• Welcome to RAIL - Back On Track Forum.
 

New trial route 661 (Deception Bay to North Lakes)

Started by ozbob, July 10, 2012, 07:44:10 AM

Previous topic - Next topic

ozbob

http://jp.translink.com.au/travel-information/service-updates/details/1341445195

New trial route 661 (Deception Bay to North Lakes)

Last updated: 4.18pm Friday 6 July 2012

Leave the car at home and catch new route 661 to Westfield North Lakes or Deception Bay shopping centre.

From Monday 23 July, new route 661 will operate as a trial service for 12 months.

Running seven days a week, the service will run half hourly Monday to Friday, half hourly on Saturdays, and hourly on Sundays and public holidays.

You'll also have better connections to train services from nearby stations at Narangba and Petrie. Jump on the 668 from Deception Bay shopping centre (for Narangba), or routes 680, 682, and 687 at Westfield North Lakes (for Petrie).

Enjoy the new one-seat journey on our new route 661 (North Lakes to Deception Bay). From Monday 23 July.
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

Golliwog

No .pdf available as yet, but it has been loaded into the JP if you put the date forward to the 23rd July.

Heres the outbound route: http://jp.translink.com.au/travel-information/network-information/service-information/outbound/9738/1723745/2012-07-23
There is no silver bullet... but there is silver buckshot.
Never argue with an idiot. They'll drag you down to their level and beat you with experience.

ozbob

This is a hail and ride route.  TransLink moved to drop all hail and ride in the Ipswich area.

Guess this is an economy move for the 661 no stop expenses ...

--------------------------
http://jp.translink.com.au/travel-information/service-updates/details/1341445195

New trial route 661 (North Lakes to Deception Bay)

Last updated: 5.03pm Monday 23 July 2012

Leave the car at home and catch new route 661 to Westfield North Lakes or Deception Bay shopping centre.

New route 661 will operate as a trial service for 12 months. Simply hail 'n' ride anywhere along the route (provided it's safe for the driver and passengers for the bus to stop).

Operating seven days a week, the service runs half hourly Monday to Friday, half hourly on Saturdays, and hourly on Sundays and public holidays.

You've also got better connections to train services from nearby stations at Narangba and Petrie. Jump on the 668 from Deception Bay shopping centre (for Narangba), or routes 680, 682, and 687 at Westfield North Lakes (for Petrie).

Enjoy the new one-seat journey on our new route 661 (North Lakes to Deception Bay).
Half baked projects, have long term consequences ...
Ozbob's Gallery Forum   Facebook  X   Mastodon  BlueSky

techblitz

turns what was a 34 minute double connection 680/660 trip to dbay to a nice 18 minute single trip.Well done translink.

🡱 🡳