg158780 ... #qldpol
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

This ...

=================

Twitter

Transport Main Roads ‏@TMRQld 9 minutes ago

Bridge strikes affect traffic and commuters. Know your road signs? Visit http://qld.gov.au/transport/safety/signs/types/ ...

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

3AW Melbourne ‏@3AW693  5 minutes ago

JUST IN | A truck has hit a bridge in Footscray.

Werribee + Williamstown trains are delayed (pic Jayne Howarth).



===============

::)

Appears has struck the protective beam .. not the bridge itself
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Sky News Australia ‏@SkyNewsAust  6m

Passengers injured after bus has roof sheared off after hitting low bridge in France

http://www.skynews.com.au/news/world/europe/2015/07/27/passengers-injured-after-bus-hits-low-bridge.html ...

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

ozbob

Twitter

Robert Dow ‏@Robert_Dow 14m

Yet another bridge strike > http://railbotforum.org/mbs/index.php?topic=1862.msg160314#msg160314 ... time for action! @MarkBaileyMP @jackietrad @TMRQld How long before more deaths & mayhem?

===================

^

Twitter

Penny Dahl ‏@Pennycopter 2m

Uh oh...truck has failed to limbo under the Logan Rd rail bridge at the Gabba. Trains suspended #bnetraffic

Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

#Metro

That one is outside Buranda IIRC. That gets hit all the time.

The concrete is pretty strong on that one. More worried about it being a bus with pax next time, roof shaved off / people decapitated...
Negative people... have a problem for every solution. Posts are commentary and are not necessarily endorsed by RAIL Back on Track or its members.

ozbob

Yes, the bridge is stronger than a brick-sh%thouse ...  buses (single deck) fit under it OK.  Have taken a lot of pics there.

The idiots driving trucks need sorting.  It is only a matter of time before another serious disaster.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

🡱 🡳