Queensland UTC +10
Terms of use Privacy About us Media Contact

Links

Author Topic: 25 Jan 2014: SEQ: Bridge strikes and level crossing incidents continue ...  (Read 10978 times)

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 68865
    • RAIL Back On Track
Re: 25 Jan 2014: SEQ: Bridge strikes and level crossing incidents continue ...
« Reply #120 on: October 20, 2015, 05:30:48 PM »
Canberra

Prime7 --> Traffic chaos after truck smashes into Acton Tunnel causing partial collapse

Quote
An excavator on a low-loader truck has badly ripped up the busy Acton Tunnel, plunging Parkes Way traffic into chaos and sparking health fears.

No one was hurt in the accident, which occurred around 10:20am, but it was feared the tunnel roof contained asbestos fibres.

The driver of the truck was spoken to at the scene.

A one kilometre exclusion zone was established down wind, shutting westbound lanes and reducing eastbound traffic down to one lane ...

Oh fuking dear ... fukwits everywhere hey?
Half baked projects, have long term consequences ...
  Bob's Blog

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 68865
    • RAIL Back On Track
Re: 25 Jan 2014: SEQ: Bridge strikes and level crossing incidents continue ...
« Reply #121 on: October 21, 2015, 10:10:15 AM »
Twitter

News Talk 4BC 1116 ‏@NewsTalk4BC 2h

Ray mentioned the damage done by a truck to the Acton Tunnel in Canberra. What a mess!

Half baked projects, have long term consequences ...
  Bob's Blog

Online ozbob

  • Administrator
  • Member
  • *****
  • Posts: 68865
    • RAIL Back On Track
Re: 25 Jan 2014: SEQ: Bridge strikes and level crossing incidents continue ...
« Reply #122 on: October 22, 2015, 08:35:40 AM »
^

Canberratimes --> Asbestos in Parkes Way tunnel slows re-opening
Half baked projects, have long term consequences ...
  Bob's Blog

 

Sitemap 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 


“You can't understand a city without using its public transportation system.” -- Erol Ozan